Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mount Isa Cut and Fill (MICAF) Stoping

    ABSTRACTMechanised cut and fill stoping in the Racecourse orebodies between II and 9 levels was started in 1964.Five stopes are in progress over the two level interval, extracting the full strike leng

    Jan 1, 1968

  • AUSIMM
    Practical Applications of Geology in the Grade Control Process at the Marvel Loch Gold Mine, Southern Cross, Western Australia

    By S C. Dominy

    The grade of ore at Marvel Loch mine is directly related to the presence or absence of shear zones and quartz-sulfide-rich hornblende (¦ diopside) veining within areas of plagioclase alteration. An ex

    Jan 1, 2003

  • AUSIMM
    Shotover Alluvial Gold: An Evaluation of the Genesis and Chronology of the Host Sediments

    Several glacial episodes have been distinguished in the Shotover Valley. These produced fluvioglacial aggradational deposits downvalley from the terminii, commonly with well-preserved terrace treads,

    Jan 1, 1998

  • AUSIMM
    Strategic Diversity in Smelting

    To secure a sustainable competitive advantage some smelters may need strategies based on flexibility in feed and product ranges depending on immediate future projections of profitability. This paper

    Jan 1, 1996

  • AUSIMM
    The Role of Stress Waves and Fracture Mechanics in Fragmentation

    This paper will review some of the work conducted in the past at the Dynamic Effects Laboratory to examine the use of stress waves and fracture mechanics in understanding dynamic fracture and fragment

    Aug 24, 2015

  • AUSIMM
    Transition from Manual Truck Dispatching to Computerized Dispatching at Ok Tedi Mine

    By Eri G

    Ok ledi Mining Limited underwent a major transition from radio based truck dispatching to computerized dispatching for its equip- ment fleet in October, 1996. Modular Mining's Computerized Disp

    Jan 1, 1997

  • AUSIMM
    Flotation Reagents ù A Critical Overview From an Industry Perspective

    By S A. Ravishankar

    An overview of flotation reagents used in sulfide and non-sulfide separations, from an industrial perspective, is given in this presentation to highlight the current applications knowledge. The histor

    Jan 1, 2005

  • AUSIMM
    Some New Ideas on the Age and Origin of the Etheridge Goldfield, Queensland, and their Exploration Implications

    Close spatial relationships between the deposits of the Etheridge Goldfield (23 000 kg of bullion) and various regional geological and geophysical features suggest that genesis of the ore deposits was

    Jan 1, 1980

  • AUSIMM
    A millipot set-up for sintering investigation of iron ores

    By R Zhou, B J. Monaghan, S J Chew, R J. Longbottom, D J. Pinson, H Li, P Zulli, G Zhang, L Lu

    Steelmakers are increasingly motivated to use iron ore resources with a wider range of grades and mineral types that were previously considered unsuitable or uneconomical for sintering. In this respec

    Jul 24, 2017

  • AUSIMM
    Re-development of the Big Bell Mine, Cue

    The area around Big Bell was actively explored and sporadically mined for gold from 1904 onwards. The lease was named Big Bell in 1913. The property became established as a major mining centre with

    Jan 1, 1989

  • AUSIMM
    Evolution of Semi-Autogenous Grinding Mill Control at Century Zinc

    By A Prinsloo, R Tewu

    Automatic control of semi-autogenous grinding (SAG) mills has often been considered complex. Recent experiences at Century Zinc (worldÆs second largest open pit zinc mine) refute this. Together with o

    Jan 1, 2009

  • AUSIMM
    What is Required for a Low-Cost Project Outcome?

    By M Dickie

    During the 1980s and early 1990s low cost gold treatment plants were at the forefront of the Australian engineering and mineral processing business. This opportunity was the result of a high gold pric

    Jan 1, 2009

  • AUSIMM
    Leaching of Zinc from Calcined Angouran Plant Flotation Tailings Using Sulphuric Acid

    By S Moradi

    The aim of this study was to investigate the possibility of leaching zinc from the tailing (-2 mm) of Angouran flotation plant using sulphuric acid. The tails were first calcined at 800¦C for one hour

    Jan 1, 2002

  • AUSIMM
    Improvements in Stoping Practice at the Great Boulder Proprietary Gold Mines Limited

    By Holly J

    The period following World War II has seen many changes in stoping techniques at The Great Boulder Gold Mine. The new methods resulted in improved unit production figures, and have given some relief f

    Jan 1, 1956

  • AUSIMM
    Mining Methods in Use at North Broken Hill Ltd., Broken Hill, N.S.W.

    This paper gives a description of the methods of mining employed at North Broken Hill Limited, Broken Hill, N.S.W.GEOLOGICAL NOTESThe main Broken Hill lode occurs as a replacement of tightly folded pr

    Jan 1, 1940

  • AUSIMM
    Cuprous Hydrometallurgy. Part V. Leaching of Copper-Lead Matte with Copper(II) Sulphate in Aqueous Acetonitrile

    By Parker A. J, Giles D. E

    Solutions of copper(II) sulphate in acidified aqueous acetonitrile leach copper from copper-lead matte derived from the drossing of lead with sulphur to produce solutions of copper(I) sulphate. The re

    Jan 1, 1979

  • AUSIMM
    Structural Controls on the Development of a Mineralised Fault ù Fracture Network, NW Otago, New Zealand

    Vein swarms in metamorphic terranes such as the Otago Schist Belt, New Zealand provide evidence of past hydrothermal flow systems leading to fault initiation and reactivation. A major episode of hydro

    Jan 1, 2002

  • AUSIMM
    Mining Methods at Mount Lyell

    THE millng methods employed in the Mount Lyell Mining and Railway Company's mines are, perhaps, less known to the milling world than those of other important districts, due to the geographical re

    Jan 1, 1915

  • AUSIMM
    The Occurrence of Gold in the Broken Hill Lode

    The smelting of the Broken Hill lead concentrates at the Broken Hill Asso,ciated Smelters produced, among other products, approximately 4,900 ounces of gold and 8,800,000 ounces of silver during the y

    Jan 1, 1940

  • AUSIMM
    Building and Calibration of a Geotechnical Model for Sublevel Open Stope Design at Olympic Dam

    By I Thin, L Morizzi, C Seymour, G Mungur

    Olympic Dam has been investigating mine design options for the South Mine Area (SMA), which will continue using the existing sublevel open stoping (SLOS) method. The SMA is an undeveloped mining area,

    May 9, 2016