Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
What Information and Production Benefit Can I Gain by Using Digital High-Speed Camera and Data Capture Technology?This paper will address this question from the point of view of a drill and blast engineer or researcher working in open cut and underground mining operations. The paper will establish a common set of
Jan 1, 2007
-
Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning SchedulerBy D R. Seaman, R P. Tooher, B A. Seaman
"Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove
Oct 10, 2016
-
Mine closure bonds (financial assurances) – the ‘how much?’ conundrumBy G Byrne, A Bowden
There is often a difference in opinion about the allocation of risk in the establishment of mine closure bonds or financial assurances. From the State’s perspective, protection is needed to ensure tha
Jul 25, 2018
-
Geotechnical Challenges in Narrow Vein MiningBy J Hadjigeorgiou
Narrow vein mining, as most types of mining, faces important geotechnical challenges. The specificity of geotechnical challenges in narrow vein mines stems from the nature of the deposits, which are o
Mar 26, 2012
-
Rwanda and the Africa Mining VisionBy I H. Wilson
After decades of turmoil, Rwanda launched its Vision 2020 in 2000 aimed at reconstructing government and addressing poverty. Implementation focused on the agricultural sector, infrastructure and educa
Jul 16, 2014
-
Blast Design Parameters and Their Impact on Rock FragmentationBy B Prasad, M P. Roy, P K. Singh, C Drebenstedt
Blasting operations play a pivotal role in the overall economics of opencast mines. The blasting subsystem affects all the other associated subsystems, ie loading, transport, crushing and milling oper
Aug 24, 2015
-
Dilution optimisation in sublevel open stoping operationsBy A Vakili
Dilution is associated with considerable direct and indirect costs in underground open stoping operations. As shown in previous works, an improved ability to predict dilution enables the economic risk
Mar 29, 2023
-
Assessment of approaches, data requirements and methodologies for estimating long-term pit lake water levelsBy H J. J Boshoff
Pit lakes, as a final void after completing open cut mining, are in most cases unavoidable. Initial mine designs and approvals require consideration and assessment of closure objectives, legislation a
Jul 25, 2018
-
The Casposo Gold-Silver Project – Process Selection and DesignBy D Connelly
Silver and gold bearing ore from the Troy Resources NL Casposo Gold-Silver Project, located within the San Juan Province of Argentina contains a complex mix of gold, silver, electrum and silver sulphi
Aug 8, 2011
-
Comparison of Field Estimated StrengthsBy A Duran
When dealing with rocks in the geotechnical profession, a common activity involves providing an estimate of the intact strength. The tactile approach and descriptions of strength that apply to soils i
Nov 5, 2014
-
Development and permitting of an underground mine at Cowal Gold OperationsBy J Northfield, L Neesham
The GRE46 Underground Project lies beneath the environmentally unique and culturally endowed shore of Lake Cowal. The ore body is open both along strike and at depth and is currently defined to a stri
Mar 15, 2021
-
MMG’s Australian Operating Model – the Implementation, Successes and LearningBy R M. S Watsford, M Davis
In 2015, MMG Limited commenced further action to improve operating margins and establish a blueprint for future growth in the Australian environment. This action was taken in the context of weakening
Jun 22, 2016
-
A Brief History of Pierre Gy's Sampling Theory and Current Trends in its Acceptance in the Mining WorldSixty years after its inception, after an alternation of periods of admiration and rejection by the industry, Sampling Theory can now be seen as going through its golden age. A brief history of its su
Jan 1, 2008
-
Comparing Energy Efficiency in Grinding MillsBy E Niva
The IsaMillÖ is challenging the way that plants are designed and operated. This paper challenges existing designs of concentrator flow sheets, particularly focusing on magnetite circuits. From
Jan 1, 2008
-
Highlighting duct constraints in duct-fan systems operating under negative pressureBy M Francoeur
Oct 12, 2022
-
Evaluation of the Ernest Henry Cu-Au Deposit Mineral ResourcesBy A J. Ryan
The Ernest Henry copper-gold Mineral Resource is the major asset heldby Ernest Henry Mining Pty Ltd, comprising A$6.4 billion of containedmetal. The case history presented below describing the evoluti
Jan 1, 1998
-
Fusion of molten phase R&D into the metallurgical industry to drive circularityBy S L. Nicol, B J. Hogg, O J. Mendoza, S Nikolic, A Burrows
The top submerged lance (TSL) technology, developed in the 1970s, is now widely used for the processing of a range of materials. The key advantage the ISASMELT™ TSL technology provided was the ability
Aug 21, 2024
-
Designing Interferometric Synthetic Aperture Radar Surveys for Mine Monitoring with Accuracy AssessmentBy R Ahola, M D. Henschel, M A. McParland
With the introduction in recent years of third-generation interferometric synthetic aperture radar (InSAR) techniques, monitoring of mine slopes, benches and surrounding areas has benefitted from incr
Nov 5, 2014
-
The Petroleum Industry's Future Self-Sufficiency and Taxes- A ReviewThe performance of the Australian Mining Industry over the past 10 years using key indicators of production, revenue, aftertax return investment, together with key cost elements, market changes and
Jan 1, 1987
-
Simulating Block Cave Secondary Breakage ù An Application of Information and Operations Management Tools in Mass Mining SystemsBy M Scoble, E Rubio
The re-engineering of manufacturing production systems has demonstrated the benefits from using production information for optimising processes. This paper explores the techniques and issues in the ac
Jan 1, 2000