Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Tailings regulation – a South Australian perspective

    By G B. Smith, G M. Marshall, A Querzoli

    The South Australian mining regulatory framework has adopted a performance based approach to the management of risk. This approach has been in place in South Australia for more than 10 years and is in

    Jul 23, 2018

  • AUSIMM
    Development of a Resource Reliability Rating (RRR) System for Mineral Deposit Evaluation and Classification

    By S C. Dominy

    Current and proposed methods of resource classification relate to the geological, economic and technical confidence in the estimated resource. Geological confidence is, however, only vaguely defined.

    Jan 1, 2002

  • AUSIMM
    Preliminary Investigation of the Effect of Pressure on Flotation Performance

    In a previous study, various pyrite depressants were examined to improve the flotation performance of a copper-sulfide ore. Optimal results from this study were used to examine the effect of elevation

    Jan 1, 2005

  • AUSIMM
    Bio-Beneficiation of Australian Iron Ores – Potential Applications of Indigenous Bacteria for Flotation, Flocculation and Phosphorous Removal

    By R Dwyer

    Iron ore currently mined in Australia generally requires very little beneficiation. However, depleting high-grade resources means that in the future low-grade iron ore deposits will need to be mined t

    Jul 11, 2011

  • AUSIMM
    Recent Advances in Instrumentation for Uranium Search

    Several new techniques. which may be applied with advantage to the search for uranium are described. Scintillation type gamma spectrometers are now available for airborne', ground and borehole

    Jan 1, 1968

  • AUSIMM
    Longwall Mining beneath Critical Infrastructure – Prediction versus Performance of the Cataract Tunnel, New South Wales, Australia

    By T J. Sullivan, H Pinkster, G Swarbrick

    From 2002 to 2006, longwall mining was undertaken directly beneath the Cataract Tunnel, which is a 100-year-old, heritage-listed tunnel in Hawkesbury Sandstone responsible for delivering 20 per cent o

    Nov 5, 2014

  • AUSIMM
    Advancing Cut and Cover Tunnelling in Auckland – Experience Gained from New Lynn Rail Trench

    By M McDonald

    KiwiRail has a goal of significantly improving passenger rail services to west Auckland, as part of its DART (Developing Auckland’s Rail Transport) suite of projects. The New Lynn Rail Trench (NLRT) p

    Mar 8, 2011

  • AUSIMM
    Completion of the New Zealand Coal Resources Survey

    The Coal Resources Survey commenced in 1974 as a search for Huntly Power Station coal, but soon developed into the most detailed regional coal search programme to be instituted in New Zealand. The pro

    Jan 1, 1987

  • AUSIMM
    Inrushes and Subsidence

    By S Harvey

    An inrush of water or mud into an underground mine, or sudden subsidence above mining voids represent low probability but high impact risks in underground mining. About two such incidents involving mu

    Jan 1, 1998

  • AUSIMM
    Developing a Water Accounting Framework for the Australian Minerals Industry

    By K Ringwood, J Cummings, C J. Moran

    The development of a water accounting framework that enables consistent and contextual reporting of minerals operationsÆ water use, represents a key sustainable development objective that many Austral

    Jan 1, 2009

  • AUSIMM
    The integration of mine-to-mill and grade engineering at Anglo American’s Los Bronces Mine using IES

    By J Rutter, E Amini, D La Rosa, N Beaton, M Scott, F Faramarz, L Keeney

    Anglo American’s Los Bronces copper mine in Chile has been conducting detailed assessments investigating value adding options for their asset. The mine has conducted several detailed Mine-to- Mill and

    Nov 10, 2020

  • AUSIMM
    Use of Geometallurgy to Predict Tailings Leach Acid Consumption at Olympic Dam

    By E Macmillan

    For any processing plant there will be deleterious elements or minerals which affect production or quality, and a strategy to predict their occurrence and mitigate their impact is required. An early o

    Sep 5, 2011

  • AUSIMM
    Tube Making in Australia

    The title of this paper suggests rather a comprehensive survey of the industry, but since it is not possible to do justice to this in a short paper, and, as the bulk of the Australian trade consists o

    Jan 1, 1935

  • AUSIMM
    Performance Enhancing Blends – Concentrator Feed Blending at Iron Magnet

    By M Darvall

    Magnetite ore blending has yielded signifi cant performance improvements in OneSteel’s magnetite concentrator. The magnetite concentrator beneficiates magnetite ore from the Iron Magnet Deposit and pr

    Jul 11, 2011

  • AUSIMM
    Production Drill and Blast Practices at Ridgeway Gold Mine

    Newcrest Mining Limited (NML) owns and manages the Ridgeway Gold Mine (RGM) located outside Orange in the state of New South Wales. RGM is a new underground sublevel caving (SLC) operation that is ram

    Jan 1, 2002

  • AUSIMM
    Flotation Process Control Optimisation at Prominent Hill

    By J Lombardi

    OZ Minerals' Prominent Hill copper-gold concentrator is located 130 kilometres south east of the town of Coober Pedy in the Gawler Craton of South Australia. The concentrator was built in 2008 an

    Aug 8, 2011

  • AUSIMM
    Mine Waste Cover System Design ù Linking Predicted Performance to Groundwater and Surface Water Impacts

    By C Wels

    Current best management practice requires the placement of a cover onto most types of mine waste including tailings, waste rock and/or spent heap leach rock at closure of the mine. The objectives of a

    Jan 1, 2003

  • AUSIMM
    Predicting Mill Ore Feed Variability Using Integrated Geotechnical/Geometallurgical Models

    By M Astorga, J Jackson, J Gaunt

    The Ban Houayxai mine (BHX) is a relatively low-grade, low-cost, open pit gold-silver deposit in Laos operated by Phu Bia Mining, a subsidiary of PanAust. The ore production rate at BHX is 4.5 Mt/a, w

    Nov 24, 2014

  • AUSIMM
    An Alternative Circuit for Chalcopyrite-Pyrite Ores with Elevated Pyrite Content in Cu-Au Ore Treatment

    By S Farrokhpay, C Akop

    Copper-gold-pyrite ore types with an elevated pyrite head grade utilise a sequential flotation circuit to recover initially a copper-gold concentrate with a pyrite-gold concentrate being produced from

    Sep 1, 2014

  • AUSIMM
    Non-Linear Geostatistics for Geometallurgical Optimisation

    By K G. van den Boogaart, S Konsulke, R Tolosana Delgado

    Adaptive mineral processing has to rely on spatially predicted information on primary geometallurgical parameters, like phase composition, size and shape distributions of grains from various phases, p

    Sep 29, 2013