Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Common pitfalls in sampling iron ore

    By R J. Holmes

    The procedures and equipment used for sampling iron ore process streams have generally improved in recent years. However, there are a number of areas where significant issues still commonly occur, inc

    May 9, 2017

  • AUSIMM
    Process Design of a Regrind Facility at the Leinster Nickel Operations to Improve Concentrator Recovery

    By K E. Barns, P J. Sharman, S A. Thomas and

    This paper presents the development of a regrind facility design at BHP BillitonÆs Leinster Nickel Operations (LNO) in Western Australia. The recovery opportunity was identified from an analysis of pl

    Jan 1, 2007

  • AUSIMM
    Examining the relationship (if any) between elevated phosphorus and ore textural type in Pilbara iron ores

    By M I. Pownceby, N Karimian, J R. Manuel, M J. Peterson

    The CSIRO ore classification scheme for Pilbara ores was used as a reference frame to target recognisable ore types/textures with potentially elevated phosphorus content for detailed analysis. Particl

    Sep 18, 2023

  • AUSIMM
    The Effect of Seasonal Variations on the Performance of Mineral Processing Plants – A Case Study of Deposit-10/11A Mine of NMDC Ltd

    By S Das

    Deposit-10/11A is situated in the iron rich Bailadila region of India comprising haematite ore of average grade 65 per cent Fe. The deposit production line was commissioned in the year 2002 having a c

    Jul 11, 2011

  • AUSIMM
    Organisational Factors in Fatalities and High Potential Incidents

    By N LaBranche, G Callinan

    There has been a reduction in overall workforce in the mining industry during the current downturn; a corresponding reduction in fatalities and high potential incidents (HPIs) has not been observed. T

    Jun 22, 2016

  • AUSIMM
    Production of Fertilisers and Smelter-Grade Alumina by Alkali Leaching of Christmas Island 'B' and 'C' Phosphate Ores

    Crandallite and millisite in Christmas Island 'B' and 'C' phosphate ores are rapidly decomposed by sodium hydroxide solutions at about 80QC. As these phosphates generally contain

    Jan 1, 1971

  • AUSIMM
    Controlling Stope Ring Relief in Multi-Level Mass Blasting

    By Q Liu

    Open stoping is one of the widely adopted methods in underground bulk mining. In this method, fanned or parallel holes are often drilled from a top sill down to a sublevel in the ore zone and blasted

    Jan 1, 2005

  • AUSIMM
    Quantifying the Economic Risk of Suboptimal Mine Plans and Strategies

    By J C. de Vries

    When times are tough in the mineral industry û as they have been for some time û typical responses by mining companies are to cut costs and/ or increase production. The latter is seen to spread fixed

    Jan 1, 2003

  • AUSIMM
    Discharge Chemistry From Above-Drainage Underground Mines in 1968 and 2000

    By J Demchak, L M. McDonald

    The duration of acid mine drainage flowing out of underground mines is important in the design of watershed restoration and abandoned mine land reclamation projects. People conducting land reclamation

    Jan 1, 2003

  • AUSIMM
    From paper to bytes – digital mapping implementation

    By A Whaanga

    The use of photogrammetry has greatly increased the accuracy of 3D mapping underground. However, this has not reduced the need or desire for geologists to produce plans and sections showing an interpr

    Mar 22, 2022

  • AUSIMM
    Competitiveness in the Coal Mining Industry

    For the last decade Australia has been the leading exporter of both steam and coking coal. In the ten-year period 1989 - 1998 steam coal exports increased by 93 per cent and metallurgical coal exports

    Jan 1, 2000

  • AUSIMM
    Effective Blast Engineering

    Of all of the processes in the mining cycle, blasting has the greatest impact on the efficiency of both mining itself and the initial stages of ore processing. The cost of blasting can be readily acco

    Jan 1, 1999

  • AUSIMM
    Gallery Stoping at Gold Resources Paringa Operations

    Gallery Stoping, an old but little used stoping method, has been reintroduced to workings at the Paringa South Shaft.Orebodies which are amenable to such a method are being mined in this manner with c

    Jan 1, 1985

  • AUSIMM
    Analysis of the Creep Behaviour of Tunnels in Sandstone/Shale

    By J C. Small

    Time-dependent deformation occurs when geo-materials are under an applied load; this may lead to additional deflection of a tunnel structure and the stress redistribution in the surrounding rock, shot

    Jan 1, 2008

  • AUSIMM
    Development of a Coal Mass Flow Monitor

    By Whitworth NR, Fox MJ, Henley RG

    The coal mass flow monitor was developed to measure the instantaneous mass flow rate of pulverised coal to the copper reverberatory furnace at Mount Isa. The instrument was calibrated with an isokinet

    Jan 1, 1985

  • AUSIMM
    CaroÆs Acid its Introduction to Uranium Acid Leaching in Australia

    After extensive testing and a period of plant trials to establish the benefits of Caro's acid (H2S05) as an alternative oxidant, Queensland Mines Limited (QML) decided to replace pyrolusite w

    Jan 1, 1984

  • AUSIMM
    Uranium Mining Operations at Ranger Northern Territory, Australia

    By Savory P. J

    Uranium mining operations commenced at Ranger mine site, Jabiru NT Australia in May 1980. The Ranger orebodies, totalling approximately 110 000 tonnes contained U305 had been indicated by airborne rad

    Jan 1, 1993

  • AUSIMM
    Excavation Design and Mining Methods in the 1100 Orebody, Mount Isa Mine, Australia

    By Sullivan BJK

    The 1100 orebody is a massive copper sul- phide orebody which contains a major portion of the Isa Mine copper ore reserves of 130 million tonnes at 3.2%. The underground mining of a deposit as larg

    Jan 1, 1978

  • AUSIMM
    Thoeretical Analysis of the Countercurrent Gas-Solid Heat Transfer During the Drying of Brown Coal Briquettes with Circulating Gas

    By Sharpin PC

    The countercurrent gas-solid-heat transfer during the drying of brown coal briquettes in the pilot carbonization plant at Morwell has been analysed and theoretical gas and solid temp-erature distribut

    Jan 1, 1963

  • AUSIMM
    The Effect of Residence Time and Aeration on Coal Recovery Within the High Intensity Zone of a Flotation Machine

    By J A. Cowburn

    The high intensity zone within the Jameson Cell is the downcomer. It is largely external and separated from the flotation tank. This, together with operation of the downcomer under vacuum, rather than

    Jan 1, 2005