Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Ventilation and Refrigeration Design for the Access and Ore Production Decline to the Deep Copper Orebody at the Mount Isa MineBy Nixon C. A
The exploration of Mount Isa Mines' new copper source will require the development of a five kilometre 4.7 x 5.5 metre blind decline commencing 1000m below the surface and extending to 1600m
Jan 1, 1988
-
Various Interpretations of Coal Petrographic Nomenclature and their Effects on Maceral AnalysesThe commonly used Stopes-Heerlen coal petrographic classification and nomenclature has over the years been subject to variable interpretations. This paper discusses the problem with specific reference
Jan 1, 1970
-
Conclusion or 'Chairman's Reflections'It is always difficult to sum up an open forum adequately and instantaneously, so, with the privilege of hindsight, and also with some time to reflect, I am exercising the Chairman's prerogat
Jan 1, 1986
-
Gold-Silver Vein Mineralisation at Cononish, ScotlandBy I M. Platten, C J. S Sangster, Y Xie, S C. Dominy
Cononish is a steep, narrow NE-SW trending vein system that was emplaced into late Proterozoic metasediments. It shows brittle style deformation and postdates metamorphism and associated Caledonian fo
Sep 26, 2013
-
Erosion Driven Isostatic Flexure: A Structural Model for Gold Mineralisation in the Otago Schist, New ZealandBy R H. Sibson
The gold
Jan 1, 1995
-
The Contribution of Ore-Dressing Mineralogy to Improving Operational Performance at the Juno Bismuth-Gold-Selenium Ore Treatment Plant, Tennant CreekDetailed mineralogical investigation of a tailing sample from the Juno plant circuit at Tennant Creek was carried out to determine the nature of the unrecovered bismuth and whether any possibility exi
Jan 1, 1974
-
Refining Processes at The Broken Hill Associated Smelters Proprietary Limited, Port Pirie, South AustraliaThe following paper describes the refining practice for the production of lead, silver and gold at the works of The Broken Hill Associated Smelters Pty. Ltd., Port Pirie, South Australia.The refinery
Jan 1, 1937
-
Sampling and Measurements in the Reaction Shaft at Olympic DamBy B Washington, A Campbell, R Taylor
A sampling and measurement program was undertaken on the reaction shaft of the Olympic Dam copper flash smelting furnace. The object of the work was to provide information to validate a mathematical m
Jan 1, 2005
-
New Life for the Argyle Diamond Mine – Block Cave Style and BeyondBy D C. Ford
The Argyle AK1 orebody was discovered in 1979 and subsequently found to be a large, economically viable reserve with high grade diamondiferous ore. Production began via an open pit operation
Aug 22, 2011
-
The Economic Climate for Mining in New Zealand (01b7c1a3-c189-4335-9116-ee02100e1776)This paper presents a resume of the likely profitable mining areas in New Zealand. It covers the main "minerals" - gold, coal, oil and gas, ironsands, silica sands, clays, lump silica, perlite, sulphu
Jan 1, 1990
-
The Future of Water in Mining - Treatment of Mine Water for Sustainable BenefitWe can look at the water treatment and management strategies at some recently commissioned mines and minerals processing sites to see the likely future of water in mining. The future of water in minin
Jan 1, 2008
-
The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount Isa (ee90997b-915a-4723-962c-df13e11cf8b6)By Kuganathan K, Potvin Y
Enterprise Mine at Mount Isa is to expand ore production from the current 1.4 to 3.5 mtpa by mining the 3500 Orebody, from which production is scheduled to start in February 1998 making this the dee
Jan 1, 1998
-
Managing the Closure and Reopening of the South Ramp at Telfer Gold Mine During Sublevel Cave Breakthrough into the Open PitThe Newcrest Mining Limited Telfer Gold Mine consists of an underground sublevel cave (SLC) operation located 734 m directly below active open pit operations. Open pit and underground current producti
Nov 25, 2010
-
The Central Eyre Iron Project – developing a new iron ore mine in a challenging climateBy L J. Ingle, K L. McPhee, A G. Hunt
Iron Road Limited (IRD) is currently developing the Central Eyre Iron Project (CEIP) at Warramboo on the Eyre Peninsula, South Australia. The project consists of a 30 year open pit mine, magnetite pro
Jul 24, 2017
-
Methods for Assigning Domains in the Primary Sulfide Zone of a Sulfide OrebodyBy P D. Munro
The spatial distribution of ore with similar processing properties or domains within an orebody may be identified early in the assessment of an orebody to provide a sound basis for later development o
Jan 1, 2008
-
Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement ProjectBy M Behrens
The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th
Mar 8, 2011
-
Criteria for Safe Mining under the Surface Water Accumulations in Velenje Lignite MineBy Ribicic M, Kocar F
Surface lakes or water accumulation present a possible threat for the flooding of the underground mining works. Therefore, the criteria that define the conditions under which no flooding of the mini
Jan 1, 1988
-
Extraction of Cement Raw Materials from Within and Under the Northland AllochthonA variety of cement raw materials occur within the Cenozoic sequence in Northland. These form the basis of Golden Bay Cement's cement manufacturing operation at Portland, Whangarei. High grade li
Jan 1, 1999
-
Maximising the Capacity of the Ore Handling Systems at Xstrata CopperÆs Mount Isa Copper OperationsBy G W. Croft, L E. Krause
The current copper ore handling systems in use at Xstrata CopperÆs Mount Isa Copper Operations are up to 33 years old and have hoisted over 160 Mt at a rate of around 6 Mtpa. The mineÆs production pro
Jan 1, 2005
-
Piling and Raise Bore Construction – Key Learnings from a Client’s PerspectiveBy R Austerberry, S Green
Highly weathered ground, limited collar options and the need to achieve a desired outcome at the lowest possible cost led to the need to adopt a construction approach that had no established design me
Mar 24, 2014