Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    An Optimisation Approach to Maintenance Scheduling for Capacity Alignment in the Hunter Valley Coal Chain

    By H Waterer, L Zheng, T Kalinowski

    The Hunter Valley Coal Chain (HVCC) consists of mining companies, rail operators, rail track owners and terminal operators, together forming the worldÆs largest coal exporting facility. In 2008, the t

    Sep 26, 2011

  • AUSIMM
    Some Aspects of the Genesis of the Iron Duke Iron Orebody and Associated Rocks

    There is an alternative theory of the high grade orebodies of the Middleback Group, based on the primary nature of the high grade ores in an area of carbonate deposition, with lesser amounts of silice

    Jan 1, 1963

  • AUSIMM
    The Waihi Epithermal Gold-Silver-Quartz Vein System, New Zealand: A High-Throughput Geothermal System of Late Miocene Age

    By P Blattner

    The Late Miocene gold-silver bearing epithermal system at Waihi has some close similarities in its paleo-thermal and geochemical structure with modern, volcanic-hosted geothermal systems such as Ohaak

    Jan 1, 1995

  • AUSIMM
    Mining Methods at Iron Knob, South Australia

    In setting out to describe the methods and machinery employed at Iron Knob the writer does not attempt to give any information as to the situation, topography or geological features of the locality. T

    Jan 1, 1936

  • AUSIMM
    The Behaviour of Indium During Jarosite Precipitation

    By Mingmin Dou

    The behaviour and deportment of indium during the precipitation of sodium jarosite from Fe2(S04)3 - Na2SO4 solutions were investigated. Indium is readily precipitated with sodium jarosite, and the e

    Jan 1, 1993

  • AUSIMM
    Pilot Scale Carbonization of Wallarah Coal Using the Parry Process (6d646f40-1507-4d07-950f-53652f2f845c)

    A pilot plant was constructed for the low temperature carbonization of Wallarah (N.S.W.) coal at the rate of 300 lb/hr. The design was based on an entrained state carbonizer developed by Parry and D.S

    Jan 1, 1963

  • AUSIMM
    Managing the Cumulative Groundwater Impacts of Multiple Iron Ore Projects at Cape Preston (or à One Plus One Plus One Plus One Does Not Equal Four)

    By J Hall, A Gallardo, M Strizek

    Mineralogy and coproponents Sino Iron, International Minerals and Austeel are in the process of developing four world class magnetite iron ore mines with multiple open pits along a 25 km strike length

    Jan 1, 2009

  • AUSIMM
    The MTM copper process

    By R W. Shaw

    The MTM Process targets treating lower grade and/or problem concentrates that are not attractive to smelters. The process has been developed at laboratory scale for copper and is based on a related de

    Aug 24, 2022

  • AUSIMM
    System Optimisation of Design and Scheduling of Open Mining Operations

    The paper presents the development of an integrated computer aided design and planning of open cast mining, with the use of object-oriented modelling and geoinformation technologies, on the example of

    Dec 6, 2010

  • AUSIMM
    A review of floor heave mechanisms in underground coal mine roadways

    By H Ramandi, H Masoumi, I Canbulat, B Hebblewhite, J Oh, S Saydam, W Timms, S Mo

    This paper reviews the floor heave mechanisms in underground coal mine roadways. Previous studies have reported three main failure mechanisms: bearing capacity failure, buckling and swelling. The buck

    Nov 30, 2018

  • AUSIMM
    Cost Model of the Leigh Creek Coalfield

    The Leigh Creek Coalfield is owned and operated by the Electricity Trust of South Australia to supply fuel to the Northern Power Station. To supply electricity at lowest cost, a costing and decision

    Jan 1, 1990

  • AUSIMM
    Block Model Data Reduction and Sensitivity Analysis

    By J E. Everett

    Maximising ore tonnage at a selected target grade requires that appropriate ore identification criteria be established. Iron ore mining block models may consist of many millions of estimated blocks, e

    Jul 13, 2015

  • AUSIMM
    Heavy Medium Separation at Iscor's Sishen Iron-Ore-Mine

    The Sishen iron-ore-mine produces 3 pro= ducts with size gradings of 25 to 8 mm, 11 to 5 mm and 5 to 0,2 mm and has a product capacity of 20 Mtpa. Ore is produced at an average Fe content of 66,2

    Jan 1, 1987

  • AUSIMM
    Current Extraction Technology for Free Milling Auriferous Ores

    By D M. Menne

    This paper is intended to give a general review of current gold extraction technology for free-milling or non-refractory auriferous ores. Fundamental process concepts and some of the differences betwe

    Jan 1, 1986

  • AUSIMM
    Tertiary Training - Non-degree Courses

    In addressing the need for non-degree tertiary training, let us examine some recent reviews of engineering and geoscience education. The Finniston Report (1) criticised the formation of engineers in

    Jan 1, 1989

  • AUSIMM
    Distinguishing Carbon Fractions in Coalmine Rehabilitated Soils

    By J Chan, T Baumgartl, A Plante, C Peltre, P D. Erskine

    Mine soils are often organic matter and carbon poor due to disturbance, topsoil stockpiling and mixing with spoil. They present an opportunity to observe the accumulation of soil carbon arising from r

    Jul 16, 2014

  • AUSIMM
    High Quality Pig Iron from AusIron Processing

    By Fogarty J. G H

    Ausmelt Technology has a unique capability of removing the impurities, phosphorus and sulphur, from the feed materials to the process. Sulphur is removed to the gas phase almost completely because of

    Jan 1, 1999

  • AUSIMM
    Geometallurgical Modelling – A Mineral Processor's Perspective

    By A Stradling

    For a geometallurgical program to be successful, linkage must be made between the geologists and geostaticians who understand and model the orebody, the metallurgists who determine the value that can

    Sep 5, 2011

  • AUSIMM
    Local Scale Estimation of Sublevel Cave Stocks - Is it Possible? A Case Study in Reconciliation of Metal Production, Ridgeway Mine, New South Wales

    By T O&apos, Sullivan

    Reconciliation of metal production from a sublevel cave (SLC) mining operation is a complicated process. SLC reconciliation is unlike reconciliation for open stope operations, where a tonnage of extra

    Jan 1, 2006

  • AUSIMM
    Empirical Evaluation of Factors Affecting Froth Stability in Copper Flotation

    By M Zanin, E Chan, D Xu

    An experimental design has been developed to investigate the relative influence of distinct pulp and environmental properties on froth stability in the flotation of a typical porphyry copper ore. In p

    Sep 1, 2014