Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Urban Tunnelling Challenges - Mechanised Tunnelling to Improve Life Quality in CitiesBy U Rehm
The biggest hard rock double-shield tunnel boring machine (TBM) in the world, with a diameter of 12.4 m, is currently excavating the North-South Bypass, which includes a crossing under the Brisbane Ri
Jan 1, 2008
-
Modern Mining GeologyBy G Fahey, S Rose
"Mining geology as a defined profession is only about 100 years old. The successful modern mine geologist needs to be a multidisciplinarian, but also needs to maintain a focus on the key outputs of th
Aug 18, 2014
-
Water balance management 101By M Rafty, C Lane
Managing water is a key aspect of mining, whether a site is in water surplus or water deficit. Water in tailings storage facilities (TSFs) needs to be managed carefully to maximise the density of the
Jul 23, 2018
-
Deck hands needed! Experience necessary – addressing the impending qualified tailings professional resource shortageBy K J. Ward, C N. Hatton, J Scalia IV, C A. Bareither, D L. Spencer
The mining industry is experiencing change in the governance of tailings facilities (TFs). Guidance and regulations across many jurisdictions contribute to this amorphous change. The Canadian Dam Asso
Jul 1, 2021
-
From Mt Goldsworthy to Area C ù Reflections on Forty Years of Iron Ore Exploration in the PilbaraBy D A. Kepert, I J. Tehnas, M A. Pudovsk
BHP Billiton (BHPB) was the first company to start iron ore mining in the Pilbara at Mt Goldsworthy in 1966 through Goldsworthy Mining Limited (GML - then Consolidated Goldfields Australia, Cyprus Min
Jan 1, 2002
-
Managing mining fatality riskBy P Nissen, T Jenke, M Ralph, M Cattani, M Quinlan
The West Australian Government hold an annual ‘Mines Safety Roadshow’ around the State’s regions and the capital city, Perth. Each year presenters provide an update on legislation and safetyrelated th
Apr 16, 2024
-
Challenges in Developing Integrated Process Models Based on Industrial Survey DataBy M Yahyaei, F Vos, J Siliezar
Site-based case studies (including data collected from industrial surveys) and their application in evaluating circuit performance, have a significant role in developing reliable process models. Such
Sep 1, 2014
-
Wear Materials Experience in Mount Isa ConcentratorsBy Burton E, Eaton R
The incentive to improve wear resistant materials performance is examined with respect to plant availability and recent trends in the labour force. Standard practice at Isa Mine Concentrat- ors in c
Jan 1, 1978
-
The Design and Installation of a Booster Fan at Tahmoor CollieryBy M Ogle
"Booster fans are relatively rare in Australian coal mines. However, as mines become progressivelydeeper it is likely that such fans will be increasingly adopted as a method to sustain or improve the
Jun 1, 2012
-
Liberation characteristics of comminuted ore types of the Per Geijer iron-oxide apatite depositsBy T Seifert, P Krolop, K Niiranen, S Gilbricht
The Per Geijer iron oxide apatite deposits (IOA) display significant potential mineral resources for Luossavaara-Kiirunavaara AB (publ), known as LKAB. LKAB continuously mines magnetite/hematite ores
Nov 8, 2021
-
Driving Future Tunnels with Mechanical or Explosion Energy - A Blasting Engineer's ViewThe current drill-and-blast method of tunnelling is cyclic and, for this reason above all others, has a future application potential which is lower than that of continuous methods. There is scope
Jan 1, 1987
-
The Miner's Guide to a Better Environmental PerformanceBy G MORRIS
The mining industry has been rightly proud of its environmental achievements and it would be fair to say that in some areas the Australian mining industry is at the forefront of world practice in e
Jan 1, 1992
-
Successful Management of Mining Companies ù What Have We Learned From the 16th Century to the 21st Century?This short paper outlines the authorÆs views regarding the progress we have made as an industry in managing mining assets over the past 500 years. It represents a personal view û but one founded in fa
Jan 1, 2004
-
Mining Education ù Driven by Global ImpactsBy P J. McCarthy
Globalisation and consolidation is resulting in the mining industry coming to be dominated by a small number of very large companies seeking to lever assets and knowledge to create wealth. As an impor
Jan 1, 2001
-
Design, Commissioning and Operation of Elura's Larox Pressure FiltersBy Jagger ND
Pressure filters were found to be necessary to produce Elura silver/lead and zinc concentrates at sufficiently low moisture contents for bulk cargo shipment by sea to smelters.The difficulty in obtain
Jan 1, 1985
-
SBRE framework – application to Olympic Dam depositBy D Clarke, I Minniakhmetov
This paper describes the application of the SBRE framework to model the Olympic Dam deposit, one of the largest copper and uranium deposits in the world. Geostatistical simulations are the best practi
May 24, 2023
-
A Carpenter’s Journey through Forty Years of Underground Mining, Leaders and LeadingBy J Nixon
I have to say that my story is not too much different to many others who grew up and worked in the great mining fields like Broken Hill, Mt Isa, Rosebery, Kalgoorlie or Kambalda and any one of them co
Mar 21, 2011
-
Recognising and Integrating Stakeholder Landform Expectations into Life-of-mine PlanningBy P D. Erskine, A Hine
The current Queensland Government’s rehabilitation guidelines for post-mining landforms present a hierarchy of preferred outcomes for different areas within the mine site (see Figure 1). Within all ar
Jun 28, 2016
-
"Development of a Real-Time Fleet Cost Tool as Part of an Integrated Remote Mine Control Centre of an Integrated Remote Mine Control Centre"By S D. Dessureault
In large coal strip mines, there are many different processes at work: stripping, overburden removal using trucks/shovels, cast blasting, slot dozer pushing, more fragmentation and further truck/shove
Sep 26, 2011
-
Cape Lambert Port B Shiploading, Sampling and AnalysisBy M Graham, R Brunning, C Andringa-Bate, S Westergren
In 2010, Rio Tinto Iron Ore’s operations commenced the planning and design of a sampling and analysis system for the new 50 Mt/a Cape Lambert Port B (CLB) facility. Current sampling systems at the por
Jul 29, 2014