Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    An Advance Load-Haul-Dump Vehicle-A New Concept In Underground Mining Machinery

    By Eaton R. A

    The design of most underground mining machines shows little evidence of regard for ergonomic principles and operator comfort. Likewise, efficiency and ease of operation often appear to have been g

    Jan 1, 1987

  • AUSIMM
    Murray Basin Ilmenite ù Realising the Value

    By T J. Scanlon

    Heavy minerals recovered from recently discovered deposits in the Murray Basin are proving to be somewhat more difficult to process into saleable ilmenite products than ilmenites from existing operati

    Jan 1, 2001

  • AUSIMM
    DuPont: A Pro-active Approach to Injury Reduction

    DuPont is a chemical and energy multi-national of approximately 90,000 employees. Often regarded as the world leader in injury reduction and process safety management, DuPont operate 140 manufacturing

    Jan 1, 1997

  • AUSIMM
    Plant Practice at the New Celebration Gold Mine

    By Martins V, Dunne R

    A re-evaluation of the Hampton Boulder prospect in the early eighties resulted in a decision to proceed with mine development in December 1985. A 500 000 tpa gold treatment plant was commissioned in D

    Jan 1, 1992

  • AUSIMM
    Fine Coal Flotation: A Mineral Processing Problem

    For some time fine coal (-0.5 mm) flot ation has been considered as a bulk flotation problem. Combinations of hydrocarbon oils and frothers have been used as surface active agents in coal flotation

    Jan 1, 1978

  • AUSIMM
    History and Present Operation of the Heavy Medium Separation Plant at Renison Limited, Tasmania

    In 1972, metallurgical testwork on Renison ore indicated a significant proportion of low specific gravity, tin-barren material ideally suited to heavy medium separation (HMS). Further technical an

    Jan 1, 1978

  • AUSIMM
    Review of Seam Gas Drainage in Australia

    By Lunarzewski L

    Gas problems, largely instantaneous outbursts of coal and gas, arose in the early days of coal mining in Australia, leading to attempts at predrainage often including destressing. With deeper mining a

    Jan 1, 1985

  • AUSIMM
    Development of Equipment Types at Renison Mine

    By Clarke RG

    Renison Mine was developed as the first all diesel mine in Australia. The foresight of the early planners in committing the Mine to Decline access has paid dividends in the past two decades with R

    Jan 1, 1982

  • AUSIMM
    Bauxite Mining Environmental Management and Rehabilitation Practices in Western Australia

    By Ward S. C, Gardner J. H

    In 1990, Alcoa of Australia Limited was elected to the Global 500 Roll of Honour of the United Nations Environment Program for the environmental management and rehabilitation of the bauxite mines i

    Jan 1, 1995

  • AUSIMM
    Mineralogical Factors in the Processing of Archean Sulphide Gold Ores

    In the past ten years or so there has been a renewed interest worldwide in the processing of refractory gold ores. The Archean province of Western Australia contains both numerous and major gold de

    Jan 1, 1991

  • AUSIMM
    A Proposed Standard for the Objective Measurement of Muck Pile Profiles

    Blast Engineers frequently use the terminology "the blast showed good heave", or even "the heave was better this time". It is reasonably obvious that "good" and "better" are not the best terms to us

    Jan 1, 1990

  • AUSIMM
    Designing Processing Operations for the Future ù DonÆt Forget Acid Drainage

    With the continued implementation of stricter limitations on the discharge of excess process water from all existing and future mining and metallurgical operations, the design and operation of the ent

    Jan 1, 2004

  • AUSIMM
    New Environmental Legislation: Implications and Issued for Coal Mining in NSW

    In December 1997, a series of new environmental legislation was enacted including:ò Environmental Planning andAssessmentAmendmentAct 1997; ò Contaminated Land ManagementAct 1997;ò Protection of the En

    Jan 1, 1998

  • AUSIMM
    A Facies Model for an Active Composite Volcano: Ruapehu, New Zealand

    By Houghton BF

    Ruapehu is an extremely active andesitic composite volcano, built in at least four cone- building episodes over the last 250 ka. The volcano was constructed by a variety of extrusive and subplinian

    Jan 1, 1987

  • AUSIMM
    Risk Assessment for New Technology in the Open Cut - Wambo Dragline

    By Lumley G. I, Duffy W. J

    The risk involved with incorporating new/unfamiliar technology into mines has, in the past, largely been evaluated by the supplier of the technology. The implications on safety and productivity has be

    Jan 1, 1992

  • AUSIMM
    Using the Floatability Characterisation Test Rig for Industrial Flotation Plant Design

    By J-P Franzidis

    Industrial flotation plant design is a complex process involving many aspects, one of which is the use of pilot-scale plants to test industrial plant flow sheets. Once test work on a pilot-scale has b

    Jan 1, 2004

  • AUSIMM
    Integral Pressure Strip/Electrowin Circuit for Gold Recovery from Activated Carbon

    By Macaulay J

    The recovery of gold from cyanide liquors is frequently effected by using activated carbon. Process economics however require non destructive methods of gold extraction from the carbon so that it may

    Jan 1, 1984

  • AUSIMM
    Exploration Geochemistry for Gold in Deeply Weathered Terrains: Sample Preparation Techniques

    By Govett G. J S, Currie D. A, Cohen D. R

    Analysis of mechanical size fractions of soils around the Paddington deposit (W.A.) and the Charters Towers Goldfields (Queensland) shows a bimodal gold distribution, with enrichment in the coarse

    Jan 1, 1988

  • AUSIMM
    Diversion Tunnels for the Magat River Multi-purpose Project-Geotechnical Aspects

    The paper describes the geotechnical as- pects of design and construction of two 12 m diameter concrete lined tunnels from the start of design to completion of construction. Prob- lems occurred due

    Jan 1, 1981

  • AUSIMM
    The Development of a Continuous Copper Drossing Process for Lead Bullion

    The first stage in the refining of lead blast furnace bullion is the removal of copper and this is normally done as a batch process in open kettles,A number of attempts have been made in the past to e

    Jan 1, 1963