A Review of General Considerations for Assessing Rock Mass Blastability and FragmentationBy P Lilly
Blasting is the primary comminution process in most mining operations. This process involves the highly complex and dynamic interaction between two main components. The first is the detonating explosi
Jan 1, 2001
-
Fast and Efficient Procedures for Stability Analysis Using Generalised Limit Equilibrium MethodBy Arit I, Adisoma G
General Limit Equilibrium Method (GLE) and Janbu's Generalised Procedure of Slices (GPS) are two limit equilibrium methods in slope stability analysis which satisfy all equilibrium conditions.
Jan 1, 1998
-
Development of Trials for Rehabilitation of a Bucket Wheel Excavator Spoil DumpBy Walton S, Wheeler D. J, Sargent D. M, Ting L. Y
Goonyella-Riverside mine is an open cut coal mine in Central Queensland. One component of the mining operations at this site is an uncompacted spoil dump some 50 m above the natural ground surface and
Jan 1, 1992
-
Settling Pond Design and Construction for the Malvern Hills Coal Project, CanterburyThe Malvern Hills coal project is now in an advanced stage of development with the stripping of overburden from above former underground workings in which a 3 m seam of subbituminous C coal with very
Jan 1, 2003
-
Measurement and Simulation of Face Ventilation Effectiveness for Large Diesel Powered EquipmentBy Brechtel C. E
Providing adequate airflow to effectively dilute and remove diesel pollutants in large mine working headings is a little researched area. A simulated diesel mucking operation was carried out in th
Jan 1, 1988
-
The Evaluation of a Non-Blinding Screen for Screening Iron Ore FinesHamersley Iron Pty. Limited has maintained an interest in the screening of iron ore fines (nominally -6 mm). However, no dry screening process had successfully demonstrated acceptable separating eff
Jan 1, 1991
-
Appraisal of the Jameson Flotation Cell for Recovery of Cyanide Soluble CopperBy Harbort G. J
Jameson cell pilot plant trials were conducted in a number of areas in the Red Dome gold/copper flotation plant during 1991. The aim of testwork was to reduce the amount of cyanide soluble copper re
Jan 1, 1992
-
An Investigation of Disposal Options for Arsenic Trioxide Produced from Roasting OperationsBy Lunt D
Arsenic is classified chemically as a metalloid. That is, it has properties intermediate between those of metals and non-metals. Like non-metals, it combines with many metals to form arsenides (eg
Jan 1, 1991
-
Water Jet Drilling for Large Diameter Stress Relief Borehole in Cole SeamBy Higuchi K, Sekimoto Y
In this report,the results of the large diameter drilling tests in coal seams assisted with water jet are described. The stress relief in coal seams by this new method is as effective as by the co
Jan 1, 1987
-
Cover Grouting for Development Headings at The Jarrah Decline, Boddington Gold MineJarrah Decline is currently the only underground operation at the Boddington Gold Mine, (BGM). The mine is located 120 km SE from Perth in WA, with mineralisation hosted within deeply weathered felsi
Jan 1, 1990
-
Dewatering and geothermal control for the proposed Lihir mine, Papue New GuineaAbout 3km2 of the central Luise Caldera, in which the Lihir orebody is located, is geothermally active wit.lj gas seeps and fumaroles, and in some areas, a water table at boiling point.The proposed mi
Jan 1, 1994
-
Subsidence for Deep Longwall Mining of Coal Overlain by Massive Sandstone StrataMining is taking place at increasing depths of cover on the Southern Coalfield beneath pre- dominantly massive sandstone strata. Within the next twenty years, there will be longwall mining at depths
Jan 1, 1981
-
Development and Operation of Loy Yang Open CutBy Waghorne E. P
The State Electricity Commission of Victoria is Australia's largest single coal producer. Approximately 19 Mt of coal will be produced in 1989 from the SEC V's newest mine, Loy Yang Open C
Jan 1, 1989
-
Incorporating the true costs and opportunities of rehabilitation and closure in project selection, design and approvalsBy C Tomlin, C Gimber
Historically, key closure risks have been studied during operations and then further assessed as cessation of mining approaches. Only in the past couple of decades or so has progressive rehabilitation
Aug 2, 2023
-
Rock and Coal Type Distribution in the Greymouth Area: Applications for MiningThe Main Seam occurs in two 'pods', termed North and South, separated by an east-west oriented 'want' zone (most probably a palaeo-channel). The seam on either side of the 'wa
Jan 1, 1996
-
Tele-Operation at Freeport to Reduce Wet Muck HazardsBy S Dirdjosuwondo, R Plaisance, L Thoma
PT Freeport Indonesia, a subsidiary of New Orleans-based Freeport McMoran Copper and Gold of New Orleans, operates a large mining complex on the Western half of the Island of New Guinea in Tembagapura
Jan 1, 2000
-
Boddington Gold Mine - An Example of Sustaining Gold Production for 30 YearsBy G Veillette, B Parker, S Hart
This paper provides a history of the challenges that were experienced while treating both the clayey oxide gold ores and the supergene copper-gold ores at the Boddington Gold Mine during the period 19
Jan 1, 2007
-
Crafers Highway Tunnels, Adelaide, SABy G Brewster
The Eagle on the Hill tunnels form part of an upgrade of Mt Barker Road, 15 km to the southeast of Adelaide. The upgrade significantly improves safety and reduces delays on this major road, which wind
Jan 1, 1999
-
Quantifying and Managing Environmental Financial Risk from Mining OperationsThis paper concerns a pragmatic approach to a problem that is common to many operations in the mining industry: how, over the short-term, to grasp the extent and distribution of long-term financial
Jan 1, 1994
-
Continuous Monitoring of Mechanised Breaker Line Supports to Investigate Roof and Pillar Behaviour (11th International Conference on Ground Control in Mining)By Medhurst TP, Trueman R, Hutchinson IN
A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.] Colliery, Queensland. This system was designed
Jan 1, 1992