Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Rational Sampling and Standard Deviations for Random Variables in Phase I Application of Statistical Process Control

    By W P. Breytenbach

    "The phased application of statistical process control (SPC) infers that processes are classifiable as pre-SPC (or phase zero), phase I and phase II processes, with different objectives being pursued

    Jul 29, 2014

  • AUSIMM
    Live Track Railroad Tunnel Repair and Clearance Improvement in the United States

    By J Schrank

    Double-stack trains in the United States date back to the early 1980s, starting about the time deregulation of the rail industry occurred. Freight rail became increasingly more competitive to trucking

    Sep 17, 2014

  • AUSIMM
    Block Caving - Controllable Risks and Fatal Flaws

    Block caving is the lowest cost underground mining method but it has relatively high risks and a high up-front capital and development cost. It has application to large, often lower-grade orebodies wh

    Jan 1, 2000

  • AUSIMM
    Application of Different Drive Systems for Horizontal Mills

    By M Neurohr, B Wacker, D Mensing, C Murphy, W Kitz

    Mining operations have large power requirements. The biggest consumers of energy are the drives for the mills located in the concentrators. Assuming that the decision is made on how many mills are nee

    Jul 13, 2015

  • AUSIMM
    Climate Alarm's Lessons for New Leaders - Overcoming Fear with Facts for Freedom

    People in economically developed societies demonstrate inherent human care for Earth and want to stop pollution. Yet efforts to clean Earth seem bogged in confusion from wildly contradictory and alarm

    Jan 1, 2009

  • AUSIMM
    Road Infrastructure Security Assessment and Measures Selection Methodology Using SecMan – Tunnel Example

    By J Karlovšek, M Hafner, M Žibert

    The transport network in Europe is probably one of the most important systems for the European economy and society. Trans-national transport routes play a vital role in the traffic of goods and the su

    Sep 17, 2014

  • AUSIMM
    "Optimisation of Mining Policy Under Different Economical Conditions Using a Combination of Non-Linear Programming and Genetic Algorithm"

    By A Esfahanipour, M Osanloo

    Determination of cut-off grade?strategy is one of the most important stages of open pit mine planning and design. It is the parameter directly influencing the financial, technical, economic, legal, en

    Sep 26, 2011

  • AUSIMM
    A Guide to Selecting the Optimal Method of Resource Estimation for Multivariate Iron Ore Deposits

    By H Arvidson, J Vann

    When only wide-spaced drilling is available, for example at concept, prefeasibility and feasibility stages, properly implemented linear estimation (including ordinary kriging) predicts grade tonnage r

    Jan 1, 2007

  • AUSIMM
    Consideration for Multiobjective Metaheuristic Optimisation of Large Iron Ore and Coal Supply Chains, from Resource to Market

    By J Balzary, A Mohais

    Dynamic market and operating conditions, coupled with an environment in which multiple objectives and trade-offs are common, pose major challenges for planners and schedulers working in any mining ent

    Nov 24, 2014

  • AUSIMM
    Safety Culture and Resilience Engineering - Exploring Theory and Application in Improving Gold Mining Safety

    Contemporary approaches to safety management appear to be failing short of meeting its mark in improving mine safety. This is evidenced by the high workers compensation, high incidence rates and fatal

    Aug 1, 2010

  • AUSIMM
    Integrated Communications for Surface and Open Pit Applications

    By G Booth

    Whilst communications systems in the mining industry have evolved over the years, the premise remains consistent that reliable communication is vital for safety and operational efficiency. TodayÆs ope

    Jan 1, 2008

  • AUSIMM
    Parallel Implementation of a Tabu Search Procedure for Stochastic Mine Scheduling

    By R Dimitrakopoulos, R Senécal

    This paper presents a metaheuristic solution to the optimisation of open pit long-term production scheduling with a stockpile and geological uncertainty. The optimisation formulation is a two-stage st

    Nov 24, 2014

  • AUSIMM
    Performance and Acceptance Testing of Main Mine Ventilation Fans

    By D J. Brake

    In most underground mines, the ventilation system is a significant portion of the total mine capital and operating cost and the largest consumer of underground electrical power. The effectiveness of t

    Jul 1, 2013

  • AUSIMM
    Geostatical Production Grade Estimation in Mount Isa's Copper Orebodies

    This paper describes a detailed geostatistical study of producing copper orebodies at Mount Isa Mines Limited in Queensland, Australia. As a result of this work, kriging has been adopted for grade est

    Jan 1, 1982

  • AUSIMM
    The Development of Models in Minerals Processing

    By I Cameron

    Simulation is increasingly being used to analyse mineral processing operations and explore efficiency options. Engineers that use simulation are rightly concerned with the quality and applicability of

    Jan 1, 1998

  • AUSIMM
    Unmanned Aerial Robots for Remotely Operated and Autonomous Surveying in Inaccessible Underground Mine Voids

    By A Grace, C Sennersten, T Taylor, A Davie, R Lyu, D Pentecost, C A. Lindley, J Craig, L De Macedo Camargo

    Many underground mine void spaces are not suitable for human entry due to unprotected roofs, instability or having an unknown safety state (eg if they are many decades old). Investigations of these vo

    Nov 4, 2015

  • AUSIMM
    Geothermal gradient determination for ventilation and air conditioning modelling at Malmberget Mine

    By F K. R Klose

    Malmberget is a sublevel caving mine owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB), a Swedish state-owned iron ore mining company, in northern Sweden. The mine has an annual iron or

    Oct 12, 2022

  • AUSIMM
    Critical Assessment of Machine Learning Algorithms as Estimation Techniques for a Polymetallic Ore Deposit

    By D Misra, R Ganguli, S Bandopadhyay

    The objective of this paper is to assess the accuracy and applicability of recent state-of-art methods such as the machine learning algorithms (MLA) for mineral resource estimation. Conventional metho

    Sep 26, 2011

  • AUSIMM
    Work Organisation for Attractive Mining – Lean Mining and the Working Environment

    By J Johansson, J Lööw

    Attractive mining workplaces are good, safe and healthy environments. They are also workplaces that the workforce of the future wants to work in. As skilled miners and engineers are already scarce, th

    Nov 4, 2015

  • AUSIMM
    The influence of roadway configurations on VCD and bulkhead design

    By M Salu

    Ventilation control devices (VCD’s) and bulkheads are critical controls used for managing risk in underground coalmines. Following the Moura No. 2 mine explosion in 1994, the Queensland Mines Departme

    Oct 12, 2022