Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The possibility of using an autogenous Hydrogen-DRI slag as a raw material for vanadium extraction

    By N Kojola, A Vickerfält, J Huss

    The possibility of using an acidic autogenous hydrogen direct reduced iron (H-DRI) slag as a basis for vanadium extraction is investigated. For a raw material to be suitable for producing high-quality

    Jun 19, 2024

  • AUSIMM
    Predicting Iron Ore Fines Shipment Moisture

    By J E. Everett, D Linden, P Maney

    In response to the implementation of a new schedule for iron ore fines in the International Maritime OrganizationÆs (IMO) International Maritime Solid Bulk Cargoes (IMSBC) Code, improved measures for

    Aug 12, 2013

  • AUSIMM
    Tech Services - It's a Blast

    Two years ago I was sitting in a big lecture theatre at the School of Mines in Kalgoorlie at the annual New LeadersÆ Conference listening to a guy tell us all how much he loved his job, travelling the

    Jan 1, 2008

  • AUSIMM
    Wet grinding, settling and filtering characteristics of Australian and Brazilian iron ores

    By Q Zhou, J Pan, D Q. Zhu, C C. Yang

    Oxidised pellets have become an indispensable high-quality charge for blast furnaces (BF) due to their uniform particle size, high iron grade, high mechanical strength, good metallurgical performance,

    Sep 18, 2023

  • AUSIMM
    Thin spray liners for face support at Kanmantoo

    By B Roache

    Ground support installation into the face of development headings has become an accepted practice at many Australian hard rock mines. Ground support is installed in the development face to reduce pers

    Mar 29, 2023

  • AUSIMM
    Creep Due to Chemical Alteration of Rocks – A Case Study in Brown Coal

    By B J. Wight, R Mackay, S Kim

    Improving the understanding of the processes governing ground movements in and around brown coal open cuts is of significant interest for both operating stability and rehabilitation. Brown coal, ligni

    Nov 5, 2014

  • AUSIMM
    Direct Chill Casting of Aluminium at Comalco, Bell Bay

    Comalco's Bell Bay smelter produces some 94 000 t.p.a. of primary aluminium in the form of foundry alloys, extrusion billet and rolling blocks. The extrusion billet and rolling block are produ

    Jan 1, 1977

  • AUSIMM
    Design for Tunnel Fire Life Safety – Working Together in the New Zealand Context

    By E Claridge

    There are a number of major infrastructure tunnelling projects currently underway or proposed in New Zealand, including construction of new road and rail facilities and the refurbishment of existing r

    Mar 8, 2011

  • AUSIMM
    Control System Selection, Strategy and the Future at Pasminco Mining - Broken Hill's Southern Concentrator

    In 1987 the control strategies at the then ZC Mines' New Broken Hill Consolidated concentrator were a miscellaneous mixture of computer hardware and technology for ISA, grinding and residue thi

    Jan 1, 1991

  • AUSIMM
    The evolution of production blasts at Ernest Henry Mine

    By C te Kloot, Z Liu

    Blast performance and the resulting drawpoint condition and volume of oversize has the potential to impact operator safety and mine productivity. Underground measurements showed that approximately 14

    Oct 16, 2017

  • AUSIMM
    Modelling Full-scale Blast Heave with Three-dimensional Distinct Elements and Parallel Processing

    By A Tawadrous, B Wheeler, D S. Preece, S A. Silling

    The two key results of rock blasting are fragmentation and movement of geomaterials. Movement/flow of the blasted rock is often referred to as heave. Moving rock with explosives rather than mechanical

    Aug 24, 2015

  • AUSIMM
    The Waterview Connection Project – Progress to Date

    By S Hanke, J Burden, P Spies

    The Waterview Connection will complete Auckland’s long-planned Western Ring Route, a 48 km north-south motorway alternative to State Highway 1 that bypasses the central city to the west. The project i

    Sep 17, 2014

  • AUSIMM
    Copper-Molybdenum Concentrator Surveys Using Mineralogy and Process Benchmarking Tools to Improve Overall Plant Performance

    By P Thompson, D Rose, S Yu, W Baum, R Zahn, D Meadows, G Hall

    Opportunities to improve mill operations are often cited by mining companies and recognised in many concentrators spread throughout the world but are not always followed through. Copper-molybdenum con

    Sep 1, 2014

  • AUSIMM
    Development and permitting of an underground mine at Cowal Gold Operations

    By J Northfield, L Neesham

    The GRE46 Underground Project lies beneath the environmentally unique and culturally endowed shore of Lake Cowal. The ore body is open both along strike and at depth and is currently defined to a stri

    Mar 15, 2021

  • AUSIMM
    Bottle Rolls versus Stirred Beaker Leach Testing – Which is Best?

    By G Small, A Lazamanana, C Greet

    When conducting gold leach tests on free milling gold ores which method is the best, bottle rolls or the stirred beaker test? Recently, a client requested that gold leach tests be conducted using the

    Sep 7, 2015

  • AUSIMM
    A Critique of the Push-Pull Hybrid Ventilation System

    By A S. Derrington

    This paper describes a hybrid ventilation system, which uses secondary fans that also act as de-facto primary fans to extract fresh airflow from the mine intake raise system. Also discussed are the as

    Jul 1, 2013

  • AUSIMM
    Dependence of Flame Front Speed on Iron Ore Sintering Conditions

    By J Zhao, C E. Loo

    The flame front is a narrow region in the iron ore sintering bed where coke particles combust. The maximum flame front temperature is as high as 1400°C. At high temperatures, the sinter mix compo

    Jul 13, 2015

  • AUSIMM
    Integrated process modelling for the Kalgoorlie Nickel Smelter

    By G Sartor, A Rich, D Grimsey, R Forzatti, M White

    An in-depth process model was developed for the pyrometallurgical, off-gas systems and water balance of the Kalgoorlie Nickel Smelter. This model was used to assess plant capacity with changing concen

    Aug 21, 2024

  • AUSIMM
    A Historical Perspective of the Application and Success of Geometallurgical Methodologies

    By S R. Williams

    There is a sense of geometallurgy being new; a new methodology for mining project development and improved operational strategy. One of the main challenges that any ænewÆ technology faces is a validat

    Sep 29, 2013

  • AUSIMM
    Dilution optimisation in sublevel open stoping operations

    By A Vakili

    Dilution is associated with considerable direct and indirect costs in underground open stoping operations. As shown in previous works, an improved ability to predict dilution enables the economic risk

    Mar 29, 2023