Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Application of Design Concepts and Engineering Controls Necessary to Deliver Well-designed and Rehabilitated LandformsBy T Leidich, M Van Zyl, H Lacy
Mining ‘as usual’, until the most recent decades has resulted in limited landform planning and a general lack of mine waste landform design. Material characterisation, mine planning and dedicated prof
Jul 16, 2014
-
Colliery Planning on a Mini ComputerBy Davies L, Jeffreys J
The Broken Hill Proprietary Company Limited (BHP) has been successfully using mini computers in its open cut strip and pit coal planning for the past six years. A recent development within the compute
Jan 1, 1982
-
Calculation of Rope Life in Mine Hoisting ApplicationsAn established method exists for the computation of rope lifetimes for shaft hoisting applications in the mining industry. In an earlier study, during the 1990s, an initial comparison of the calculate
Jan 1, 2005
-
Post Closure Management of the Mt Leyshon Gold Mine - Water the IntegratorBy T Baumgartl, D Mulligan, R Haymont
Mining at the Mt Leyshon Gold Mine in semi-arid north Queensland stopped in 2002. Newmont Australia has recently initiated a thorough post-closure water management study of the site by revisiting the
Jan 1, 2006
-
Sodium Removal from Heat and Leach Process Treated Zircon SandsBy K J. McDonald
All commercially available zircon sands contain radioactivity sourcing from the decay of trace amounts of contained uranium (U) and thorium (Th). The fine particle size zircons of the Horsham area in
Jan 1, 2001
-
Ausenco Carbon Reactivation Design CriteriaBy D Preedy, J K. Claflin, S R. J La Brooy
This paper summarises the lessons learned during a recent carbon reactivation kiln upgrade project at the Sukari Gold Mine in Egypt. The kiln is being replaced to ensure that the plant achieves full v
Sep 26, 2013
-
Application of SLon Magnetic Separators in Modernising the An Shan Oxidised Iron Ore Processing IndustryThe An Shan iron ore deposit is the biggest low-grade oxidised iron deposit in China. Over the past ten years, about 120 SLon verticalring-pulsating high gradient magnetic separators units have been i
Jan 1, 2009
-
Dynamic Pit and Waste Dump Schedule Optimisation at Tropicana Gold MineBy S Graskoski, S Craig, C Myburgh
Too often in mine planning, maximising revenue-generating material takes precedence over minimising costs. The ability to target both revenue and cost optimisation enables mine plans to fulfil corpora
Sep 26, 2013
-
A Four-Dimensional Interactive Learning System Approach to Mining Engineering EducationBy S Saydam
Professional engineers need to be able to apply university learning to practice. In particular, they have to take responsibility for interactions between technical systems and the complex social envir
Nov 22, 2011
-
A new approach to implement quality assurance and quality control to technological innovations – quality of spectral data capture and processes in the minerals industryBy M Haest, O Dominguez, D Mittrup
Technological innovations and emerging analytical capabilities are transforming the way drill samples are analysed, with real-time mineralogical analysis made possible. In addition, new business/techn
May 9, 2017
-
Hot water management at PT Nusa Halmahera Minerals’ Toguraci MineBy J Isles, S King, A Valenza, R Lawolo, J Evert
PT Nusa Halmahera Minerals (PT NHM) is an Indonesian joint venture company owned by a subsidiary of Newcrest Mining Limited (75 per cent) and PT Aneka Tambang (Persero) (25 per cent). PT NHM operates
Oct 16, 2017
-
The Use of Evaluation Surfaces to Assist in the Determination of Mine Design CriteriaOne of the problems with mining projects is the setting of the design criteria that will best match the requirements. Normally this is expressed in economic terms but can be other factors. With massiv
Jan 1, 2000
-
The Challenger Gold MineBy M Sandy, P Bamford
The Challenger Gold deposit was discovered in 1995 by Dominion Mining Ltd in a remote western area of the Gawler Craton in South Australia. Mine development commenced in 2002 with initial production f
Jan 1, 2008
-
Scenario-based Project Evaluation – Full Mineral Value Chain Stochastic Simulation to Evaluate Development and Operational AlternativesBy S Coward, S Jackson, S Moayer, J E. Vann
The variability and uncertainty of mineralisation, coupled with subsequent uncertainty in mining and processing, is often paid scant regard or overlooked during the evaluation of mining projects. In m
Aug 18, 2014
-
Engaging Society about a Potential Mining Future – Concerns and ExpectationsBy N Boughen
This paper synthesises the findings of five studies undertaken by the CSIRO Wealth from Oceans Flagship in 2009-10. This research explores the concerns, expectations, and information needs of a range
Nov 22, 2011
-
Nova copper-nickel project optimisation of the copper rougher-scavenger circuit through advanced measurement and controlBy M Thompson, N Vines, Z Hearne, S Lam, G A. Gomes-Sebastiaõ, D van der Spuy
Construction and commissioning of the Nova Copper-Nickel project of Independence Group was completed in late 2016. The plant is in the Fraser Range of Western Australia, about 120km east of Norseman a
Aug 29, 2018
-
The use of Geometallurgy to Estimate Comminution Parameters within Porphyry Copper DepositsBy G J. Harbort, K Lam, C Sola
The relationship between the geology of porphyry copper deposits and their processing performance is an area of interest. Being able to predict comminution properties of the ore from physical characte
Sep 29, 2013
-
Oxygen Demand Testing ù A New Laboratory ProcedureBy S Brown
With oxygen conditioning routinely used in both the lead and zinc circuits at Pasminco Elura Mine a more sophisticated method of determining oxygen demand was required. It is known that different ore
Jan 1, 2000
-
Condition Monitoring at ERA - Ranger MineBy J A Evans
A well-maintained and low cost mining operation today requires the use of condition monitoring techniques. At ERA - Ranger Mine oil analysis, vibration monitoring, infra-red themtography, and perfor
Jan 1, 1994
-
NO2:NOx Ratios in Australian Road TunnelsBy P Gehrke, S O’Gorman
The precise measurement of NO2 was historically difficult in road tunnels, hence criteria and design analysis was based on converting from NOx concentrations via a set NO2:NOx ratio. The reliable dire
Sep 17, 2014