Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    SBRE – a simple, flexible and scalable framework to perform conditional simulations for uncertainty quantification

    By J Ashford, Minniakhmetov

    Geostatistical simulations are the best practice for uncertainty quantification in non-linear systems. Simulations are currently undertaken on an ad hoc basis in the mining industry due to high requir

    Mar 22, 2022

  • AUSIMM
    Simulation as a Tool for Mine Planning

    By J Greberg

    This paper discusses the use of simulation in the mine planning process. A case study on the Newcrest Cadia East project is presented, and the challenges and possibilities for using simulation as a to

    Nov 22, 2011

  • AUSIMM
    Rock Mass Characterisation and Analysis for Excavation Design – A Discrete Fracture Network Approach

    By F M. Weir, M Fowler

    The design of excavations in rock must, implicitly or explicitly take into consideration the influence of small- and large-scale geological structures. For most sites the complexity of a fractured roc

    Nov 5, 2014

  • AUSIMM
    Building Partnerships with Indigenous People to Improve their Economic Circumstances to Achieve Social Cohesion and Social Licence to Operate û A Case Study of the West Pilbara, Australia

    The relationships between Aboriginal Traditional Owners and mining companies have often been mired in dispute, particularly since the High Court Mabo decision and the Native Title Act of 1993. In the

    Jan 1, 2009

  • AUSIMM
    Earthworks or Landforms? Designing for Lease Surrender

    By S J. Henderson

    Over much of Australia, rainfall is highly seasonal and storm-driven. Consequently, operational mines often need extensive earthworks – drains, dams and levees – for protection during the occasional l

    Jun 28, 2016

  • AUSIMM
    Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushers

    By J V. Mehrabani, A R. Sayadi

    Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul

    Sep 26, 2011

  • AUSIMM
    Setting Best Practice: FIFO at the Mount Keith Concentrator

    By S O. Hille

    Modern remote mining operations in Australia are more commonly trending towards fly-in/fly-out (FIFO) sites. This trend is driven by numerous factors including increased business centralisation, reduc

    Jan 1, 2002

  • AUSIMM
    No entry mechanised presink of the Wira Hoisting Shaf

    By D Kilkenny

    This paper discusses the use of a mechanised shaft sinking machine Herrenknecht Vertical Shaft Sinking Machine (VSM) – to conduct the 93 m presink for the Wira Hoisting Shaft at the Prominent Hill Min

    Mar 29, 2023

  • AUSIMM
    Transformation of automated optical image analysis software Mineral4/Recognition4 to Mineral5/Recognition5

    By A Poliakov, E Donskoi, K Vining

    The automated optical image analysis software Mineral4/Recognition4 (M4/R4) is capable of performing comprehensive characterisation of different materials throughout the iron ore value chain, includin

    Nov 8, 2021

  • AUSIMM
    Project and execution of the excavation for a haulage shaft with raise boring techniques

    By M Orunesu Preiata

    The Odysseus Project is part of the high-grade Cosmos Nickel Complex that lies 30 km north of Leinster. The Odysseus definitive feasibility study (DFS) was approved by the Western Areas’ board in Octo

    Mar 29, 2023

  • AUSIMM
    Hydrogen reduction of as-received and pre-oxidised NZ titanomagnetite ironsands in a small-scale high-temperature fluidised bed

    By B J. Monaghan, R J. Longbottom, S Prabowo, D Del Puerto, B Maisuria, C W. Bumby

    The use of hydrogen as a reducing agent can substantially reduce carbon dioxide (CO2) emissions from the ironmaking process. Iron ore fines can be reduced in a fluidised bed (FB) using hydrogen (H2) a

    Sep 18, 2023

  • AUSIMM
    Developing and Implementing Ore-Specific Targets for the Rosebery Concentrator

    Production targets are the basis for almost every decision made by operations personnel in the daily operation of a concentrator. It is the production targets that determine how the plant is operated

    Oct 29, 2012

  • AUSIMM
    Upgrading of MgO in Dolomite Ore by Froth Flotation

    Upgrading of MgO in Dolomite Ore by Froth Flotation

    Sep 13, 2010

  • AUSIMM
    Best practice in Multiple Indicator Kriging (MIK) – importance of post-processing and comparison with Localised Uniform Conditioning (LUC)

    By G Zhang, I Glacken

    Multiple indicator kriging (MIK) has been used in the minerals industry for some decades. As one of the non-linear estimation methodologies, MIK has advantages related to resolving multiple or mixed p

    May 24, 2023

  • AUSIMM
    An Ecological Approach to Koala Conservation in a Mined Landscape

    By R Wheeler, E Stalenberg, J Lemon, M S. Crowther, D Lunney, K Ross

    Gunnedah, in north-western New South Wales (NSW), including the town, the surrounding Liverpool Plains and the Pilliga forests to the west, are currently the subject of intense mining interest for coa

    Jul 10, 2012

  • AUSIMM
    Tailings Dewatering, Dry Screening and Water Clarification for Reduced Water Usage

    By R Norris, M Dunne

    Substantial efforts by the industry, as well as by process and equipment designers, have resulted in many innovative developments that provide cost effective reductions in water usage. This paper show

    Jan 1, 2006

  • AUSIMM
    Automated Mineralogy for Ore Characterisation and Plant Optimisation

    By Y Gu, R Fandrich

    Traditionally, characterisation of the mineralogy and textures of ore and rock samples were based on observations of hand specimens and thin sections using an optical microscope. The extent of the dat

    Jan 1, 2007

  • AUSIMM
    Evaluation of the Ernest Henry Cu-Au Deposit Mineral Resources

    By A J. Ryan

    The Ernest Henry copper-gold Mineral Resource is the major asset heldby Ernest Henry Mining Pty Ltd, comprising A$6.4 billion of containedmetal. The case history presented below describing the evoluti

    Jan 1, 1998

  • AUSIMM
    Pulp Sampling Techniques for Steady State Assessment of Mineral Concentrators

    The importance of proper planning, preparation, and execution of a steady state sampling campaign for metallurgical plant assessment must not be underestimated. Careful planning can increase the am

    Jan 1, 1976

  • AUSIMM
    Pillar Design Procedures and Research Methodologies - Can There or Should There be a Unified Approach?

    After some 50 years of worldwide research in relation to coal pillar mechanics and design as well as numerous workshops and technical papers related to these issues there is still some significant dis

    Nov 25, 2010