    Optimisation of Steam and Energy Usage in a Nickel Refinery

    The nickel refinery at Yabulu consumes an average of 118,000 kg/h of low pressure steam in stripping operations to-recover ammonia and carbon dioxide from product liquor and ore tailings streams. The

    Jan 1, 1985

  • AUSIMM
    The Effect of Deep Bed and High Suctions on the Iron Ore Sintering Process

    The effects of changes in sintering bed height, coke fuel, suction and basicity on sinter productivity, physical strength and mineralogy were determined. It was found that, for a given iron ore, th

    Jan 1, 1975

  • AUSIMM
    Marketing Uranium-New Energy Source

    By Lloyd C. J

    The uranium markets are at present well covered by available producers. However the predicted increase in demand, recently reinforc- ed by the Arab oil crisis, will by, the early 1980s'outdista

    Jan 1, 1974

  • AUSIMM
    The Interaction Between a Tunnel/Cavity and Nearby Structures

    By Abdalla MH

    The deformation resulting from the presence of a tunnel may signifcantly affected, nearby structures and need to be considered during design of both tunnel and structure. The aim of this paper is t

    Jan 1, 1987

  • AUSIMM
    Staying Focused in Turbulent Times

    It's a great pleasure to be here today, for a whole series of reasons. First of all, when I first went to Perth back in 1972, I shortly afterwards began auditing and one of the people to pick on

    Jan 1, 1997

  • AUSIMM
    High Blow Energy Hydraulic Impactor

    The introduction of many new hydraulic ally and pneumatically powered impact breakers over the past few years demonstrates the growing interest in this technique of breaking rocklike material. The

    Jan 1, 1978

  • AUSIMM
    The Geology Of The fitzpatrick Area North Broken Hill Limited, Broken Hill, NSW

    In August, 1975, North Broken Hill Limited announced that an intersection of 37.3 m of high grade lead-silver-zinc mineralisation, assaying 26.2 per cent Pb, 495 g/tonne Ag and 21.2 per cent Zn ha

    Jan 1, 1983

  • AUSIMM
    Maintaining the Practical Component in Mining Engineering Education Programmes

    By M Kizil

    Mining Engineering Degree programs have traditionally had a practical emphasis and have been highly vocational in nature. However, over the years, there has been an increasing attention to the more sc

    Jan 1, 2002

  • AUSIMM
    Australian Participation in the Ocean Drilling Program: an Economic Geology Perspective (Australian ODP Secretariat, Department ofEarth Sciences)

    By Rowena C. Duckworth

    The Ocean Drilling Program (ODP) is the largest international geoscience project in the world, and the state-of-the-art drill ship, the JOIDES Resolution, is permanently at sea. Each year there are s

    Jan 1, 1995

  • AUSIMM
    Oxygen Leaching of Copper-Lead Matte in Acidic Chloride/Sulphate Solutions

    By Ricketts N. J, Smith G. D J

    A hydrometallurgical process was developed for recovery of copper from copper-lead matte formed as an intermediate product at the BHAS lead smelter at Port Pirie. A plant utilizing this process was

    Jan 1, 1987

  • AUSIMM
    Some Notes on Diamond Drilling Practice at Mount Isa

    The Black Star lead and zinc ore-bodies, situated in the western zone of mineralisation at Mount Isa occupy an area 2000 ft. long with varying widths from 100 ft. to 300 ft. The strike is N5°W, a

    Jan 1, 1932

  • AUSIMM
    Appin Colliery Belt Drift Fire

    By Fisher AEJ

    On Sunday morning 7th November, 1976, at approximately 2-25 a.m., smoke was discovered issuing from the 1912 m long belt drift at Appin Colliery. A Clouth steel cord rubber belt approximately 940 m

    Jan 1, 1981

  • AUSIMM
    Study of Wave Formation in a High Strength Bottom Injected Metallurgical Vessel

    By R H. Eric

    Surface wave formation induced by a high-strength submerged jet in a bottom blown metallurgical vessels has been studied experimentally by using one-seventh water model of CLU (Creusot-Loire Uddeholm)

    Jan 1, 2000

  • AUSIMM
    Inpit Crushing System the Future Mining Option

    In-pit crushing systems have been known in the mining industry for many decades. The question whether in-pit crushing is a viable option has often been asked. More than 200 mobile and semi mobile crus

    Jan 1, 2003

  • AUSIMM
    The use of High-Pressure, Water-Hydraulic (Hydropower) Technology in South African Narrow-Reef, Hard-Rock Mines

    By P D. Fraser

    This paper examines the new water-hydraulic (hydro powered) drill rigs that have been developed and proven in the last decade primarily in tabular, shallow-dipping, narrow-reef, hard-rock South Africa

    Mar 26, 2012

  • AUSIMM
    An Advance Load-Haul-Dump Vehicle-A New Concept In Underground Mining Machinery

    By Eaton R. A

    The design of most underground mining machines shows little evidence of regard for ergonomic principles and operator comfort. Likewise, efficiency and ease of operation often appear to have been g

    Jan 1, 1987

  • AUSIMM
    Crushing and Screening Operations at Bougainville Copper Limited

    By Koginmo V. I

    The concentrator at Bougainville Copper Limited has an annual throughput of 48.2 million tonnes/year producing approximately 175,000 tonnes copper, 16.1 tonnes gold, and 50 tonnes silver. Convention

    Jan 1, 1988

  • AUSIMM
    Celestite Ore Upgrading - From Laboratory to Mill

    By Joussemet R, Fabre F

    The paragenesis of the Escuzar Mine (Andalusia-Spain) comprises: ò major constituents: celestite and carbonated minerals (abundant calcite and less frequent strontianite). ò minor constituents: sulph

    Jan 1, 1993

  • AUSIMM
    Murray Basin Ilmenite ù Realising the Value

    By T J. Scanlon

    Heavy minerals recovered from recently discovered deposits in the Murray Basin are proving to be somewhat more difficult to process into saleable ilmenite products than ilmenites from existing operati

    Jan 1, 2001

  • AUSIMM
    Alumina Inclusion Removal from a Stirred Steel Ladle: An Experimental Study

    A major problem in the continuous casting of aluminium killed strip steel is the incidence of black and grey lines in the strip surface caused by the alumina inclusions. One place for limiting the

    Jan 1, 1984