Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Bucket Wheel Excavator Mining System Experience at NZ Steel Mining Ltd's Ironsand Operation

    At the Waikato North Head Ironsand operation, NZ Steel Mining Ltd is using a Bucket Wheel Excavator û shiftable conveyor mining system to excavate Titanomagnetite bearing sand and clay. The syst

    Jan 1, 1986

  • AUSIMM
    Unlocking mine productivity by changing-the-equation on the where, what and when of orebody characterisation

    By S Warden, T Neville, P Leckie

    At its simplest, the classification and characterisation of an orebody is a matter of Where, What and When. Where and with what spatial resolution are measurements taken, What properties are measured,

    Sep 1, 2024

  • AUSIMM
    Case Histories – Roller Compacted Concrete Dam Waterproofing with a Bituminous Geomembrane in Chile and a Tailings Dam in Peru Subject to an Earthquake of 8.1 Magnitude

    By R McIlwraith, B Breul

    Two case studies are presented in this paper. The first one discusses a roller compacted concrete water supply dam that was constructed in El Mauro in Chile to provide water for agriculture activities

    Jul 27, 2015

  • AUSIMM
    Solvent Extraction of Uranium – Towards Good Practice in Design, Operation and Management

    By P Bartsch

    Uranium solvent extraction, USX has been applied commercially for recovery and concentration for over 50 years. Uranium in acidic liquor, which is prepared following ore leaching, solid/liquid separat

    Aug 8, 2011

  • AUSIMM
    Optimising flotation plant operation by using a digital twin in the control room

    By R Tooher, S J. Oliver

    The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p

    Aug 29, 2018

  • AUSIMM
    Getting the most from existing processes: using cleverly designed experiments to optimise the line 3 AG mill at Boyne Smelters Limited

    By T G. Vizcarra, T J. Napier-Munn, A T. Karbowiak, M G. Hart

    Squeezing extra performance from existing equipment (‘sweating the assets’) is key to continuous improvement initiatives, particularly during times of cost cutting where the option of spending additio

    Aug 29, 2018

  • AUSIMM
    Improved Grade Control using Reverse Circulation Drilling at Mogalakwena Platinum Mine, South Africa

    By G Kirk

    Definition and delineation of in-pit ore and waste material are the most significant tasks for an open pit production geologist; adding or destroying value in the mining value chain. Anglo American’s

    Aug 22, 2011

  • AUSIMM
    Heterogeneity and bulk ore sorting – methods to estimate ore sorting performance

    By J Rutter, S Dunham

    Technological advances in sensor and material handling technology has enabled a step change in mine operations performance. Sensors capable of monitoring the grade of broken rock mass can be mounted o

    Nov 10, 2020

  • AUSIMM
    Mine Real-Time Personal Respirable Dust and Diesel Particulate Matter Monitoring

    By H W. Wu, T Harvey

    An overview is given of two new developments in mine atmospheric monitoring. A new personal dust monitor (PDM) that gives real-time respirable dust readings is discussed. The unit is mounted within th

    Jan 1, 2008

  • AUSIMM
    Sampling Quality Assurance and Quality Control Requirements for Mining Projects

    The creation of an accurate and precise enough database requires the collection of many representative samples, subsampling and assaying them without destroying their integrity. The selection and impl

    Mar 1, 2010

  • AUSIMM
    Copper Scalping at ValeÆs Matte Separation Plant

    By S Girard, L Rowland, V Lawson, Y Shields

    Since 1948, ValeÆs Matte Separation Plant has been successfully using magnetic separation and froth flotation to separate the copper sulfide, nickel sulfide and Ni-Cu metallic alloy contained in Besse

    Oct 29, 2012

  • AUSIMM
    Testing and modelling of diverse iron ore slurries for pipeline friction and pump head derate

    By V Matousek, A Sellgren, R Visintainer, G McCall

    A 4-component model for settling slurry pipe flow has been previously described by Wilson et al (2006) and Sellgren et al (2014) to predict pipeline friction loss (hydraulic pressure gradient) over a

    Nov 8, 2021

  • AUSIMM
    Driving the transformation to hydrogen ironmaking – an experimental vertical shaft H2-DRI reactor facility in NZ

    By M McCurd, M Lynch, B H. Yin, S Mendoza, C W. Bumby, Y Iwasaki, B Rumsey

    Iron and steel production is responsible for approximately 6.3 per cent of global anthropogenic CO2 emissions. Direct reduction of iron with hydrogen is a potential route for decarbonising the iron an

    Sep 18, 2023

  • AUSIMM
    Challenging the Norms Time Usage Model – Mobile Underground Mining Equipment

    By R Ballantyne, M Adams

    Time Usage Models, used as a basis for calculating performance indicators for mobile mining equipment, have developed from very simple to very sophisticated models. This development has paralleled the

    Mar 15, 2021

  • AUSIMM
    Mining in Morobe, Papua New Guinea – Impacts, Assurance and Self-determination

    By C Roche, G M. Mudd

    The Morobe Province of central Papua New Guinea (PNG) has been mined for gold for nearly a century, although it is only in the past decade that large-scale modern mining commenced. The Hidden Valley g

    Jul 16, 2014

  • AUSIMM
    Operational deployment of sensor technologies for bulk ore sorting at Mogalakwena PGE Mine

    By J Rutter, J du Plessis, er, M Scott, D Alex

    It is generally acknowledged that bulk ore sorting is an attractive prospect for the mining industry. However, uncertainties relating to the operational performance of sensor technologies, the grade h

    Nov 10, 2020

  • AUSIMM
    Safety and Financial Value Created by Good Slope Management Strategies and Tactics

    By A R. Bye, T R. Stacey

    Anglo PlatinumÆs Potgietersrust Platinums (PPRust) operates three open pits and plans to excavate 90 Mt of rock in 2007. With pit slopes expected to reach a height of 400 m, the geotechnical departmen

    Jan 1, 2007

  • AUSIMM
    An integrated and balanced approach to developing pre-concentration technologies across the mining value chain

    By G J. Wilkie, P A. Revell

    The R&D landscape for ore pre-concentration technologies within mining is characterised by the development of individual technologies and point solutions. This presents METS and mining companies with

    Nov 10, 2020

  • AUSIMM
    Multislice Longwalling for Thick Seam Extraction – Properties of Goaf in the Roof and Gate Roads Behaviour

    By Z Lubosik, S Prusek, M Plonka, B Syrek

    "The most commonly used method of thick coal seam extraction in Polish deep mines is multislice longwall (MSL). In MSL stability of goaf in the roof as a result of previous extraction in upper slice i

    Nov 5, 2014

  • AUSIMM
    Development of a new beneficiation plant for recovery of iron and apatite concentrates through wet tailing dams

    By M Saghaeian, A H. Baladastian, A Dehghani Ahmadabadi, V Sheikhzadeh, R Hejazi

    With the declining of high-quality hematite and magnetite iron ore reserves and the increasing accumulation of material resulting from mining and beneficiation operations that appear as lowquality dep

    Aug 24, 2022