Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Minimising the Total Cost of Horizontal Development with Burn Cut Blast Rounds

    The total cost of horizontal development can be minimised by optimising the cost of each of the component operations (eg drilling, blasting, etc). Component costs should not be minimised. To optimise

    Jan 1, 1998

  • AUSIMM
    Gold Mining and Dairy Farming - Effective Land Restoration Processes - Poutini Gold Project 1993-1998

    Rehabilitation, reclamation and restoration are all terms used to describe the repair of land after mining. Here, restoration is used to mean restoring the land's original use, capability or prod

    Jan 1, 1998

  • AUSIMM
    MineSense technology empowering bucket resolution Mine to Mill reconciliation

    By M Haest, S Sandler, R Botha, H Lang, K Hume

    Benchmark practices in the mining industry include the establishment of Quality Programs — Quality Assurance and Quality Control (QAQC) — to monitor the correct execution of sampling protocols and con

    Mar 22, 2022

  • AUSIMM
    Resue Firing and Dilution Control in Narrow Vein Mining

    Mining of narrow vein mineralisation, invariably depending on the mining method selected, involves the extraction of both ore and waste rock. The level to which mining of waste rock can be minimised d

    Jan 1, 2008

  • AUSIMM
    The Stanwell Magnesium Project ù Providing New Environmental Standards for Magnesium Production

    By B Goebel, G Baker

    The Australian Magnesium Corporation Limited (AMC) is constructing the worldÆs largest magnesium metal plant at Stanwell, 24 km west of Rockhampton in Central Queensland. The $1.3 billion, 97 000 tonn

    Jan 1, 2002

  • AUSIMM
    Settings and Styles of High-Sulphidation Gold Deposits in the Cajamarca Region, Northern Per·

    The Yanacocha district hosts the largest and most significant acid-sulphate, high-sulphidation deposits in Per· with total production, reserves and resources of over 27 million ounces of gold. Several

    Jan 1, 1999

  • AUSIMM
    TerraFlowing_TM – an innovative and flexible method for tailings dewatering

    By D Stephenson, N R. Steward

    “TerraFlowingTM” is a dewatering process that addresses both the value proposition of Tailings as a Resource™, and the safe storage of tailings. “TerraFlowingTM” incorporates two stages of cyclone dew

    Jul 1, 2021

  • AUSIMM
    Permitting in the face of uncertainty – how to deliver confidence to regulators and investors

    By R L. Grogan

    Mining is currently undergoing a progressive expansion into novel environments (such as the deep ocean), commodities (such as tantalum, rare earths, and other ‘green economy minerals’), and new method

    Jul 25, 2018

  • AUSIMM
    The Practicalities of Implementing Net Volume Licensing of Water Use in Mines and Quarries - A Discussion Based on Victorian Case Studies

    By A Horne, Z Graszkiewicz, D Dettrick, R Evan, B Neal

    "Most of VictoriaÆs rivers and aquifers are already fully allocated or reaching full allocation. In regions without a well-established water market, access to water entitlements to facilitate new deve

    Nov 26, 2013

  • AUSIMM
    Making Design and Construction Work

    By S Porter

    The Melbourne City Link Project is a privately funded road infrastructure project linking three significant existing freeways in the vicinity of the Central Business District. The State Government, th

    Jan 1, 1999

  • AUSIMM
    A Case for Change - Defining Mine Sealing and Understanding Flammable Mixtures During Sealing

    By A Mackay

    As a result of the explosion in the 512 panel at the Moura No 2 mine in 1994 the role of the ventilation officer (VO) to submit sealing plans (on behalf of the operator/underground mine manager) has b

    Jul 1, 2013

  • AUSIMM
    "Gravity Flow Under Moisture Conditions Control and Management of Drawpoint Mudflow"

    After many years of studying the rock mass gravitational flow phenomenon, it is well known that moisture conditions may change the mechanical properties of the caved and broken material, causing diffe

    Sep 26, 2011

  • AUSIMM
    The Use of Fractal Geometry to Model the Spatial Continuity of Gold Grades

    By White A. H, Vihena M. T M B

    Presently, orebody modelling consists basically of fitting a mathematical model to represent spatially a certain geological variable, generally grade. An orebody model is constructed from a set of s

    Jan 1, 1995

  • AUSIMM
    Remediation of Wall Failure at Kalgoorlie Consolidated Gold Mines’ Golden Pike Cut-back 2016

    By J Darbritz

    "This paper details the events leading up to a slope failure that occurred at Kalgoorlie Consolidated Gold Mines (KCGM) and the remediation method executed using rope access specialists.n January 2016

    Nov 15, 2016

  • AUSIMM
    Evaluation of Exploration Projects

    It is difficult to evaluate exploration properties in a manner that is transparent, repeatable and easily re-calculated to cater for different geological interpretations, but the risk-based assessment

    Jan 1, 2007

  • AUSIMM
    Mineralogy and Magnetic Susceptibility of the Proterozoic Granites, Related to Gold Mineralisation, Pine Creek Geosyncline, Northern Territory, Australia

    By Z U Bajwah

    During the Palaeoproterozoic, a large number of granitic intrusions were emplaced in the various parts of the Pine Creek Geosyncline (PCG). In the central region, the granitic magmatism is represent

    Jan 1, 1994

  • AUSIMM
    An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut Project

    By D J. Thobaven

    Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu

    Nov 24, 2014

  • AUSIMM
    Robust construction and quality assurance culture for tailings storage facilities – equally important as robust design and review practice

    By M Laxman, A Kundu

    After multiple tailings dam failures in recent times, the owner organisations have made increased efforts to step up the governance systems to industry best practise in the design, construction and op

    Jul 23, 2018

  • AUSIMM
    Caterpillar 3500 Series Engines for Off Highway Trucks

    A new engine family has been developed by Caterpillar Tractor Co. for application in off-highway trucks. This family, the 3500 Series is available in three configurations, covering a 600-1200 kilow

    Jan 1, 1982

  • AUSIMM
    Rock Strength Anisotropy and Its Importance in Underground Geotechnical Design

    By M Sandy, A Vakili, J Albrecht

    Although rock strength anisotropy is a well-known phenomenon in rock mechanics, its impact on geotechnical design is often ignored. No widely accepted guideline currently exists for its characterisati

    Nov 5, 2014