Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Applicability of Endless and Direct Rope Haulage Technology for Transportation Systems on Decline ShaftsBy E N. Sparg, O D. A Deuchar, F Needham
Decline shafts are an attractive option to both new and existing mining operations where there is a need to access an inclined orebody deposit via on-reef development so as to generate a return in the
Jan 1, 2005
-
State-of-the-art of electroslag refining and challenges in the control of ingot cleannessBy G Stovpchenko, G Jianjun, L Medovar
Electroslag remelting (ESR) today and into the future, will still be the main process for producing high-quality ingots by suppressing segregation, not just refining chemical composition from impuriti
Jun 19, 2024
-
Cost-Effective Dry Screening, Dewatering and Water TreatmentBy R Norris, M Dunne
Mining and mineral processing is expected by society and obliged by law to operate in an environmentally friendly fashion, minimising the impact on and avoiding damage to the environment. Substantial
Jan 1, 2006
-
Mine to mill study – Bond Work index as factor for intrusive and non-intrusive rock typeBy W F. E Ouedraogo
This study data has been collected on a three-month period from November 2020 to January 2021 and based on three different pits: Vindaloo Main, Vindaloo Central and Bouere. Both pits having specific g
Jun 22, 2022
-
Metallurgical Accounting in the Northparkes Concentrator - A Case StudyBy R Morrison, R Dunn
In many mineral processing operations, the reported production figures for an accounting period may not make the best use of available data. While most of the mathematical approaches, such as check-in
Jan 1, 2007
-
Optimum Dig Lines for Open Pit Grade ControlBy I Treloar, T Elenbaas, E Isaaks
Critical reviews of grade control generally focus on blasthole sampling and the estimation of ore control block model (OCM) grades, with little or no attention given to dig-line design. For example, t
Aug 18, 2014
-
Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?ProcessBy T Ireland, S Eratne, W Newns, P Spies
The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest
Sep 17, 2014
-
The Flash-Point Test for LeadIF lead be heated with concentrated sulphuric acid two distinct actions will usually be observed. In the first, bubbles begin to be evolved more or less rapidly from the lead, and in the second, which
Jan 1, 1930
-
Progress towards Data-driven Mine Planning via a Virtual Geometallurgical LaboratoryBy E Vargas, A Egana, M Alarcon, X Emery, A Barberan, A Lopez, N Morales, C Friedrich
"As the cost in time and money of data from sensors and small-scale tests has reduced, additional challenges have arisen. Although many mine data sets are not big relative to those in other discipline
Jun 15, 2016
-
Statutory Compliance of Sealing Plans and Information Required by Queensland Industry RegulatorsFollowing the Moura No 2 Wardens Court of Inquiry and subsequent changes to the Queensland Mining Legislation there is a requirement in Queensland coal mines for: a person with the recognised competen
Jan 1, 2005
-
Cost Management OptimisationBy B King
Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro
Nov 24, 2014
-
The Product Quality System at Cliffs Natural Resources – Koolyanobbing Iron Ore OperationsBy A L. Wills
Cliffs Natural Resources Pty Ltd (Cliffs) operates iron ore mines in the Koolyanobbing region of Western Australia. Ore is mined from three separate hubs and trucked to Koolyanobbing. There it is crus
Jul 11, 2011
-
Change Challenges for Large Open Pit MinesBy R Durchholz, A-J Heiertz, R Schmitz
Mining of lignite is the largest bulk materials handling activity in Europe. In order to mine this lignite, with an average calorific value of only a third of bituminous coal in an economical way, hig
Sep 18, 2012
-
The use of collaboration and management to turn-around the performance of a failing copper mineBy M Jacobs
This abstract discusses a heap leach copper mine that was failing to perform and as a result was not meeting targeted production. The mine had numerous technical challenges including: high water inflo
Jun 22, 2022
-
Sirosmelt Investigation - An Example of Process Evalutaion TechniquesBy Nilmani M, Malone J, Taylor RN, Floyd JM, Gray NB, Fountain CR
CSIRO staff and University of Melbourne staff and students collaborated in an intense programme of investigation on the CSIRO 50 kg Sirosmelt pilot plant.In two days of operation copper matte converti
Jan 1, 1985
-
Panel Caving Scheduling Under Precedence Constraints Considering Mining SystemBy E Rubio, N Morales
Currently, mine plans are optimised by using several criteria as objective functions, like profit, life-of-mine, concentration of some pollutants, mining costs, confidence level or ore resources, with
Sep 26, 2011
-
Cyanide Code Recertification - The Three-Year ChallengeBy R J. Beazley, M C. Woods
"The International Cyanide Management Code (the Code) is a voluntary industry program for gold miners and associated cyanide transporters and cyanide producers. By becoming a signatory, a company comm
Sep 26, 2013
-
Exploration Success at the Martabe Gold Mine, IndonesiaBy P Albert, S Crispin, J Hertrijana
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Martabe gold mine is Indonesia’s largest precious metals-only producer and is also one
Mar 18, 2015
-
Drill and Blast - A Necessary Evil Or?It is well documented that drill and blast outcomes affect the downstream mining processes of loading, hauling, crushing and grinding but it can also significantly impact on mine profitability via dil
Jan 1, 1999
-
Smelting of different hydrogen-reduced bauxite residue-calcite pellets for iron and alumina recoveryBy J Safarian, M K. Kar
Bauxite residue is one of the most important by-products from the alumina industry with no commercial use till now. The utilisation of bauxite residue through pelletising with different lime additions
Jun 19, 2024