Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Who's Afraid of the Mines Inspector?

    By G Neely

    COPING WITH COMPLEXITY In every industry, and mining is no exception, plant and processes increase in complexity over time and managers and operators need correspondingly more knowledge. The mine ma

    Jan 1, 1994

  • AUSIMM
    A Cut-Off of Liberated and Selected Ore Minerals Optimisation Based on the Geometallurgy Concept

    By G Turner-Saad

    An improvement to cut-off grade optimisation theory based on geometallurgy has been completed. The improvement fundamentally consisted of taking into account mineralogical and textural characteristics

    Sep 5, 2011

  • AUSIMM
    A Sustainable Future in Management of Dust Emission during Transport of Coal and Iron Ore

    By J Planner

    As Australia’s coal and iron ore export volumes increase to meet international market growth, port terminals, mining operations and rail transport systems can be the source of increased dust emission.

    Nov 22, 2011

  • AUSIMM
    Effect of Carbon Type on Adsorption of Cu, Zn, Ag and Au from Mixed Cyanide Solution

    By S Lakemond, L I. Ku, J Vaughan

    Conventional processing of poly-metallic gold containing flotation concentrates are challenging for a number of reasons. One reason is that substantial copper and zinc in the cyanide leach solution co

    Sep 26, 2013

  • AUSIMM
    Cap Rock Blasting Improvement at Worsley Alumina

    By L Neems

    In conjunction with Orica Explosives, Worsley Alumina have managed a program of continuous improvement to their cap rock blasting over the last two years. Blasting conditions are challenging because o

    Jan 1, 1999

  • AUSIMM
    Project Feasibility Studies - A Necessary Step or the Best Opportunity to Add Value and Certainty?

    By J Borthwick, M Yusi, M Douge

    Feasibility studies form a vital and significant component of the project delivery cycle. They are at the heart of the valuation process. This paper focuses on variables which can affect a project and

    Jan 1, 2009

  • AUSIMM
    The basics of grinding circuit optimisation

    By A Giblett, B Putland

    This paper provides a simple guiding framework for grinding circuit optimisation, focussing on common themes in past optimisation success stories, the conditions for success and techniques that can be

    Aug 29, 2018

  • AUSIMM
    TodayÆs Mine Manager ù Technical Expert or Business Guru?

    The mine manager is one of the oldest jobs in the world. Over many centuries the fundamentals of how this job was approached did not change much. However since the later part of the 1980s there has be

    Jan 1, 2006

  • AUSIMM
    Iran Mining Industry Based on the 20-Year Perspective 2025

    By F Rashidinejad

    Iran has had an active mining sector for some 7000 years. Exceptional in terms of its mineral diversity, Iran produces 62 minerals, and is ranked among the world’s 15 most mineral-rich countries. Many

    Nov 22, 2011

  • AUSIMM
    A Methodology for Rock Mass Characterisation to Control Blast-induced Vibrations

    By A Karrech, E Hamdi

    The uncertainty of geomaterials properties is commonly encountered in resource engineering applications, especially in mining engineering where the rock mass texture, joints, fractures and damage zone

    Aug 24, 2015

  • AUSIMM
    Never Touch a Running System - Longwall Cutting Sequences and their Potential

    The optimisation and validation of shearer cutting methods is a time consuming engineering task. Many different parameters, of which not all can be controlled, can vary. The easiest solution, to incre

    Dec 6, 2010

  • AUSIMM
    High Energy Bulk Explosives and Mine to Mill Focus – the Mt Rawdon Story

    By D Morton, G Wallace

    "Evolution Mining is the sole owner of the Mt Rawdon open cut operation, located 75 km south-west of Bundaberg in Queensland, Australia (Figure 1). It is a massive, volcanically hosted, low-grade gold

    Nov 15, 2016

  • AUSIMM
    Estimating Mineralogy in Bulk Samples

    By R Berry

    This paper looks at two ways to estimate the bulk mineralogy of the rocks for assay intervals. The aim is to find an efficient indicator of the most common minerals in the rock. Phase (modal) analysis

    Sep 5, 2011

  • AUSIMM
    New Zealand Gold Potential - Using Mineral Prospectivity Modelling to Evaluate Gold-Bearing Mineral Systems in an Underexplored Country

    By K Peters, C McKenzie

    New Zealand has an established history of gold production beginning with the gold rushes of the 19th century in the Coromandel, Nelson/Marlborough, West Coast and Otago regions. Despite this, the numb

    Sep 26, 2013

  • AUSIMM
    Improved Trigger Action Response Plan Development Based Upon Mine-specific Data

    By D Cliff, B Belle

    Trigger action response plans (TARPs) are inherent to managing multiple hazards such as high gas content with multiple coal seams, high spontaneous combustion propensity, heat and ventilation. TARPs a

    Aug 31, 2015

  • AUSIMM
    The role of the regulator in promoting a highly reliable mining industry

    By S Johnston, L Howe, S Stevens

    Regulators have an important role to play in fostering and enabling reliable, effective, environmental management. Given this, it is perhaps surprising that there has been relatively little debate on

    Aug 2, 2023

  • AUSIMM
    Practicalities of the use of fayalite slags for recovery of metals from urban wastes

    By E Jak, J Chen, B Hogg, S Nikolic, S Nicol

    The quantity of post-consumer ‘waste’ materials generated each year is rapidly increasing. These materials can contain significant quantities of critical metals and present an environmental challenge

    Jun 19, 2024

  • AUSIMM
    Automated omission-free geotechnical deformation monitoring – a new method deployable by non-specialists

    By J Franke, C Gonzalez

    One of the regular tasks of geotechnical and mining engineers is the measurement and management of deformation in underground excavations. Although several methods are used to do so, the incumbent met

    Nov 29, 2022

  • AUSIMM
    Practical Considerations and Shortcuts in Sampling

    By D M. Frantois-Bongarton

    "A few situations are first reviewed where practical shortcuts lead to acceptable solutions where none seemed to be possible. These include: The solving of many complex sampling optimisation problem

    Aug 21, 2012

  • AUSIMM
    On equitable distribution of mining wealth and the social licence to operate imperative – an African case study

    By S Roberston, G Batt, R Shanahan, B Shah, A Trench, H Bromfield

    The geographic imperative of ore systems leaves mining, more so than virtually any other aspect of modern industry, heavily dependent on obtaining and maintaining social licence to operate. A prospect

    Nov 21, 2018