Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Reply to Contributed Discussion (this issue) by John Shepher and L. Keith Rixon

    By ALAN J. HARGRAVES

    It is normal that Shepherd and Rixon, in their contributed discussion (this issue) see differences with Hargraves (1983), as it exemplifies the present uncertain situation worldwide, a situation expec

    Jan 1, 1983

  • AUSIMM
    The Geology of the Eastern Distributor Tunnel

    By T R. Justice

    The Eastern Distributor tunnel is located approximately 24 m beneath the suburbs of Woolloomooloo and Darlinghurst to the east of the central business district of Sydney. The 1.7 km long tunnel will c

    Jan 1, 1999

  • AUSIMM
    The Interaction Between Pulp Density and Frother Addition in Coal Flotation

    By Roberts T, Firth B. A

    A series of flotation experiments was carried out to study the interaction between the parameters of pulp density (mass per cent of solids in feed slurry) and frother addition (on the basis of solid m

    Jan 1, 1984

  • AUSIMM
    Birth, Death and Rebirth of the Duchess Phosphate Rock Deposits

    Since the initial discovery of phosphate rock resources in North West Queensland in 1966, significant changes in ownership and development direction have occurred. Initially development of the resourc

    Jan 1, 1998

  • AUSIMM
    Pre-concentration via waste rejection based on fragment size – Olympic Dam case study

    By K Ehrig, V Liebezeit, Y Li, B Pewkliang, M Smith, E Macmillan

    Pre-concentration of low grade ores via the rejection of low/no value materials based on fragment size is the subject of many published papers and studies over the past decade. However, the possibilit

    Nov 10, 2020

  • AUSIMM
    Simulating Mine Backfill in a Fully Drained Condition Using Discrete Element Modelling

    By A Karrech, A Hasan

    This paper presents the numerical simulation of mine backfilling in underground stopes using three-dimensional discrete element modelling (DEM). The simulation predicts the forces exerted at the stope

    Nov 5, 2014

  • AUSIMM
    Measuring the Redistribution of Stresses Resulting from New Excavations with Ambient Seismic Noise Correlations

    By F Brenguier, R A. Lynch, G Olivier

    The seismic velocities of intact rock are dependent on the applied stress. Unfortunately, the low susceptibility of seismic velocity to stress changes mean that changes in seismic velocity have to be

    May 9, 2016

  • AUSIMM
    The Role of the Metallurgist in Project Development

    The role of a project metallurgist is diverse and covers input into the resource definition, mining studies, metallurgical test program development, process engineering and plant design, cost estimate

    Jan 1, 2008

  • AUSIMM
    Use of Alkaline Industrial Wastes and Mine Tailings to Neutralise Acid Mine Drainage

    By I Doye

    Acid mine drainage is a serious environmental problem caused by the oxidation of sulfide minerals responsible for highly acidic, sulfate and metals-rich drainage. Several methods of mine waste managem

    Jan 1, 2003

  • AUSIMM
    Unlocking the Value in Waste and Reducing Tailings – Magnetite Production at Ernest Henry Mining

    By J Siliézar

    The Ernest Henry Mine (EHM) is situated 38 km north-east of Cloncurry in the Mount Isa – Cloncurry mineral district of northwest Queensland. The EHM orebody is an iron oxide copper gold deposit with a

    Jul 11, 2011

  • AUSIMM
    The Kinetics of Ilmenite Leaching in Hydrochloric Acid

    The production of synthetic rutile from ilmenite using hydrochloric acid leaching is investigated. Previously published data is used to comment on the optimum process conditions. It is shown that the

    Jan 1, 2001

  • AUSIMM
    A review of the GAG as an effective firefighting tool

    By D Chalmers

    After the sustained use of the GAG (Górniczy Agregat Gaśniczy) engine at a Queensland coalmine, it has raised questions as to its effectiveness as a remote firefighting tool. All firefighting apparatu

    Oct 12, 2022

  • AUSIMM
    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • AUSIMM
    Targeting dilatancy in upstream construction

    By A Simmons, J Chan, A Li, Q Gu, D M. Brett

    The paper presents an example of field density achievements using thin layer deposition and solar drying and compares this with compaction data from laboratory testing and field trials of mechanical d

    Jul 1, 2021

  • AUSIMM
    Adapting to Geotechnical Change – a Case Study of the Carina Open Pit Mine

    By R Jaine, D Strang, M Fowler

    "This paper presents a case study demonstrating active geotechnical pit slope management at the now completed Carina Iron Ore Project operated by Mineral Resources Ltd (MRL). The site is located 105 k

    Nov 15, 2016

  • AUSIMM
    Thermodynamic modelling of the Fe-Al-Ti-O system and evolution of Al- Ti complex inclusions during Ti-added ultra-low carbon steel production

    By Y B. Kang, Y J. Park

    Ti-added ultra-low carbon (ULC) steel is produced by adding Al and Ti during the secondary refining process to deoxidise molten steel and to bind C and N which are detrimental to the deep drawing qual

    Aug 21, 2024

  • AUSIMM
    Excavating the First Underground Gyratory Crusher at the Deep Mill Level Zone Mine, PT Freeport Indonesia

    By E Hernandez, I Agustian, W Kusumohastuti

    PT Freeport Indonesia is completing the first underground gyratory crusher excavation at their Deep Mill Level Zone (DMLZ) mine located in the mountains of Jayawijaya, District of West Papua, Indonesi

    Mar 24, 2014

  • AUSIMM
    The Demonstration of Electronic Systems to Assist in the Management of a Significant Incident

    By R Moreby

    This paper is a demonstration of the techniques developed during an Australian Coal Association Research Program (ACARP) funded research project aimed to develop aids, principally computer based, to a

    Jan 1, 2005

  • AUSIMM
    Mapping Quartz, Carbonates and Riebeckite in Banded Iron Formation Iron Ore Drill Core Using CSIRO’s TIRHyLogging System

    By M C. Schodlok

    Banded iron-formation (BIF) and iron ores were measured using the CSIRO developed TIRHyLogger ™ to assess its ability to map quartz, carbonates and riebeckite. The TIR-HyLogger™ measures continuously

    Jul 11, 2011

  • AUSIMM
    The Technology of Gold Recovery from Black Sands by the Method of Liquid Phase Chlorination

    By Zichenko ZA, Volkov SV, Shaluhina LM, Emelyanov AF

    A method of selective gold recovery from black sands has been elaborated which is based on the liquid phase low temperature chlorination of materials. A liquid agent mixture of sulphur monochloride

    Jan 1, 1993