Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    BHP and management standard: a global approach to reducing geochemical risk and minimising closure uncertainties

    By J Heyes, T Cooper, M Stimpfl, R Staines, J P. Pearce

    Acid and Metalliferous Drainage (AMD) is one of the key risks facing the mining industry worldwide. If not properly managed and/or not identified in a timely manner, AMD has the potential to decrease

    Jul 1, 2021

  • AUSIMM
    A Novel Blasting Technique to Create Drawbells and Eliminate the Undercut Level in Block Cave Mining

    By A Tawadrous, D S. Preece

    Cave mining is of interest to the mining community as it offers a chance to extract large, deep orebodies with low operating costs and high production rates. It allows for extracting large low-grade o

    Aug 24, 2015

  • AUSIMM
    Maximising the value of Rio Tinto’s Yandicoogina orebody – a mine geology perspective

    By A Kleinitz, J Halilovic, K Trappitt

    Mine operators use grade control to determine the destination of each block of material in the mine. In polymetallic mines, grades are best expressed in dollars: the Net Smelter Return, NSR, per tonne

    Mar 22, 2022

  • AUSIMM
    Operating Performance of the Phu Kham IsaMill™

    By G Harbort, D Zoetbrood

    "The Phu Kham copper-gold operation in the Laos People’s Democratic Republic (PDR) is owned and operated by Phu Bia Mining Limited. PanAust Limited holds a 90 per cent interest in Phu Bia Mining Limit

    Oct 10, 2016

  • AUSIMM
    Keeping up with the Joneses – the value of industry surveys and benchmarking

    By T D. H McGrath, W P. Staunton

    Benchmarking, comparing an operation or process with the industry standard, is known to be a useful method for identifying plant optimisation opportunities, and in many cases providing the pathway to

    Aug 29, 2018

  • AUSIMM
    Water Quality Compliance Monitoring at Macraes Gold Mine: A New Perspective

    Planning for the Macraes Extension project highlighted the need for additional tailings storage availability. The possible solution of developing new tailings impoundments in Northern Gully, in tum, l

    Jan 1, 1993

  • AUSIMM
    Single pass drill, install and inject self-drilling resin bolt application in poor ground

    By T Roberts, D Faulkner, G Watt

    Traditional mechanised resin rock bolting in hard rock underground mines requires the installation of resin capsules into a pre-drilled hole prior to the rock bolt being spun into a hole to mix the re

    Nov 30, 2018

  • AUSIMM
    The Impact of Gravity Gold Recovery at Kalgoorlie Consolidated Gold Mines

    By D Hillier, A Giblett, K Parker, V Ramsell

    Kalgoorlie Consolidation Gold Mines (KCGM) operates the Kalgoorlie Super Pit open cut, Mt Charlotte underground mine, Fimiston process plant and Gidji Roaster facility for joint venture partners Newmo

    Oct 29, 2012

  • AUSIMM
    Meta incident analysis – an analysis of incident and near miss reporting within a major Australian commodity port

    By A Fern, A Hawkes, o, W Smith, K Mee

    Serious Injury and Fatality (SIF) prevention remains a priority focus within high-risk industries sector. A major mining operation sought to strengthen their approach to the management of high-risk ac

    Apr 16, 2024

  • AUSIMM
    Modelling Full-scale Blast Heave with Three-dimensional Distinct Elements and Parallel Processing

    By A Tawadrous, B Wheeler, D S. Preece, S A. Silling

    The two key results of rock blasting are fragmentation and movement of geomaterials. Movement/flow of the blasted rock is often referred to as heave. Moving rock with explosives rather than mechanical

    Aug 24, 2015

  • AUSIMM
    Robust Decision Making û Application to Mine Planning Under Price Uncertainty

    By F Grobler

    Many projects fail because project performance in unfavourable economic conditions was not anticipated at the investment decision stage. This type of failure may have been avoided through the selectio

    Sep 26, 2011

  • AUSIMM
    Particle Density Meter

    By R Nicholson, N D. Cox, N W. A Lambert

    "This paper reports on the long-term operation of a particle density meter (PDM) at the Bloomfield coal handling and preparation plant (CHPP). This unit has been operating continuously for over three

    Oct 10, 2016

  • AUSIMM
    Benefits Related to Applications of a Mass Blast in Open Cut Mining

    By C Muñoz, N Ortega, J Vergara, D Avilés

    Mass blasts have been the subject of extensive studies because of their potential benefits in mining operations. However, it has not been possible to advance due to the paradigm that states that the b

    Aug 24, 2015

  • AUSIMM
    MEMS – The Mine Event Management System: a process to assist with incident management

    By B Stewart

    It has long been recognised that knowledge of the conditions existing in a mine after an incident is essential in deciding whether to deploy responders as part of the incident recovery process. Applyi

    Apr 16, 2024

  • AUSIMM
    Nova-Bollinger reconciliation and risk

    By C Laming, P M. Hetherington, F A. Pym, M P. Murphy, K E. Crook

    Reconciliation is a powerful tool used by mining operations to compare the mass and grade of ore produced with what was estimated before mining. The primary objective of reconciliation is to verify th

    Mar 22, 2022

  • AUSIMM
    The Integration of a Due Diligence Process into a Mining Operation

    A mining operation can be identified as demonstrating prudent management when a number of vital characteristics are evident.All risks and opportunities that are critical to the on-going success of the

    Jan 1, 1998

  • AUSIMM
    Evaluating rheological features inside tumbling mills using DEM data previously validated against PEPT measurements

    By I Govender, T L. Moodley

    Tumbling mills are grossly inefficient, using only 5 per cent of the total energy supplied for actual breakage. A significant proportion of this inefficiency is unavoidable owing to geometric limitati

    Aug 24, 2022

  • AUSIMM
    Theoretical and experimental approaches to determine the mass transfer coefficient in the steel/slag/refractory system

    By S K. Michelic, M Schickbichler, A Kharicha, E Karimi-Sibaki

    The requirements for the controllability of metallurgical processes are increasingly becoming the focus of both industry and research. Advances in this field of research not only impact the stability

    Aug 21, 2024

  • AUSIMM
    Evaluation of Underground Mining Options at Xstrata Copper's Ernest Henry Copper-Gold Mine

    By P Christen, D R. Ashley, G R. Power

    The Ernest Henry Mine is currently a copper-gold open pit operation situated in north-west Queensland, Australia. It is owned and operated by Xstrata Copper with a current throughput of 11 million ton

    Jan 1, 2009

  • AUSIMM
    Characterisation of Bedded and Channel Iron Ore Deposits Using CSIRO’s HyLogging™ Systems

    By M Haest

    This study demonstrates the application of HyLogging™ technologies for mineralogical characterisation of different iron ore types throughout the Hamersley Province (Western Australia), including a cha

    Jul 11, 2011