Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Marine Recovery of Tunnel Boring Machine from Botany Bay

    By S Norman

    The Water Delivery Alliance (WDA) was established to design, construct and commission the pump station and desalinated water delivery pipeline to link the desalination plant on the Kurnell Peninsula (

    Mar 8, 2011

  • AUSIMM
    Heterogeneity tests and core logging – a final reconciliation

    By A C. Chieregati, A Heberle, F L. S P Villanova

    Since the publications of Gy’s initial work, many authors have discussed the approaches to estimate the variance of the fundamental sampling error (FSE). Experimental tests suggested by Pitard and Fra

    May 9, 2017

  • AUSIMM
    Improvement in Iron Ore Agglomeration Through Design Modification in Coke Crushing Plants

    By B K. Da, S A. Balaji, G P. Roy, T K. Dutta

    The raw material handling complex at the Durgapur steel plant provides iron ore, crushed coke and flux to two sinter plants. Either some facilities were not envisaged or not properly designed before t

    Jan 1, 2005

  • AUSIMM
    Effect of alumina on microstructures of iron ore sinters from the perspective of the phase equilibria of the CaO-SiO2-Fe2O3-Al2O3 system

    By A Takahashi, Y Uchisawa, M Hayashi, T Watanabe, M Susa

    Owing to the deterioration of iron ore, the Al2O3 concentration in iron ore increases, and thus it is important to investigate the effect of increment in Al2O3 concentration on the microstructures of

    Jun 19, 2024

  • AUSIMM
    Improving the performance of blind uphole rises at Ernest Henry Mine – a case study

    By T Purvis, Z Liu

    Ernest Henry mine (EHM) is an underground sublevel caving mine located in north-west Queensland with a production rate of 6.4 Mt/a. The mine has sublevels spaced with a 25 m vertical interval. The pro

    Oct 16, 2017

  • AUSIMM
    Towards a Reliable Gas Emmision Prediciton Method for Australian Longwall Minging

    By Lunarzewski L, Truong D

    Although there are sound principles used in the world recognised methods of gas emission prediction, results based on these methods applied to several Australian longwall extractions have yielded

    Jan 1, 1988

  • AUSIMM
    Data cross validation for a newly commissioned dynamic drop test facility

    By D W. Evans

    Research into the dynamic properties of ground support elements continues to grow at a global level, given the increasing importance of this field of application within underground hard rock mining. M

    Nov 29, 2022

  • AUSIMM
    Are Battery Electric Vehicles (BEVs) the answer to the challenge of complying with the European Union (EU)’s new TLV-TWA for diesel exhaust contaminants?

    By A Halim

    The European Union (EU) have recently issued new Threshold Limit Value-Time Weighted Average (TLV-TWA) for diesel exhaust contaminants, which are CO, NO2 and DPM. The new limits for CO and NO2 were is

    Oct 12, 2022

  • AUSIMM
    The Influence of Geology on Blasting Hazards and Results

    By T N. Little

    The aim of any rock breaking activity is to achieve success by developing designs that are blasting objective-specific and geology-specific, and then implementing such designs. This paper targets mini

    Aug 22, 2011

  • AUSIMM
    Development of the 1 in 5.3 Conveyor Decline at Ridgeway Gold Mine

    Located 350 km west of Sydney and 20 km outside Orange, NSW, lies the Ridgeway Gold Mine û NewcrestÆs flagship Underground Gold Mine. Key to success at Ridgeway has been the fast tracked development o

    Jan 1, 2002

  • AUSIMM
    Improvements in estimating strengths of loose tailings: results from the TAILLIQ research project

    By D Reid, J Vinod, M Rahman, A Fourie, T Vo, J Ayala, A Russell

    This paper reports on an industry and Australian Research Council funded research project, TAILLIQ, that is a joint initiative between four Australian Universities. The paper discusses the accuracy wi

    Jul 1, 2021

  • AUSIMM
    Challenges in Developing Integrated Process Models Based on Industrial Survey Data

    By M Yahyaei, F Vos, J Siliezar

    Site-based case studies (including data collected from industrial surveys) and their application in evaluating circuit performance, have a significant role in developing reliable process models. Such

    Sep 1, 2014

  • AUSIMM
    A Geometallurgical Study of the Witwatersrand Gold Ore at Carletonville, South Africa

    By D L. Reid, G Nwaila, J Petersen, J-P Franzidis, Y Ghorbani, M Becker, F C. de Beer, L C. Bam

    Traditional methods of gold extraction have involved comminution and processing via cyanide leaching, all of which are associated with energy, cost and environmental implications. Subsequently, numero

    Sep 29, 2013

  • AUSIMM
    Chelopech Mining EAD and Best Available Techniques for Management of Waste Rock in Mining Activities

    Chelopech Mining EAD and Best Available Techniques for Management of Waste Rock in Mining Activities

    Sep 13, 2010

  • AUSIMM
    Lessons learned from attempts at minimising CO2 emissions in process metallurgy – pyrolysed secondary raw materials, bio-coke, and hydrogen as alternative reducing agents

    By F Diaz, G Hovestadt, B Friedrich, D Latacz, M Sommerfeld

    The metallurgical sector significantly contributes to the global carbon footprint and encounters the challenge of developing more sustainable production methods. This study introduces novel approaches

    Jun 19, 2024

  • AUSIMM
    A Phased Approach to Test Programs to Meet Feasibility Study Requirements

    By E Williams

    The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re

    Oct 5, 2011

  • AUSIMM
    Bias Testing of Mechanical Sampling Systems for Coal - A Review of Test Results and Call for Use of Multivariate Statistical Analyses

    By C D. Rose

    A review and summary of the results of 120 coal sampling system bias tests is presented. This review supports new methodology using multivariate statistics currently being considered by ISO TC27 SC4.

    Aug 21, 2012

  • AUSIMM
    Long Term Mine Planning at BHP Iron Ore Ltd's Mt Whaleback Mine

    By R D ROSENTHAL

    BHP Iron Ore Ltd's Mt Whaleback is the largest single open-pit iron ore mine in the Pilbara region of Northwestern Western Australia. A division of BHP Minerals, one of three core businesses o

    Jan 1, 1992

  • AUSIMM
    Reducing the Effect of Wind on Airblast Measurement During Blasting

    By K Henley

    One of the greatest practical difficulties of measuring airblast occurs when a significant wind is blowing onto the microphone. Small windscreens are usually used to mitigate the wind noise on the mic

    Aug 24, 2015

  • AUSIMM
    Comparing Different Prediction Techniques, and Field Results From South African Opencast Collieries

    By E de Necker, F D. I Hodg, L-M Cruywagen

    The acid mine drainage (AMD) situation at three opencast collieries in the Witbank Coalfield, South Africa, was evaluated from different perspectives. Twenty-seven test pits were dug into the spoils o

    Jan 1, 2003