Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Design and Operation of Backfill for Reliable High Solids Concentration Discharge

    By A G McLean

    This paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying p

    Jan 1, 1998

  • AUSIMM
    Deriving maximum value from mineral waste streams

    By D Osborne

    Current mineral extraction and valorisation activities still have a strong focus on the ‘delivered product(s)’ which might be a bulk commodity such as metallurgical coal, hematite, bauxite, etc., and

    Sep 1, 2024

  • AUSIMM
    Design and Construction for the Widening of the M2 Norfolk Twin Tunnels

    By A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys

    The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o

    Sep 17, 2014

  • AUSIMM
    Operating Performance of the Phu Kham IsaMill™

    By G Harbort, D Zoetbrood

    "The Phu Kham copper-gold operation in the Laos People’s Democratic Republic (PDR) is owned and operated by Phu Bia Mining Limited. PanAust Limited holds a 90 per cent interest in Phu Bia Mining Limit

    Oct 10, 2016

  • AUSIMM
    Do we Need a Gravity Circuit or Not? A Case Study in Applying Best Practice

    By A Giblett, K Afewu

    This paper uses a case study to demonstrate best practices techniques for predicting the contribution of gravity concentration in a gold recovery process flowsheet. The case study was selected as an e

    Sep 7, 2015

  • AUSIMM
    Direct Chill Casting of Aluminium at Comalco, Bell Bay

    Comalco's Bell Bay smelter produces some 94 000 t.p.a. of primary aluminium in the form of foundry alloys, extrusion billet and rolling blocks. The extrusion billet and rolling block are produ

    Jan 1, 1977

  • AUSIMM
    Evolution of rock fill consolidation at Pajingo Gold Mine

    By J Carswell, K McTyer

    The Pajingo gold operation in Queensland is approximately 50 kilometres south of Charters Towers and 134km south-west of Townsville. The resource was discovered in 1983 and first open pit gold product

    Nov 30, 2018

  • AUSIMM
    A Fortunate Life – 45 Years in Heavy Minerals

    By A R. Sale

    This paper highlights two aspects of the mineral sands industry in Australia: the development of the industry from approximately 1870 through to 1980, and the author’s experience in the industry from

    Oct 5, 2011

  • AUSIMM
    Testing of Soil Covers for Waste Rock in the Ronneburg WISMUT Mine Closure

    By S Jahn, M Noel, E M. Rykaart, M Pau

    Three soil cover test areas were constructed on waste rock backfilled into the Lichtenberg Pit, near Ronneburg Germany. A fourth, uncovered area was included as a control. Each test area measures 50 m

    Jan 1, 2003

  • AUSIMM
    When Best Water Use Efficiency is Not Enough, What Can the Mining Industry Do?

    Water is required as a key strategic resource in most mining and metallurgical processes and, in some countries, it has become a limiting supply for the development of mining activity. During the last

    Jan 1, 2009

  • AUSIMM
    Four-Dimensional Network Relaxation Method for Long-Term Open Pit Mine Scheduling

    By J Yamatomi, Y Tamanishi, S Miwa

    The four-dimensional (4D) network relaxation method, originally developed by Akaike in 1999, uses Lagrange relaxation and is known for its ability to include the price change and possible better outpu

    Sep 26, 2011

  • AUSIMM
    Environment Risk Management ù Towards Proactive Sustainability

    Stringent environmental benchmarks imposed by governments and successful legal challenges in the country of origin have changed the risk profile for all mining companies over recent years. In developi

    Jan 1, 2003

  • AUSIMM
    A Computerised Cataloguing System for Geological Specimens

    A computerised cataloguing system for geological specimens is described. The catalogue is designed for use with a compactus-type storage system. The information stored in the catalogue for each specim

    Jan 1, 1974

  • AUSIMM
    Common Geological Characteristics of Prominent Hill and Olympic Dam ù Implications for Iron Oxide Copper-Gold Exploration Models

    The Prominent Hill copper-gold deposit is located approximately 150 km north west of Olympic Dam, on the southern margin of the Mount Woods Inlier in South Australia. Its discovery in November 2001 re

    Jan 1, 2004

  • AUSIMM
    Forging Ahead - A Collaboration Between the OZ Minerals Prominent Hill Concentrator and Magotteaux to Improve Plant Performance

    By PáDeáBosscher, A Bruwier, M Weidenbach, C Philippe, T Ly, A Van Den Bosch

    In the mining business the cost of grinding media represents up to 40 per cent of the total milling cost and therefore grinding media optimisation has a direct impact on the concentratorsÆ bottom line

    Oct 29, 2012

  • AUSIMM
    Interpretation of South Australia's Mining Heritage

    By Selby J

    South Australia's economic development has relied heavily on the mineral industry. In the late 1840s the rich copper deposits at Kapunda and Burra saved the Colony's economy when South A

    Jan 1, 1987

  • AUSIMM
    Water Flow in Uncovered Waste Rock ù A Multi-Year Large Lysimeter Study

    By L Smith, R Beckie

    An intermediate scale (8 m + 8 m + 5 m high) constructed waste rock pile experiment was built upon a contiguous grid of 16 gravity drainage lysimeters to investigate the flow of water in unsaturated w

    Jan 1, 2003

  • AUSIMM
    And Still we did not get a Permit

    This paper reviews recent positive developments in Europe on the regulation of gold mining. However, it also examines the problem that while gold projects may be bankable and technically and environme

    Jan 1, 2007

  • AUSIMM
    Transient slag behaviour in the Direct Reduced Iron (DRI) and scrapbased Electric Arc Furnace (EAF) process – case study for high and low-grade DRI input

    By S K. Panda, M A. Van Ende, S Chatterjee

    Tata Steel Netherlands (TSN) aims to reduce its CO2 emissions by 35–40 per cent by 2030 and become CO2 neutral by 2045. A first step to reach these targets is via the utilisation of an Electric Arc Fu

    Jun 19, 2024

  • AUSIMM
    Blasting Near Mine Surface Infrastructure

    By A J. Moore

    Blasting operations in open cut mines results in airblast, ground vibration and rock movement with the potential for wild flyrock. In some mines there is a trend towards blasting closer to established

    Nov 8, 2011