Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Stability of Hydraulic Backfill Barricades (eefd356e-6d40-4b19-af58-7f0537046a1f)

    Hydraulic backfill is generally retained in slopes using permeable barricades. Mitchell et a! (1975), Mitchell (1992) and Grice (1989) have shown that under normal drainage conditions, barricades e

    Jan 1, 1998

  • AUSIMM
    Application of Inductive Methods in Determining Probable Location of Orebodies Where Surface Indications Have Become Obscured

    The geologist is often called upon to give judgment on the possibilities of reviving a former mining field presumably worked out as far as the evidence then available indicated. From time to time, sca

    Jan 1, 1950

  • AUSIMM
    The Automation of Western Mining Corporation's Olympic Dam Underground Rail Haulage System

    By D Mee

    The Western Mining site at Olympic Dam, near the community of Roxby Downs in South Australia is one of the largest orebodies of its type in the world. It contains known reserves of over 10.6 M tonne o

    Jan 1, 2000

  • AUSIMM
    Developing a TSF design concept – experience helps but numbers don’t lie

    By L D. Munro, S A. Jackson

    This paper provides a logical approach to developing a TSF design concept through: • Identifying key properties of tailings and containment structures; • Reviewing underlying principles for effective

    Jul 1, 2021

  • AUSIMM
    The Effect of Aground-Underground Seamlessly Integrated Modelling in Mine Disaster Prevention

    By Y S. Zhang

    Natural phenomena and human engineering construction activities had great influence on the geosciences space. Natural disasters, particularly mine disaster and other geological disasters happened freq

    Nov 22, 2011

  • AUSIMM
    Blast Monitoring and Blast Translation – Case Study of a Grade Improvement Project at the Fimiston Pit, Kalgoorlie, Western Australia

    By M Fitzgerald

    Fimiston Open Pit is operated by Kalgoorlie Consolidated Gold Mines (KCGM) as a joint venture between Barrick Gold and Newmont Mining. Over 110 years of underground mining resulted in the development

    Aug 22, 2011

  • AUSIMM
    Ensuring Rehabilitation into the Future – The Western Australian Mining Rehabilitation Fund

    By M L. Leybourne

    In 2012, in response to an increasing potential unfunded liability, the Western Australian Government passed the Mining Rehabilitation Fund Act 2012. The intent of this Act was to introduce an annual

    Jul 16, 2014

  • AUSIMM
    Addressing the Dilemmas of Long-Term Mining Impacts Using a Framework of Sustainability and Adaptive Management

    Many operating hard-rock sulfide mines are predicted to require perpetual post-closure management to prevent environmental degradation. Causes include evaporative concentration of metals and other sol

    Jan 1, 2003

  • AUSIMM
    Learning from Simulation at Boddington Gold Mine

    Various methods and software have been trialled for simulation of Au grades at Boddington Mine. This covers in-house and public software as well as sequential and turning bands methods. The diversity

    Sep 26, 2011

  • AUSIMM
    Rewriting the rule book – geology organisational design

    By T McLeod, B Catto

    AngloGold Ashanti Australia’s (AGAA) Tropicana gold mine (TGM) geology department seized the rare opportunity of building a new geology department for a new operation: the philosophy, the people and t

    Sep 20, 2017

  • AUSIMM
    Yesterday's Tailings are Tomorrow's Resource - Rehabilitation of Stilfontein Gold Mine for Profit

    Stilfontein Gold Mine, located approximately 160 km west of Johannesburg, produced both gold and uranium from 1952 through to the early 1990s. On decommissioning the mine infrastructure, treatment pla

    Jun 1, 2010

  • AUSIMM
    Understanding Size Effects of Semi-autogenous Grinding (SAG) Mill Operation as a Pathway to Solving Feed Disturbances – Case Study Using the MMG Century SAG Mill

    By R A. Pax, B Cornish

    "Although it is well known and easily experienced that the feed size distribution influences the throughput and stability of operation of a semi-autogenous grinding (SAG) mill, the details are poorly

    Oct 10, 2016

  • AUSIMM
    Comparison of dry VRM or HPGR circuits to wet milling circuits

    By G R. Ballantyne, G Lane

    Dry milling circuits that include high pressure grinding rolls (HPGR) or vertical roller mills (VRM) and air classification have replaced dry ball milling in cement production, but how do they compare

    Aug 24, 2022

  • AUSIMM
    Mining Company Reporting Standards ù The South African Experience

    South Africa has joined the league of other major Western World countries by officially adopting its own code for public reporting of Mineral Resources and Mineral Reserves. The recently published Sou

    Jan 1, 2002

  • AUSIMM
    Pillar Extraction at the Doe Run Company, 1991-1998

    By W L. Lane, T R. Yanske

    The Doe Run Company and its predecessors have been mining for over 130 years utilising the room and pillar mining method. This method has left approximately 20 per cent of the orebody in the remaining

    Jan 1, 1998

  • AUSIMM
    Winding Machinery on the Bendigo Goldfields

    In the Bendigo district, with its large number of comparitively small leases worked by separate companies, we might naturally expect to find many different arrangements of winding machinery and, as a

    Jan 1, 1902

  • AUSIMM
    Integrated process modelling for the Kalgoorlie Nickel Smelter

    By G Sartor, A Rich, D Grimsey, R Forzatti, M White

    An in-depth process model was developed for the pyrometallurgical, off-gas systems and water balance of the Kalgoorlie Nickel Smelter. This model was used to assess plant capacity with changing concen

    Aug 21, 2024

  • AUSIMM
    The CSA ventilation upgrade – geotechnical challenges and learnings

    By T M. Brettell, D Sidea

    The CSA Mine is located in Cobar, New South Wales and is operated by Glencore. Large scale underground production started from 1965, with zinc, lead, silver and copper extracted in the past. The curre

    Oct 16, 2017

  • AUSIMM
    Regulatory Perspective ù Development of Closure Plan With Adequate Financial Assurance for the Protection of Ground Water Quality at the Chino Copper Mine

    By K Myers

    Since the mid-1990s, the Chino Mine Facility (Chino) located near Silver City, New Mexico has been developing a closure plan with financial assurance to protect water quality, as required by State reg

    Jan 1, 2003

  • AUSIMM
    Thickening at Karara – The Role of Test Work and Innovative Design

    By G Hart

    As the iron ore/magnetite boom gains momentum, it is particularly important to question established past trends and explore the potential of alternative design options. Traditionally, ‘rule of thumb’

    Jul 11, 2011