Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Engineering the New Olympic Dam Backfill System

    By A G. Grice

    WMC Resources Pty Ltd û Copper Uranium Division operates the large underground Olympic Dam Mine at Roxby Downs, South Australia. These operations mine and process the ore to produce refined copper, ur

    Jan 1, 2000

  • AUSIMM
    3D estimation of variables with complexity in cross-correlation structures

    By N Madani

    Linear interpolation of geo-related variables is important to different aspects of mining engineering such as long and short-term mine planning. The ore deposit description attained from spatial model

    Nov 21, 2018

  • AUSIMM
    Lump Ore Characteristics and their Impact on Blast Furnace Operation

    By S Hapugoda, A Edenton, M Adam, R J. Holmes, J R. Manuel, R Smyth

    Lump ore is one of the key ferrous feeds used in the blast furnace ironmaking process, normally accounting for ten to 20 per cent of the blast furnace burden. Like other feeds, the characteristics of

    Jan 1, 2009

  • AUSIMM
    New Development of Cemented Fill in Various Chinese Metal Mines (9895d297-773f-45f4-91bd-48419c188988)

    By Cai S, Zhou C

    The requirement of mineral resources is increasing as the economy is continually increasing in China. The mining practices of various complex sulphide deposits and precious metal deposits, and the t

    Jan 1, 1998

  • AUSIMM
    A Case Study in Optimising Fragmentation

    By R Crookes

    Mine to Mill optimisation is not a recently developed concept. It is one which is finally gaining greater acceptance in the Australian Mining Industry, possibly as a consequence of the downturn in mar

    Jan 1, 2000

  • AUSIMM
    Production of Self-Fluxed Pellets and Improvement of Quality

    By Hanaoka K, Ikeda K

    Kakogawa Works, Kobe Steel, Ltd. has two pelletizing plants and one sintering plant, and the blast furnaces have been operated with 30 - 50% pellets. At Kakogawa Works, various improvements in pell

    Jan 1, 1980

  • AUSIMM
    Modelling and Design of Block Caving at Bingham Canyon

    Open pit mining at Bingham Canyon commenced in 1904 and about two billion tonnes of ore have been extracted since then. There remain just under one billion tonnes of ore in the pit and this will be mi

    Jan 1, 2000

  • AUSIMM
    Current Practice at the C.S.A. Mine Concentrator, Cobar

    By King CJ

    The C.S.A. concentrator of Cobar Mines Proprietary Limited was expanded in 1974 to treat 80 000 tonnes of copper-lead-zinc ore per four week period. Jaw crusher product is fed to two par- allel prim

    Jan 1, 1978

  • AUSIMM
    Recent Applications of High Efficiency Pneumatic Flotation Technology in Coal and Minerals

    By D Ziaja, W Jaspers

    A brief history of the development of pneumatic flotation cells from early in the 20th century to the present day and a comparison to conventional cells demonstrates the efficiency and simplicity of d

    Jan 1, 2005

  • AUSIMM
    Methods of Increasing Production in A Travelling Grate Pellet Plant Limited by Drying Capacity

    By Thomas CG, Armstrong GJ, Lynch KS

    A small glass walled pot grate has been used to simulate drying of iron ore pellets in a travelling grate plant. This equipment has enabled the effect of decreasing grind and de- creasing pellet bu

    Jan 1, 1972

  • AUSIMM
    Knelson Concentrators Extreme Gravity

    The concept of Extreme Gravity is the latest in a series of innovations that has seen a re-introduction of gravity recovery systems into the milling operations of most gold mines. Traditionally, most

    Jan 1, 2000

  • AUSIMM
    The Critical Path to Automated Underground Mining

    By P McCarthy

    Despite significant advances in the platform technologies that could form part of a system of mine automation, the goal of full automation in most underground mining applications remains distant. This

    Jan 1, 2008

  • AUSIMM
    Direct Chill Casting of Aluminium at Comalco, Bell Bay

    Comalco's Bell Bay smelter produces some 94 000 t.p.a. of primary aluminium in the form of foundry alloys, extrusion billet and rolling blocks. The extrusion billet and rolling block are produ

    Jan 1, 1977

  • AUSIMM
    Effects of Alternate Methods of Conditioning on the Reflotation of Copper Concentrates at WMC (Olympic Dam Operations)

    By P Heppner, J Schell, R Newell

    The effect of various methods of conditioning on subsequent flotation performance was reviewed, where complex interactions involving attrition, aggregation, dispersion and surface cleaning were discus

    Jan 1, 2000

  • AUSIMM
    Collector-Extender Flotation in the Processsing of Coarse Fractions of Potash Ores

    By Dai Q

    The mechanism of flotation of potash ores with long chain primary amines has been assessed. Since at high electrolyte concentration in saturated brine the electrical double layers of the interacting

    Jan 1, 1993

  • AUSIMM
    Doing the Right Things Right ù Identifying and Implementing the Mine Plan That Delivers the Corporate Goals

    By B Hall

    The authors have undertaken many independent mine optimisation and operational improvement projects at Australian and international mining operations over the past decade. This work has provided an un

    Jan 1, 2006

  • AUSIMM
    The Lochiel Trial Pit Design and Excavation

    By Sullivan T. D

    The Lochiel Deposit is a large occurrence of soft brown coal about 130 km north of Adelaide. The deposit is undergoing continued evalua- tion of which an integral part was the excavation of a Trial P

    Jan 1, 1988

  • AUSIMM
    The Role of Flash Flotation in Reducing Overgrinding of Nickel at WMCÆs Leinster Nickel Operation

    By J McQuie

    The concentrator at WMCÆs Leinster Nickel Operation has operated with flash flotation in the grinding circuit since the early 1990s. There has always been a positive correlation between flash flotatio

    Jan 1, 2005

  • AUSIMM
    Measuring Safety Management Effectiveness in the Australian Mining Industry

    A 1991 survey of 48 mining companies, employing more than 24 000 employees, showed that disabling injury and disease rates continue to be the most common measurements of safety management effectivness

    Jan 1, 1992

  • AUSIMM
    Optimisation of Reinforcement Design of Coal Mine Roadways

    By Fabjanczyk MW, Guy RJ, Tarrant GC

    The design of the reinforcement systems required to stabilise mine roadways has developed through the application of field measurement techniques. These techniques have allowed the level of securi

    Jan 1, 1992