Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Sustainable Water Use in Minerals and Metal Production

    By R R. Lovel

    In this paper, life cycle assessment methodology has been used to assess the variations in water use associated with different metal production and processing routes and provide insights into the valu

    Jan 1, 2006

  • AUSIMM
    Key Operating Parameter Comparison Ciurug Mine Design at Pongkor Gold Mine -- Java-Indonesia

    Pongkor Gold Mines is one of seven units of production owned by PT Aneka Tambang (State owned mining company). The mine is located in the western part of Java Island, Indonesia. It is in the Bogor Dis

    Jan 1, 1997

  • AUSIMM
    Exhumation of Early Cretaceous Granulites in Fiordland, New Zealand Through Combined Mid-Cretaceous Crustal Extension and Late Cenozoic Transpressive Motion on the Alpine Fault

    High pressure (-1.2 GPa) Early Cretaceous granulite facies orthogneisses in Fiordland, New Zealand are in tectonic contact with a cover sequence comprising mid-Palaeozoic amphibolite facies metasedime

    Jan 1, 1990

  • AUSIMM
    Fast Adsorption Phenomena at Air/Liquid Interfaces

    Fast Adsorption Phenomena at Air/Liquid Interfaces

    Sep 13, 2010

  • AUSIMM
    Walhalla and the Long Tunnel Extended Gold Mine: An Historical Review

    By Roddick F

    From its mining lease at the northern end of Cohens Reef at Walhalla in the North Gipps- land mountains, the Long Tunnel Extended Gold Mining Company produced 13,695kg of gold, which at 1982 prices

    Jan 1, 1982

  • AUSIMM
    Childe Harold: A Case Study in the Use of Multiple Bench Grade Control Techniques

    By Stuart M. S, Allen P. B

    The Childe Harold deposit was mined by the Granny Smith Joint Venture (GSJV) from late-March through to early-December 1993. This was a fast-tracked mining project whose history began with an offer

    Jan 1, 1994

  • AUSIMM
    Utilising Statistics and Geostatistics to Validate, Characterise and Improve Geological Domaining ù A Case Study From BHP BillitonÆs Yandi Channel Iron Deposit

    BHP BillitonÆs Yandi channel iron deposit has a large resource of approximately 1.3 billion tonnes. This is a bulk mining operation with a high degree of selectivity not being practical. In contrast t

    Jan 1, 2005

  • AUSIMM
    A Three Dimensional Kinematic Model of Muckpile Formation in Bench Blasting

    By Kavetsy A

    In surface mining operations, the ease with which a muckpile may be dug is a dominant factor in mining efficiency. Within broad limits this is largely independent of the fragment size dis- tribution

    Jan 1, 1988

  • AUSIMM
    Remote Control Loaders for Longhole Open Stopes

    The paper is introduced by some general comments on the Electrolytic Zinc Company West Coast Mines operations. An outline of the geology of the Rosebery Mine orebodies preced- es a resume of the min

    Jan 1, 1977

  • AUSIMM
    Correcting for the Dilution of Rakes Processed Sequentially from Multiple Mines at the BHP Billiton Iron Ore Newman Joint Venture Operations

    By T J. Howard

    At BHP Billiton Iron Ore operations, run of mine ore from the several Newman Joint Venture (NJV) mines is railed in 12 kt rakes to Port Hedland. Rakes are processed sequentially, with the lump and fin

    Jan 1, 2007

  • AUSIMM
    Common Sense and Good Communication in Mineral Resource and Ore Reserve Estimation

    By J Vann

    Mineral Resource and Ore Reserve estimation is a challenging and demanding field, requiring application of professional knowledge, skill and experience of the highest order. If the many potential pitf

    Jan 1, 1999

  • AUSIMM
    Skarn Deposits in the Circum-Pacific Belts

    The Circum-Pacific area is one of the most important gigantic skarn-metallogenic belts in the world. In more than 20 coastwise countries of this region, there exist thousands skarn deposits of differe

    Jan 1, 1990

  • AUSIMM
    The Environmental Component in Mining Project Development

    Programmes of environmental investigations to identify and minimise impacts and satisfy government and community requirements have become an integral and rate determining component in the planning

    Jan 1, 1983

  • AUSIMM
    Investigation and Modelling of Gas Injection and Mixing in Molten Liquid Processes

    By Nilmani M, Fountain CR

    Injection of gases into slag-melt mixtures produces various zones as a result of bubble formation and disintegration within the melt. The extent of these zones depends on the type of reactor used.

    Jan 1, 1984

  • AUSIMM
    A Proposed Copper Metallurgical Process

    The writer had the pleasure of several months' laboratory tests on a metallurgical process for copper ores devised by Mr. W. H. Corbould, Consulting Engineer, North Queensland. Mr. Corbould'

    Jan 1, 1921

  • AUSIMM
    Important Acid Ferrous Burden Properties in the Cohesive Zone of a Blast Furnace

    By C E. Loo

    The cohesive zone has a significant influence on blast furnace operation and performance. The high-temperature behaviour of the reducing ferrous burden determines the properties of the cohesive zone a

    Jul 13, 2015

  • AUSIMM
    Improvements in Stoping Methods at Mount Isa Mines Limited

    By Mathews K. E, Willstead T. V C

    Initial glory holing was followed by sublevel stoping, with a small proportion of total production mined by shrink and cut-and-fill methods.The sublevel stoping method was successfully modified to cat

    Jan 1, 1961

  • AUSIMM
    Sulfur distribution ratio in iron and steelmaking slags

    By R G. Reddy, A Yahya

    The sulfur distribution ratio (Ls) is an expression of the amount of sulfur in slag to the amount of sulfur in molten metal. The sulfide capacities calculated from Reddy-Blander (RB) model were used t

    Aug 21, 2024

  • AUSIMM
    Role of the Distributor in Achieving Optimum Aerodynamics in a Blast Furnace

    The overall systems approach to blast furnace aerodynamics is explored including the time and spatial inter-relationships that exist between the furnace lines, tuyeres, burden characteristics, distri

    Jan 1, 1975

  • AUSIMM
    An Integrated Agency Approach to Mine Site Environmental Management and Control in New South Wales, Australia

    The Department of Mineral Resources is the lead agency in mine site environment management and control in New South Wales. The Department introduced a Mining, Rehabilitation and Environmental Managem

    Jan 1, 1995