Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Contract Mining: Optimising Mining Performance and Efficiencies

    New Zealand contract mining has been well established for close to 50 years. The opencast industry has grown from mining quantities of less than 1 million bcm per year in the 1950s to around 20 millio

    Jan 1, 1997

  • AUSIMM
    Predicting the Effects of Ground Movements Associated with Soft Ground Tunnel Construction in Urban Areas ù A Procedure for Engineering Evaluation

    By J P. Hsi

    Recent increase in the development of underground space in urban areas in Australia has included soft ground tunnel construction. The ground movements associated with soft ground tunnel construction m

    Jan 1, 1999

  • AUSIMM
    Selective Continuous Mining Requirements and Opportunities for Miners and Manufacturers

    Selective continuous surface mining is a rapidly developing system of mining which will have a significant impact on many present and future open cut mines. In many aspects the technology is in its

    Jan 1, 1986

  • AUSIMM
    Surface and Underground Magnetic Investigations in the Southern Coalfields of New South Wales

    Magnetic anomalies in the Southern Coalfields have been subdivided into two characteristic types. Each type is attributed to a separate cause, one being basement structure, and the other near-surface

    Jan 1, 1967

  • AUSIMM
    Measurement of Phase Transformation Rates During the Reduction of Iron Oxides Using High-Temperature X-Ray Diffraction

    By Madsen I. C, Langberg D. E

    Recent advances in X-ray diffraction (XRD) technology have made it possible to conduct powder XRD measurements on samples at high temperatures during reaction. State-of-the-art detectors are now cap

    Jan 1, 1999

  • AUSIMM
    Wire Netting Paddocking in Stopes-Broken Hill South Limited

    In the extraction of level bridge pillars in the South Mine by square-setting methods the general practice is to work transversely from the hanging wall in narrow sections three or four sets wide to t

    Jan 1, 1942

  • AUSIMM
    Structural Controls on Mineralisation at the Broken Hills Epithermal Au-Ag Deposit, Coromandel Peninsula, New Zealand

    By J Mauk, J Rowland, S Rabone

    Most epithermal Au-Ag deposits in the Hauraki Goldfield are hosted in late Miocene andesites. Broken Hills is an exception, being one of the few economic deposits hosted in rhyolite. Investigation of

    Jan 1, 2003

  • AUSIMM
    The Design of Draft Tube Circulators

    Draft tube circulators are now widely used instead of Pachucas for suspension of slurries in large tall tanks.Precipitators in the alumina industry are an example.Draft tube/tank diameter ratio is cri

    Jan 1, 1982

  • AUSIMM
    Alluvial Gold in the Clyde Power Project Area: Some Observations on the Origin, Distribution and Age of the Deposits

    The Clyde Power Project, and its Clutha Valley Development forerunner, has taken widespread investigations for various hydroelectric purposes both along the valley floors upstream from Alexandra and o

    Jan 1, 1992

  • AUSIMM
    A Petrographic Basis for Classifying Australian Coals

    The proposed classification scheme is based on two primary parameters, one for petrographic composition and the other for rank, both being determined with microscopic techniques. The scheme has been a

    Jan 1, 1970

  • AUSIMM
    Professional Training for the 21st Century

    This opportunity to present a few thoughts on the question of professional education and training comes at a most appropriate time. In Britain, a great deal of energy is being expended in this, so

    Jan 1, 1986

  • AUSIMM
    The Mineralogical Researches of Gold Ores and Technological Products at Operating Factory in Olympiada Mine (Russia)

    The Mineralogical Researches of Gold Ores and Technological Products at Operating Factory in Olympiada Mine (Russia)

    Sep 13, 2010

  • AUSIMM
    How Particles Stick to Bubbles - The Influence of pH and Hydrophobicity in Flotation

    How Particles Stick to Bubbles - The Influence of pH and Hydrophobicity in Flotation

    Sep 13, 2010

  • AUSIMM
    Permitted Explosives for the 21st Century

    By D Chalmers

    Drill and blast mining techniques are used to mine coal outburst prone and high gas content coals in Australia. As the risk of an outburst is increased in high gas content coal, it is considered that

    Jan 1, 2007

  • AUSIMM
    A Proton Microprobe for the Geosciences

    By Ryan CG, Cousens DR, Griffin WL

    The proton microprobe is developing into a vital tool in the geosciences, through its high sensitivity for in-situ detection of trace elements in the ppm regime. This paper will describe the instru

    Jan 1, 1989

  • AUSIMM
    Assessment of Occupational Exposure to Whole-Body Vibration for Drivers of Mining Equipment

    According to the data provided by the most recent European Survey on Working Conditions, roughly 25 per cent of the European working population is exposed to mechanical vibrations for no less than one

    Dec 6, 2010

  • AUSIMM
    Pisces-a Symbol for the Future

    By King MN, Travis IC

    PISCES - the Planning and Information System for Coal Export Services has been developed by Port Waratah Coal Services (PWCS) to ensure the efficient and economic operation of the Hunter Valley Co

    Jan 1, 1987

  • AUSIMM
    Coking for the Australian Steel Industry

    The majority of coke in Australia is made in by-product slot ovens at steelworks in Port Kembla, Newcastle and Whyalla. Most of the coals for these plants come from New South Wales but a regular prop

    Jan 1, 1975

  • AUSIMM
    Statistical Analysis of Dragline Monitoring Data

    By Baafi E. Y

    Dragline monitoring systems are normally the best tool used to collect data on the machine performance and operational parameters of a dragline operation. This paper discusses results of a time stud

    Jan 1, 1998

  • AUSIMM
    Infrastructure Development for the Ulan Project

    Extensive infrastructure construction works were required for the development of the underground and open-cut coal mine at Ulan to a production capacity of 5 million tonnes of steaming coal per an

    Jan 1, 1983