Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Remodelling the Purnama Deposit – An Interpretation Case Study from G-Resources Martabe Project, Indonesia

    By A N. Kusnanto, D Sims, L Henim, S Crispin, J Hertrijana

    The high sulfidation Purnama Au-Ag deposit located on the Indonesian island of Sumatra entered production in mid-2012 following a two-year program of construction and development. Discovered in 1997 f

    Aug 18, 2014

  • AUSIMM
    The challenges of removing sulfur from magnetite ores to meet direct reduction specifications

    By D Connelly

    Magnetite ores can be used to produce very high-grade concentrates that are suitable feed for the direct reduction process route but the high sulfur content of some concentrates can cause substantial

    Sep 18, 2023

  • AUSIMM
    Ramp Up of the Pasminco Century Concentrator to 500 000 tpa Zinc Metal Production in Concentrate

    By M Spagnolo, M Ashley, D, L Reemeyer

    PasmincoÆs Century Concentrator in North West Queensland commenced operations in November 1999. The nameplate production capacity of 500 000 tpa of zinc metal production in concentrate was achieved in

    Jan 1, 2003

  • AUSIMM
    Cannington Mine - Back to the Cradle for BHP

    The Broken Hill Proprietary Company Limited (BHP) started as a silver-lead-zinc mining company in Broken Hill, New South Wales, Australia in the 1880s. Since then it has diversified into the resource

    Jan 1, 1998

  • AUSIMM
    Design of Copper-Cobalt Hydrometallurgical Circuits

    Copper-Cobalt hydrometallurgy has seen a resurgence in recent years with the development of projects in Zambia and the DRC. Many of the flow sheets are unique in their use of hydrometallurgical techni

    Jan 1, 2008

  • AUSIMM
    The Development of Models in Minerals Processing

    By I Cameron

    Simulation is increasingly being used to analyse mineral processing operations and explore efficiency options. Engineers that use simulation are rightly concerned with the quality and applicability of

    Jan 1, 1998

  • AUSIMM
    Universal Reconciliation – A Multidisciplinary Approach across the Entire Mining Value Chain to Identify Loss of Value and Maximise Operational Performance

    By R Hargreaves, C Morley

    The authors often see problems on mine sites that are due to insufficient feedback between technical discipline silos as the realities on the ground fail to inform the models and plans used to drive r

    Aug 18, 2014

  • AUSIMM
    Seismically Active Mines ù To Buy or Not to Buy

    In recent years there have been many changes in mine ownership due to the on-going rationalisation towards larger mining companies. Larger companies inevitably find it hard to manage small mining oper

    Jan 1, 2002

  • AUSIMM
    The Application of Rock Stress Inputs to Stability Assessments at Ok Tedi Mine, Papua New Guinea

    By K W. Mills, N R. P Baczynski, J Mylvaganam, D A. Prado, M F. Lee, I A. de Bruyn

    "This paper presents the second part of a study of the assessment of rock stress inputs on the performance of various new mining designs at the Ok Tedi large open pit mine in Papua New Guinea. Over th

    Nov 5, 2014

  • AUSIMM
    Road Infrastructure Security Assessment and Measures Selection Methodology Using SecMan – Tunnel Example

    By J Karlovšek, M Hafner, M Žibert

    The transport network in Europe is probably one of the most important systems for the European economy and society. Trans-national transport routes play a vital role in the traffic of goods and the su

    Sep 17, 2014

  • AUSIMM
    Simulation Modelling of Grade Variability for Iron Ore Mining, Crushing, Stockpiling and Ship Loading Operations

    By K Jupp, T J. Howard

    Cliffs Natural Resources Pty Ltd (CNR) operates iron ore mines in the Koolyanobbing region of Western Australia, about 50 km north of the town of Southern Cross. Ore is trucked from three geographical

    Jan 1, 2009

  • AUSIMM
    Sublevel Caving - Today's Dependable Low-Cost 'Ore Factory'

    Much of the theory upon which the Sublevel Caving (SLC) method is based was developed in Scandinavia many years ago. It was based mainly on æbinÆ theory and æellipsoid of drawÆ configurations derived

    Jan 1, 2000

  • AUSIMM
    Managing Expectations – From Buyer Beware to Buyer Be Aware

    By P J. Fairfield

    "This paper reflects on the author’s experiences in undertaking mining studies and reviewing mining projects and technical reports, particularly over the past five years, and the impact of recent chan

    Mar 8, 2016

  • AUSIMM
    Be Open to Closure - It Can Save You Money

    By J Heyes

    Historically mining engineers haven't spent enough time planning waste dumps, but waste movement costs often outweigh ore haulage costs. There is a real incentive to plan waste dumps right the fi

    Jan 1, 2009

  • AUSIMM
    Do All MetPlants Work Well? PlantMets can Ensure They Do

    By P Cameron

    MetPlant conferences have focused on ensuring mining projects are well designed then optimised to operate safely and effectively at the top end of world’s best practice to ensure shareholders are not

    Sep 7, 2015

  • AUSIMM
    Geoscan Online Analyser Use for Process Control at Fortescue Metals Group Sites in Western Australia

    By B J. Beven, A Harris, L Balzan

    Fortescue Metals Group flagship operation, Cloudbreak, is located in the Pilbara region of Western Australia. The mine is capable of delivering an annualised production rate of 40 Mt/a. Positioned 50

    Jul 13, 2015

  • AUSIMM
    Is a 2.5áper cent Success Rate Good Enough? Traditional Mine Development Methods have the Tail Wagging the Dog

    By J Jackson, D C. Curry, A C. Keith

    Australian Bureau of Statistics (ABS) data shows that since 2006 the balance of capital costs associated with mine development has become weighted greater than 75 per cent to enabling infrastructure a

    Sep 29, 2013

  • AUSIMM
    Variographic case study for designing, monitoring and optimising industrial measurement systems – the missing link in Lean and Six Sigma

    By O Bøckman, E Thisted, K H. Esbensen, U Thisted

    Process industry measurement systems, once installed, are often interpreted as static black boxes delivering correct values as long as not proven otherwise. After first implementation and set-up with

    May 9, 2017

  • AUSIMM
    21st century relining – the path to greater mine site profitability

    By P Rubie, J Russell

    This paper looks at the past, present and not too distant future of grinding mill relining.Since the adoption of autogenous grinding (AG) mills and semi-autogenous grinding (SAG) mills as the primary

    Aug 29, 2018

  • AUSIMM
    Engineering the New Olympic Dam Backfill System

    By A G. Grice

    WMC Resources Pty Ltd û Copper Uranium Division operates the large underground Olympic Dam Mine at Roxby Downs, South Australia. These operations mine and process the ore to produce refined copper, ur

    Jan 1, 2000