Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Hybrid Life Cycle Assessment and Geographical Information System Model for Sustainable Recycled Aggregate Chain Management in Turin (Italy)By E Garbarino, P Molina, V Badino
Given the ever increasing quantity of construction and demolition waste (C&DW), one of the most challenging issues presently facing policymakers and public administrators in Italy concerns how to
Jan 1, 2009
-
Lime magnetite pellets – an alternative iron ore feedstock for lower carbon footprint ironmakingBy M I. Pownceby, M A. Rhamdhani, S Purohit, G Brooks
The current practice of magnetite ore agglomeration involves high temperature oxidation roasting (typically at 1200–1350°C) of magnetite to hematite phase in order to improve the strength and reducibi
Nov 8, 2021
-
Mining–Community Conflicts – Can the Future Mining Sector Transform Social Responsibility?By J Fraser, M Scoble
Within the past decade, incidents of mining–community conflicts have grown dramatically and represent one aspect of a phenomenon known as social risk. Research published in 2014 indicates that a lack
Nov 4, 2015
-
Challenges facing non-ferrous metal productionBy P Taskinen, D Lindberg
The increase in metals demand in the electrifying globe means significant growth in the smelting of copper, nickel, zinc, and lead, produced from primary sulfide sources or using sulfide mattes as the
Aug 21, 2024
-
A New Method for Sampling from High Capacity ScreensBy B W. Atkinson
Full-stream mechanised sampling apparatus, that collect a full cross-sectional increment from the complete screen discharge, will always be the preferred option for sampling screen overflows. However,
Aug 21, 2012
-
Inclined Troughed Belt Conveyor Systems for Underground Mass Mining OperationsBy A G. L Pratt
Inclined troughed belt conveyors are more frequently being selected from a range of alternatives, which include shafts and trucks for ore haulage in underground mass mining projects. Belt conveyor hau
Jan 1, 2008
-
Understanding minerals in mineral processing – the basics and beyondBy E M. Wightman, C L. Evans
A recent survey of mineral processors undertaken as part of the International Mineral Processing Council (IMPC) Education Commission identified mineralogy as one of the key skills required for mineral
Aug 29, 2018
-
Geotechnical Challenges and Requirements for the Subsurface Development: The Case History of the Brasilia MetroSubsurface development requires some geotechnical conditions and challenges. Most of then are related to the compatibility between tunnelling system and surrounded ground conditions, and design criter
Jan 1, 1999
-
A new sampler for grain and other free-flowing particulatesBy G J. Lyman
Sampling of grain for mycotoxins is challenging in that some mycotoxins, such as Ochratoxin A (OTA), have very low permitted levels and the kernels carrying the mycotoxin may be highly localised withi
May 9, 2017
-
A deep learning based approach for roof bolt recognition in 3D point cloud of underground minesBy B P. Banerjee, D Patra, S Raval
Roof bolts are an essential component of roof support systems in underground mines. They are used to provide structural support to the roof of the mine and prevent it from collapsing. Therefore, it is
Sep 1, 2024
-
Slope radar monitoring – a partnership and infrastructure case study of scalability, reliability and availabilityBy E Shilov, R Dixon, L Tovey
BHP Western Australian Iron Ore (WAIO) operations use a suite of slope monitoring systems which are deployed to operational areas based on the ground control risk. Slope Radars are one system used wit
Nov 29, 2022
-
Learning about SafetyBy V Seedwell, P H. McGuckin
The Broken Hill Proprietary Company Limited (BHP), started as a silver-lead- zinc mining company in Broken Hill, New South Wales, Australia in the 1880s. Since then it has diversified into the resourc
Jan 1, 1998
-
The Future of Australia’s Mineral Wealth – Leasing to Support an Ageing PopulationBy K Morrison
Australia’s ageing population means that by 2050 there will be 2.7 people of working age to support each Australian aged 65 years and over compared with five working people per retiree today and compa
Nov 22, 2011
-
Towards a model-informed process control strategy for coal flotation in a Jameson CellBy A J. Morrison, M Yahyaei, J S. Siong, J Wang, K Runge
The flotation cells used to upgrade ultrafine metallurgical coal (-250 µm) are usually poorly controlled leading to unnecessary loss of combustibles from the flotation system. This is mainly because c
Aug 24, 2022
-
Impartiality and Fairness in Stakeholder Engagement Through Triangular Value AnalysisBy J L. Stacey
The diverse priorities, drivers and concerns of multiple stakeholders in the minerals industry complicate the integration of sustainable development considerations into mine design, as well as operati
Jan 1, 2009
-
The hidden path to sustainable mining – an incentive for transforming scope 3 emissions across industriesBy K Sherry, N Shahbazi
Scope 3 emissions are a set of often overlooked indirect greenhouse gas emissions within a company’s value chain and represent the majority of emissions for many sectors. These emissions arise from ac
Sep 1, 2024
-
Mine Life Cycle Planning – Creating Lasting Value for CommunitiesBy S Robertson, I Buitrago
Mine life cycle planning and enduring value are taking centre stage to meet corporate goals and deliver socio-economic outcomes for communities over the life of a mine. There is a general agreement in
Jul 16, 2014
-
Groundwater modelling support for closure approvals at Ranger Uranium MineBy J Sigda, T Jones, D Staggs, J Ewing, C Cheng, J Pickens, S Paulka
Mine-derived solutes from Energy Resources of Australia’s (ERA’s) Ranger uranium mine have been closely monitored for decades. Ranger is surrounded by the Northern Territory’s Kakadu National Park and
Jul 1, 2021
-
Ambuklao Tunnel Plug ConstructionBy B Hayes
The Ambuklao and Binga Rehabilitation Project is a 175 MW hydro power project currently under construction across dual sites in the north region of Luzon Island, Philippines. When it was built in 1956
Mar 8, 2011
-
Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?By G Hancock, A Kemp, I Taylor
The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T
Jul 16, 2014