Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Stratigraphy and Tectonic Model for the Drummond Basin and its Relationship to Gold MineralisationThe Drummond Basin is a large intracratonic basin which developed in central Queensland during Late Devonian to Early Carboniferous times. It is postulated that the Drummond Basin developed as a f
Jan 1, 1989
-
Future Directions in Contract MiningOver the last 15 years the contract mining concept has developed into an integral part of the Australian mining industry. Today it is a $2 billion per annum industry with the potential to continue t
Jan 1, 1996
-
Redevelopment of the Morning Star Gold Mine - ABSTRACT ONLYMorning Star Gold aims to enter the ranks of Australia's gold producers, revitalising the Eastern Victorian Goldfi elds in the second half of 2010 - the fi rst gold production in around 50 years
Aug 1, 2010
-
Predicting Flotation Response from Liberation InformationPredicting Flotation Response from Liberation Information
Sep 13, 2010
-
Ore Treatment at Martha Current Operations and Future DirectionsThe treatment plant at Martha Mine was upgraded from a nominal throughput of 110tph (O.93mtpa) to 150tph (1.25mtpa) late 1999. Post-upgrade performance did not meet expectations when treating either t
Jan 1, 2001
-
The Computational Modelling of Conveyor Belt Fires in Mine GalleriesBy D Giddings, S A. Silvester, S Pickerin
Underground fires represent a constant threat to the safety of underground personnel. Miners in the immediate vicinity may face intense heat, blinding smoke, toxic fumes, fall of ground and other dire
Jan 1, 2005
-
Oxygenation System Upgrades and Leach Plant Performance Improvements at Morila Gold Mine - 2009 to 2012By D M. Verster, P L. Gillot, A Kone
Randgold ResourcesÆ MorilaÆs gold leach plant is subjected to uncommon æoxygen stressesÆ. Feed ores exhibit very high oxygen demands, primarily caused by iron sulfides. In addition, ore oxygen demand
Sep 26, 2013
-
Process Implications of Ferrolysis in Hyper-Saline WaterBy J Bean
Iluka Resources Ltd developed the Jacinth-Ambrosia Mine (Jacinth) in the Eucla Basin during 2009 and 2010. In this arid climate the operation relies on hyper-saline groundwater from a palaeochannel fo
Oct 5, 2011
-
Risk and Accepted Practice in Open Pit Mining GeomechanicsThe paper examines the current status of risk and accepted practice in mining geomechanics. It explores some deficiencies in human capital, risk analysis and our future technical needs, and suggests w
Jan 1, 2003
-
Draw Control at Premier MineBy K Nesbitt
Draw control at Premier Mine is considered important to avoid conditions of isolated draw, which results in early waste ingress, compaction of the kimberlite ore and loss of ore reserves. The Premier
Jan 1, 2000
-
Geological Modelling - The Way Ahead (Concept Modelling for Exploration and Mine Planning)The aim of all modelling is to replicate geological reality as closely as possible using available data. This paper is aimed at one end of the spectrum, where very limited data is combined with intu
Jan 1, 1995
-
Instrumented column testing of salt uptake from compacted red mud into a coverBy Y Zhu, D J. Williams, M O’Neill, C Zhang, X Lei
A cover of inert material overlain by topsoil is required over compacted, seawater-neutralised red mud, a waste product from the refining of bauxite to produce alumina. The cover is to be revegetated,
Jul 23, 2018
-
Regional Stability of Underground Mines ù A Core RiskThe history of soft and hard rock underground mining is blemished with regional instabilities of mine workings. Whilst the potential consequences of regional instability events are recognised to be hi
Jan 1, 2003
-
Production Capacity Optimisation in the Presence of Grade UncertaintyGrade uncertainty can have a number of important implications for a mining operation. One of the most significant risks in not considering grade uncertainty in planning is the over or under allocation
Dec 6, 2010
-
The Development And Application Of techniques For The Assessment And Control Of Longhole Open Stope Stability At ZC/NBHCThe causes and impact of stability problems associated with longhole open stoping (LHOS) at The Zinc Corporation, Limited (ZC) and New Broken Hill Consolidated Limited (NBHC) are discussed and LHOS
Jan 1, 1983
-
Predicting the Efficiency of Chemical Processes for Low-Grade Concentrates and OresBy Prosser AP
The large body of knowledge about the relation between chemical process efficiency and mineralogical features is of only limited use. The profession ought to try to improve the methods of using inf
Jan 1, 1975
-
A Local Authority's View of Mining and the Resource Management ActMining is still a significant economic activity within the Hauraki District. The Martha project is particularly significant. Estimates are that in the order of 850 direct and indirect jobs are derived
Jan 1, 2000
-
Estimating Reserves Of Stone And Sand For Use By The Construction IndustryIt is no longer possible to establish a quarry on the most convenient hill then abandon the site, leaving a scar if the stone or sand in the deposit is found to be unsatisfactory. Before approval i
Jan 1, 1979
-
The Development of Very Large Screens for the Preparation of Coal and Mineral Raw MaterialsThe paper describes the reasons for the development and for the selection of systems which were finally adopted; further estima- tion and design engineering problems, as well as experience with lar
Jan 1, 1984
-
The Determination of Platinum in Ores and Mineral ConcentratesAn assessment of methods currently available for the accurate determination of low concentrations of platinum in ores and mineral concentrates indicated that prior treatment of the sample by fire assa
Jan 1, 1970