Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Recommissioning of the Treatment Plant at Mary Kathleen Uranium Ltd.

    The recommissioning of the plant at Mary Kathleen involved several distinct phases. The previous plant process was modified significantly, the plant capacity was increased by the addition of new eq

    Jan 1, 1978

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    Characterising the Reasons for the Difference in Performance of Two Ore Blends in Early Processing at OZáMinerals Prominent Hill Operation

    By D J. Bradshaw, E M. Wightman, C L. Evans, B Triffett

    During the commissioning phase of Prominent Hill, periods of reduced recovery were experienced with higher-grade ore blends. This was unexpected and as part of the process to identify the cause, surve

    Oct 29, 2012

  • AUSIMM
    Blended Cements in Australia

    Aspects and anomalies in the present Standard Specifications for Blended Cements which may have operated in Australia against the development of the greater use of Slag Blended Cements are noted. E

    Jan 1, 1979

  • AUSIMM
    State and Development Trends of EDP-Based Operation Monitoring and Remote Control in the Coal Mining Industry of the Federal Republic of Germany

    By Stuedel J

    Starting from comprehensive programme systems for monitoring tasks of any kind, this paper follows the steps of the programme system hierarchy from top to bottom. The monitoring and control centres fo

    Jan 1, 1985

  • AUSIMM
    Simulation and Analysis of Media Behaviour in the Tower Mill by Discrete Element Method for Estimating the Power Draw and Spatial Distribution of Grinding Process

    Simulation and Analysis of Media Behaviour in the Tower Mill by Discrete Element Method for Estimating the Power Draw and Spatial Distribution of Grinding Process The trends to the Tower Mill (TM) fo

    Sep 13, 2010

  • AUSIMM
    Technical Challenges for the Pike River Coal Project in a Remote Mining Environment

    By J McNee

    Pike River Coal Limited (PRCL) is developing the Pike River Coal Mine in the Paparoa Ranges of New ZealandÆs South Island. The mine is being developed to extract a coking coal deposit of the Brunner S

    Jan 1, 2007

  • AUSIMM
    The Design and Operation of Heavy Medium Recovery Circuits for Improved Medium Recovery

    In dense medium processes for the beneficiation of minerals the consumption of medium (generally ferrosilicon) represents a major component of the operating cost. This provides a strong incentive

    Jan 1, 1987

  • AUSIMM
    A Chronostatistical Approach to Hydrometallurgical Plant Process Control

    By R C. A Minnitt

    This paper illustrates the use of variography and moving average plots as an aid to analysing variations in the process that can be used to direct the improvement efforts. The hydrometallurgical proce

    Jan 1, 2008

  • AUSIMM
    The Application of Computer Modelling for Blasting and Flow in Sublevel Caving Operations

    By P Dare-Bryan

    Many mines have an interest in improving fragmentation at their sublevel caving operations in order to produce better ore recovery, lower dilution and less overbreak. The primary requirement for the e

    Jan 1, 2005

  • AUSIMM
    Gympie Gold ù The Revival of the Monkland Mine

    By D Kahler

    Modern gold production from the Gympie Goldfield commenced in 1995 with the first production from the Monkland Mine. The primary ore target was the 2.5 m wide Inglewood Fault ore zone, which was initi

    Jan 1, 2002

  • AUSIMM
    Genesis of the Mount Isa Base Metal Deposit

    Neither the copper orebodies nor the zinc-lead-silver orebodies at Mount Isa were formed syntectonically as has been claimed for the last 20 and 10 years respectively. Both orebody types were cogeneti

    Jan 1, 2000

  • AUSIMM
    Geochemical Studies in the Coromandel Peninsula - The Merits of Mercury in Soils as a Pathfinder for Precious Metal Mineralisation in the Thames-Waihi Area

    The mercury, gold, silver, copper, lead and zinc values of soils over altered and mineralised rock were determined to establish the potential use of mercury as an indicator element in geochemical pros

    Jan 1, 1979

  • AUSIMM
    Role of Feed Characteristics in Jigging Plant Optimisation - A Case Study

    By H Jha, M C. Thomas, P Gupta, S K. Sit

    The modern jig with a state-of-the-art control system is much more effective than its older version. This improved control system is used to modulate the amplitude and the frequency of the jig cycle.

    Jan 1, 2007

  • AUSIMM
    Sampling of Mineral Process Streams

    While sampling techniques used by the mineral industry continue to improve, sampling is still an area which is often neglected. It is often left to personnel who do not fully appreciate the significan

    Jan 1, 1976

  • AUSIMM
    Size Patterns of Gold-Silver Deposits in the Hauraki Goldfield, Coromandel Peninsula

    This paper presents an analysis of the production data for the period 1861 - 1953 from hydrothermal gold-silver deposits of the Hauraki Goldfield. To directly compare the metal content of the deposits

    Jan 1, 1981

  • AUSIMM
    The Use of the Ring-Loaded Disc Test in the Quantification of Rock Comminution Behaviour

    By S Blackburn, T Veasey

    The physical and mechanical properties of rock can be measured by a variety of standard tests, and studies have shown that there should be a fundamental connection between breakage in comminution and

    Jan 1, 2000

  • AUSIMM
    The New Latent Conditions Clause in the Recent as 2124-1986, General Conditions of Contract and its Application in Tunnelling Contracts

    The latent conditions clause in various general conditions of contract have traditionally proved to be a source of significant disputes in tunnelling contracts, even when extensive geotechnical i

    Jan 1, 1987

  • AUSIMM
    Description of the Shear Stree Distribution around and Excavation at WIPP

    The estimation of the shear stress distribution around an excavation is important to the design of the excavation since shear stresses can generate cracks, loosen grain boundaries or otherwise degrade

    Jan 1, 1998

  • AUSIMM
    Some Concepts of Stack Injection

    By Collins BJ

    Basic principles of stack injection are outlined and supported by calculations of thermal, chemical and aerodynamic requirements of an ideal 4000 tpd furnace. Calculated results show that these requi

    Jan 1, 1975