Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Predicting the Performance of a Flotation Circuit that Incorporates Flash FlotationBy D Wiseman, R Dunne
Flash flotation is a process that is included in many new mineral processing plants as part of the grinding circuit. Some of the valuable minerals can often be liberated at coarse sizes and will remai
Jan 1, 2005
-
Seismicity at Big Bell MineBy J Player
Big Bell Mine started experiencing relatively large mining related seismic events, and accompanying rockbursts, from February 1999. Twelve rockbursts damaged access development from February 1999 to J
Jan 1, 2000
-
A Geological Overview of HyLogging 18 000 m of Core from the Eastern Goldfields of Western AustraliaBy T Roache, K Yang, M Quigley, C Young
In late 2004 a large-scale evaluation of a new suite of tools for semi-automated core logging was carried out in the Eastern Goldfields of Western Australia. Known as HyLoggingÖ Systems, these combine
Jan 1, 2006
-
Blasting at the Mt Wellington Quarry - 1997-1999By M Lentz
This paper will discuss the issues associated with blasting in an urban mining environment that have been addressed by Winstone Aggregates at the Mt Wellington Quarry. These issues include - control o
Jan 1, 1999
-
Changehouses and Equipment at North Broken Hill LimitedThe scheme of rehabilitation of surface plant commenced in 1936, included the provision of improved and more hygienic changing and bathing facilities for the employees.At that time the Thompson's
Jan 1, 1940
-
Will Your Mine Require Cooling?By A S. Derrington
In some parts of Australia, mine air cooling may not be needed until a depth of 1300 m below surface is reached. In other locations, it may be essential at a depth of only 300 m below surface. The rea
Mar 24, 2014
-
Development of Underground Gold Processing PlantsDevelopment of Underground Gold Processing Plants Underground gold processing plants have potential advantages over traditional surface installations related to a smaller environmental footprint, red
Sep 13, 2010
-
Geomechanical Modelling of the Mount Isa Copper Deposit – Predicting MineralisationBy R O’Sullivan, D Taylor, J G. McLellan, B Miller
The Mount Isa copper deposit is located adjacent to the city of Mount Isa, Queensland, and lies within a series of Palaeoproterozoic to Mesoproterozoic Superbasins. The deposit is hosted almost entire
Aug 18, 2014
-
Determination of Iron Ore and Gangue Mineral Associations Using Optical and Backscattered Electron Images with Electron Probe MicroanalysisBy S Hapugoda
Iron ore oxide and oxyhydroxide minerals such as haematite (eg various types of martite and microplaty haematite), different forms of goethite, magnetite, hydrohaematite and kenomagnetite were analyse
Jul 11, 2011
-
Charles Dickens on the (potentially) changing role of globalisation and sustainability in the long-term future of mining and explorationBy J P. Sykes, T C. McCuaig, M Jessell, A Trench
The election of Donald Trump and the Brexit referendum herald a shift towards a tighter definition of economic value, at the expense of the broader value concept of sustainable development; as well as
Sep 20, 2017
-
Road Trains Underground ù The Alternative Trucking SystemBy K Guilfoyle, A Robertson
In the mid-1970s, trucking ore from 400 m depth to the surface was perceived to be the practical and economic limit for metalliferous underground mines. Improvements in truck design and decline develo
Jan 1, 2002
-
Utilising Statistics and Geostatistics to Validate, Characterise and Improve Geological Domaining ù A Case Study From BHP BillitonÆs Yandi Channel Iron DepositBHP BillitonÆs Yandi channel iron deposit has a large resource of approximately 1.3 billion tonnes. This is a bulk mining operation with a high degree of selectivity not being practical. In contrast t
Jan 1, 2005
-
Use of fly-ash slurry in backfill grouting in coalminesBy X Z. Sun, N Jiang, J H. Zhao, C X. Wang, L Y. Bai
In backfill grouting for underground coalmines, the filling materials strengthen the caving rock and support the overlying strata to reduce surface subsidence. The broken roof strata fail and collapse
Nov 29, 2022
-
The AusIMM's Place in the Australasian Mineral IndustryThe Australasian Institute of Mining and Metallurgy (AusIMM) is a professional society for all those associated with the activities of the mineral industry. Differences of opinion exist within the mem
Jan 1, 1997
-
Stope Blast Vibration Analysis at Dugald River Underground MineBy J Player, R de Vries, E Villaescusa, R Hassell
Concerns regarding the uncertainty of stope dilution at MMG Dugald River Underground Mine led to a trial stoping program to acquire full-scale comprehensive geotechnical information and to test the va
Aug 24, 2015
-
Optimal Inference of Modelling Parameters to Simulate Complex Trends across Soft Boundaries – A Case Study in Heavy Mineral SandsBy T Wambeke, J Benndorf
A risk-robust development of a heavy mineral resource requires an assessment of the geological uncertainty and spatial variability of the key factors impacting the mining and processing operation. Att
Nov 24, 2014
-
Expansion of Iron Ore Processing Plant Using a Modular Design Basis as Applied to the Khumani Iron Ore Mine, South AfricaBy D Matthews
Increases in mining and production capacities can have a major impact on the productivity of a mining and production facility during the construction and commissioning period. With minimised productio
Jul 11, 2011
-
The Development of a KPI and Metallurgical Accounting Systems at NabalcoBy J Barnes
During September 2000, Nabalco management identified the need for a corporate system to deliver its key performance indicators (KPIs). In June 2001, a need was also identified to replace the existing
Jan 1, 2002
-
The Increased Recovery Project at the Phu Kham Copper-Gold Operation, Laos PDRBy A Hoyle, P Walker, D Bennett
The Phu Kham copper-gold operation located in Laos People’s Democratic Republic (PDR) is owned and operated by Phu Bia Mining Limited. PanAust Limited, based in Brisbane Australia, holds a 90 per cent
Sep 7, 2015
-
A New Approach to Flexible Open Pit Optimisation and SchedulingBy A Galli
Traditionally pit optimisation and scheduling is carried out assuming that the resources, the commodity prices and production costs are all known. Once the pit contour and the mining schedule have bee
Sep 26, 2011