Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Bulk carrier vessel tracking automation – the Dalrymple Bay use caseBy W Russell, P Wighton, J Franke
Recent advances in ruggedised industrial control system technology and architecture in combination with latest technologies in the fast-evolving 3D LiDAR sensor sector becoming available have enabled
Nov 8, 2021
-
Unlocking mine productivity by changing-the-equation on the where, what and when of orebody characterisationBy S Warden, T Neville, P Leckie
At its simplest, the classification and characterisation of an orebody is a matter of Where, What and When. Where and with what spatial resolution are measurements taken, What properties are measured,
Sep 1, 2024
-
Case Histories – Roller Compacted Concrete Dam Waterproofing with a Bituminous Geomembrane in Chile and a Tailings Dam in Peru Subject to an Earthquake of 8.1 MagnitudeBy R McIlwraith, B Breul
Two case studies are presented in this paper. The first one discusses a roller compacted concrete water supply dam that was constructed in El Mauro in Chile to provide water for agriculture activities
Jul 27, 2015
-
Solvent Extraction of Uranium – Towards Good Practice in Design, Operation and ManagementBy P Bartsch
Uranium solvent extraction, USX has been applied commercially for recovery and concentration for over 50 years. Uranium in acidic liquor, which is prepared following ore leaching, solid/liquid separat
Aug 8, 2011
-
Getting the most from existing processes: using cleverly designed experiments to optimise the line 3 AG mill at Boyne Smelters LimitedBy T G. Vizcarra, T J. Napier-Munn, A T. Karbowiak, M G. Hart
Squeezing extra performance from existing equipment (‘sweating the assets’) is key to continuous improvement initiatives, particularly during times of cost cutting where the option of spending additio
Aug 29, 2018
-
Optimising flotation plant operation by using a digital twin in the control roomBy R Tooher, S J. Oliver
The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p
Aug 29, 2018
-
Heterogeneity and bulk ore sorting – methods to estimate ore sorting performanceBy J Rutter, S Dunham
Technological advances in sensor and material handling technology has enabled a step change in mine operations performance. Sensors capable of monitoring the grade of broken rock mass can be mounted o
Nov 10, 2020
-
Improved Grade Control using Reverse Circulation Drilling at Mogalakwena Platinum Mine, South AfricaBy G Kirk
Definition and delineation of in-pit ore and waste material are the most significant tasks for an open pit production geologist; adding or destroying value in the mining value chain. Anglo American’s
Aug 22, 2011
-
Mine Real-Time Personal Respirable Dust and Diesel Particulate Matter MonitoringBy H W. Wu, T Harvey
An overview is given of two new developments in mine atmospheric monitoring. A new personal dust monitor (PDM) that gives real-time respirable dust readings is discussed. The unit is mounted within th
Jan 1, 2008
-
Testing and modelling of diverse iron ore slurries for pipeline friction and pump head derateBy V Matousek, A Sellgren, R Visintainer, G McCall
A 4-component model for settling slurry pipe flow has been previously described by Wilson et al (2006) and Sellgren et al (2014) to predict pipeline friction loss (hydraulic pressure gradient) over a
Nov 8, 2021
-
Sampling Quality Assurance and Quality Control Requirements for Mining ProjectsThe creation of an accurate and precise enough database requires the collection of many representative samples, subsampling and assaying them without destroying their integrity. The selection and impl
Mar 1, 2010
-
Copper Scalping at ValeÆs Matte Separation PlantBy S Girard, L Rowland, V Lawson, Y Shields
Since 1948, ValeÆs Matte Separation Plant has been successfully using magnetic separation and froth flotation to separate the copper sulfide, nickel sulfide and Ni-Cu metallic alloy contained in Besse
Oct 29, 2012
-
An integrated and balanced approach to developing pre-concentration technologies across the mining value chainBy G J. Wilkie, P A. Revell
The R&D landscape for ore pre-concentration technologies within mining is characterised by the development of individual technologies and point solutions. This presents METS and mining companies with
Nov 10, 2020
-
Challenging the Norms Time Usage Model – Mobile Underground Mining EquipmentBy R Ballantyne, M Adams
Time Usage Models, used as a basis for calculating performance indicators for mobile mining equipment, have developed from very simple to very sophisticated models. This development has paralleled the
Mar 15, 2021
-
Operational deployment of sensor technologies for bulk ore sorting at Mogalakwena PGE MineBy J Rutter, J du Plessis, er, M Scott, D Alex
It is generally acknowledged that bulk ore sorting is an attractive prospect for the mining industry. However, uncertainties relating to the operational performance of sensor technologies, the grade h
Nov 10, 2020
-
Driving the transformation to hydrogen ironmaking – an experimental vertical shaft H2-DRI reactor facility in NZBy M McCurd, M Lynch, B H. Yin, S Mendoza, C W. Bumby, Y Iwasaki, B Rumsey
Iron and steel production is responsible for approximately 6.3 per cent of global anthropogenic CO2 emissions. Direct reduction of iron with hydrogen is a potential route for decarbonising the iron an
Sep 18, 2023
-
Mining in Morobe, Papua New Guinea – Impacts, Assurance and Self-determinationBy C Roche, G M. Mudd
The Morobe Province of central Papua New Guinea (PNG) has been mined for gold for nearly a century, although it is only in the past decade that large-scale modern mining commenced. The Hidden Valley g
Jul 16, 2014
-
Safety and Financial Value Created by Good Slope Management Strategies and TacticsBy A R. Bye, T R. Stacey
Anglo PlatinumÆs Potgietersrust Platinums (PPRust) operates three open pits and plans to excavate 90 Mt of rock in 2007. With pit slopes expected to reach a height of 400 m, the geotechnical departmen
Jan 1, 2007
-
Introduction of the Robbins Mobile Miner to Mount Isa Mines LimitedBy Neill T. J, Howarth D. F, Malcolm J. McPhersqn
For many years Isa Mine has seen the need for a continuous mining machine which will economically cut hard rock. Tunnel borers are unsuitable due to the size and inflexibility of the machine and t
Jan 1, 1986
-
Development of a new beneficiation plant for recovery of iron and apatite concentrates through wet tailing damsBy M Saghaeian, A H. Baladastian, A Dehghani Ahmadabadi, V Sheikhzadeh, R Hejazi
With the declining of high-quality hematite and magnetite iron ore reserves and the increasing accumulation of material resulting from mining and beneficiation operations that appear as lowquality dep
Aug 24, 2022