Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Computational Modelling of Conveyor Belt Fires in Mine Galleries

    By D Giddings, S A. Silvester, S Pickerin

    Underground fires represent a constant threat to the safety of underground personnel. Miners in the immediate vicinity may face intense heat, blinding smoke, toxic fumes, fall of ground and other dire

    Jan 1, 2005

  • AUSIMM
    Upgrading Sishen Iron Ore Slimes by Reverse Cationic Flotation

    By A Giyose, V Malysiak, K Davey

    Batch flotation tests were conducted on a haematite-bearing Sishen iron ore slimes sample from South Africa using reverse cationic flotation. The effect of grinding on flotation performance, the flota

    Jan 1, 2009

  • AUSIMM
    Multivariate Block Simulations of a Lateritic-type Nickel Deposit and Post-processing of a Representative Subset

    By J Deraisme, P Epinoux, O Bertoli

    "Société le Nickel exploits the Dôme lateritic nickel orebody at its Tiébaghi operations in New Caledonia. The site geology has an obvious bearing on recovery and metallurgical performance, with contr

    Nov 24, 2014

  • AUSIMM
    Using Life Cycle Analysis to Assess the Toxicity Impacts of Waste Streams from Metal Production Processes

    By N Haque

    Base metal ores contain low levels of toxic/hazardous elements such as arsenic, antimony, bismuth, cadmium, lead and mercury. Given the large tonnage of base metal ores mined and processed each year g

    Jan 1, 2009

  • AUSIMM
    A Collaborative Approach to Iron Ore Beneficiation at Assmang Khumani Processing Plant

    By S Döpp

    Commencing with early experiences in iron ore beneficiation made at Beeshoek Mine, the paper follows through the process of extensive mineralogical and metallurgical investigations carried out during

    Jul 11, 2011

  • AUSIMM
    A 3D Discrete Event Simulation Model of a Truck-shovel Network System

    By W Zeng, D Walker, D Cai, E Baafi

    "The efficiency of the truck-shovel haulage system is significantly influenced by the truck fleet size. A discrete event simulation model with 3D animation has been developed to estimate the productiv

    Nov 15, 2016

  • AUSIMM
    Geometallurgy – Bridging the Gap between Mine and Mill: a Case Study of the DeGrussa Geometallurgy Program

    By S Robinson, A Turner, R Dale, C Butler

    "Sandfire Resources NL- (‘Sandfire’) DeGrussa definitive feasibility study (DFS) identified geometallurgy as a major factor in achieving optimum plant performance at the DeGrussa mine. A geometallurgi

    Jun 15, 2016

  • AUSIMM
    Energy Efficiency Assessments in Design – Seminal Decisions and Effective Processes

    By M Allen

    Energetics has been in the business of climate change for more than twenty years. This experience has only served to cement the understanding that decisions taken during design define the environmenta

    Aug 8, 2011

  • AUSIMM
    Understanding and modelling squeezing ground conditions at the Ballarat Gold Mine

    By B Roache, A Vakili, R Talebi

    When a highly anisotropic or weak rock mass is subjected to high-stress conditions, it can lead to large ongoing deformations or squeezing ground conditions. Squeezing ground conditions can impose inc

    Nov 30, 2018

  • AUSIMM
    Utilising mine planning to deliver closure landforms through productive movement

    By M Bettison, R Wright, N Taylor

    The primary mine planning focus during early study phases of future mining projects is Life of Asset ore production and grade quality, this will always be the situation. While waste schedule optimisat

    Jul 25, 2018

  • AUSIMM
    Preconditioning Modelling and Explosives Effectiveness in Block Caving

    By P González, J Videla, E Córdova, I Gottreux

    Currently, underground mining of deeper massive deposits with lower grades, harder rock conditions in high strength environments, entails difficulties in caving, fragmentation and seismicity of the or

    May 9, 2016

  • AUSIMM
    Integration of a Microseismic Monitoring System in Mining the Pasminco Broken Hill Southern Cross Area

    By K P. Tully

    In August 1996 a Microseismic Monitoring System developed by ISS International Limited was installed at the Pasminco Broken Hill Mine -Southern Cross area. The project aims were to:Assist in daily saf

    Jan 1, 1998

  • AUSIMM
    Modelling of liquid/liquid interface movement during spindle rotation of refractory – slag corrosion test

    By Y Chung, B Choi, H Lee

    Numerous studies have explored refractory corrosion in the presence of slag and/or metal, utilising the Finger Rotating Test (FRT). Recent experimental results revealed that corrosion initially increa

    Jun 19, 2024

  • AUSIMM
    The application of critical chain project management to sublevel open stoping at Olympic Dam

    By J Light

    Since 2019, the mine planning team at Olympic Dam has been establishing and maturing a shift from deterministic to probabilistic scheduling techniques. This paper outlines this journey undertaken by t

    Mar 29, 2023

  • AUSIMM
    The Relationship between Blasting Parameters and Muck Pile Configuration

    By D Van Doorselaere

    The purpose of blasting during mining is to produce a muck pile that can be efficiently loaded and transported. There is an increasing awareness of the variation in muck pile characteristics and its e

    Aug 24, 2015

  • AUSIMM
    Assessment of Robertson (2010a) CPTu state parameter inversion method within Been et al. (1987) CPTu inversion parameter framework

    By K Smith

    This paper presents an assessment of the Robertson (2010a) method within the CPTu inversion parameter framework of Been et al. (1987), using CPTu calibration chamber data presented by Jefferies and Be

    Jul 1, 2021

  • AUSIMM
    Chirano Gold Mine Expansion – A Case Study

    By S Ellis

    In January 2008 Chirano Gold Mines Limited committed to expansion of the Chirano Gold Project from its existing design capacity of 2 Mtpa ROM ore to a new design value of 3.5 Mtpa. In addition to incr

    Aug 8, 2011

  • AUSIMM
    HRC™ HPGR as an energy efficient alternative to horizontal mills in the iron ore processing circuit

    By E Nunes, R Mendes, D Jacobson, G Cota, T Machado, E Santos, J Almeida, E Pereira9, B Raso

    Grinding circuits are known to be the highest consumer of energy used in the ore comminution process, with high operational costs and sensitivity to ore conditions. The mining industry is being encour

    Sep 18, 2023

  • AUSIMM
    Mine Ventilation Model Validation - ItÆs not Rocket Science!

    By J Rowland

    "Ventilation models are invaluable tools for both prediction of routine daily ventilation changesin an operating mine to circuit performance expectations at the mine in 20 yearsÆ time. Arguably ventil

    Jun 1, 2012

  • AUSIMM
    Low-Temperature Roasting of Ilmenite ù Phase Chemistry and Applications

    By C Li

    Removal of gangue minerals from ilmenite concentrates can be accomplished by relatively low temperature roasting in controlled gas atmospheres to selectively enhance the magnetic separation characteri

    Jan 1, 2001