    The underdog mechanical alternative for tailings dewatering: the screw press

    By S Whitton, W Wimmler, L Wimmler

    “Given the increasing scrutiny of the mining industry and its relatively poor record with regards to mine tailings management, increased requirements to minimise water usage (often accompanied by very

    Jul 1, 2021

  • AUSIMM
    Design and Construction of Large Caverns in Granite – Ulu Jelai Hydroelectric Project, Malaysia

    By B Chapman, B Gaida, L Drowley

    The 372 MW Ulu Jelai Hydroelectric Project is a peaking power scheme located in the Cameron Highlands, Malaysia. The main features of the project include an 84 m high roller compacted concrete dam; tw

    Sep 17, 2014

  • AUSIMM
    Minerals Processing Automation Technology in 2007

    By R A. Medower

    This paper provides a glimpse into the future of minerals processing with emphasis on æAutomation InnovationsÆ for the new millennium, particularly those involving advanced process control and innovat

    Jan 1, 2000

  • AUSIMM
    A Comparison Between a Flotation Mini Pilot Plant and a Copper Concentrator Mill

    By K L. C Gontalves

    In 1999, the Mineral Development Centre of CVRD (CDM) acquired a flotation device referred to as Mini Pilot Plant (MPP), which is able to run continuous flotation tests with drill core samples. Since

    Jan 1, 2005

  • AUSIMM
    Comparative performance of single and tandem stator arrangements in a one stage ventilation fan

    By G C. Snedden

    Tandem row stator arrangements are common in the last stage of multirow, gas turbine compressors. Tandem row stators, or stator and de-swirler vane combinations are used to relieve the loading on the

    Oct 12, 2022

  • AUSIMM
    Ore Mineralogy and its Relevance for the Selection of Concentration Methods in the Processing of Brazilian Iron Ores

    By C C. Souza, S C. Amarante, A C. Arauj

    All major companies now producing iron ore in Brazil currently employ or are planning to employ some sort of concentration method to upgrade their fine sized products (sinter feed fines and pellet fee

    Jan 1, 2002

  • AUSIMM
    Lump Ore Properties and Their Impact on Value-in-use in Ironmaking

    By T Honeyands, L Jelenich

    We are currently witnessing large fluctuations in the relative price of ironmaking raw materials brought on by changes in the dynamics of supply and demand, market conditions, environmental regulation

    Jul 13, 2015

  • AUSIMM
    Ausenco Carbon Reactivation Design Criteria

    By D Preedy, J K. Claflin, S R. J La Brooy

    This paper summarises the lessons learned during a recent carbon reactivation kiln upgrade project at the Sukari Gold Mine in Egypt. The kiln is being replaced to ensure that the plant achieves full v

    Sep 26, 2013

  • AUSIMM
    Coarse Gold Separation at Bendigo

    Bendigo Mining operates a 600 000 t/a comminution, gravity, flotation and leaching processing plant for the recovery of gold from their Kangaroo Flat Operation, in the Bendigo goldfields. The free gol

    Aug 1, 2010

  • AUSIMM
    George Fisher Mine - Feasibility and Construction

    By G S. B Karunatillake

    Following a pre-feasibility study, Mount Isa Mines commenced a feasibility study on the deposit of the George Fisher Mine in May 1997. Board approval was granted in May 1998 to construct a 2.5 million

    Jan 1, 2000

  • AUSIMM
    Lessons learnt in geotechnical investigation and stability analysis for upstream tailings storage facility raise design

    By C Armstrong, B Wentzinger

    Upstream embankment raises often represent the lowest cost option for increasing the capacity of tailings storage facilities (TSF), but also pose the highest stability risk due to constructing on top

    Jul 23, 2018

  • AUSIMM
    Coal Bursts in the Deep Longwall Mines of the United States

    By C Mark

    Coal bursts involve the sudden, violent ejection of coal or rock into the mine workings. They are a particular hazard because they typically occur without warning. During the past two years, three US

    Nov 5, 2014

  • AUSIMM
    Approaches to Reporting Grade Uncertainty in High-Nugget Gold Vein Projects

    By W B. Edgar, S C. Dominy

    High-nugget effect vein-gold systems are generally considered to be one of the most challenging of deposit types to evaluate and exploit. To potential investors and mining companies, they are viewed a

    May 24, 2012

  • AUSIMM
    Impact of Stope Geometry on Backfill Systems for Bulk Mining

    By A Grice

    AMC has completed a number of backfill options studies, including several in recent years for large, three-dimensional orebodies involving total extraction by longhole open stoping with backfill. This

    Jan 1, 2000

  • AUSIMM
    Thiosulfate Processing - From Lab Curiosity to Commercial Application

    By J Langhans, Y Choi, Q Wang, J Y. Baron, P Kondos

    Barrick has successfully developed the thiosulfate leaching process to treat sulfidic high preg-robbing ores. The process was developed through rigorous bench test programs and proved in pilot campaig

    Sep 26, 2013

  • AUSIMM
    Physical and Mechanical Characterisation of Paste Backfill by Laboratory and In-Situ Testing (6467738c-7044-43a0-9a73-ca12bdc18202)

    By Bidwell TJ, Servant S

    Paste back-fill technology is gaining rapid acceptance in the Canadian mining industry. The authors were able to work on four different mining sites employing paste technology in their operation. In

    Jan 1, 1998

  • AUSIMM
    A Review of the Acid Rock Drainage Potential and Hydrological Implications of Selectively-Placed Waste Rock at a Gold Mine in NSW, Australia

    By J Jeffrey, G W. Wilson, L Gilbert, C

    Prior to the commencement of mining, the acid rock drainage (ARD) potential of the waste rock to be produced by an open cut mining operation is assessed by a variety of techniques carried out on drill

    Jan 1, 2003

  • AUSIMM
    A Comparison of Skip Loading Systems from an Operational, Maintenance, Safety and Capital Cost Estimate Perspective

    By A E. A Northcote

    The drive to maximise performance, reduce maintenance times, improve safety of operation and maintenance on mining equipment while keeping both operational and capital costs down has provided good nou

    Mar 21, 2011

  • AUSIMM
    Successfully Implementing Technology-driven Change in the Mining Environment

    By B McCarthy

    Mining has been typified of late as a boom and bust, cyclical industry operating against a steady decline in the size and quality of mineral deposits. Decreasing deposit grades and increasing costs of

    Jun 22, 2016

  • AUSIMM
    The basics of grinding circuit optimisation

    By A Giblett, B Putland

    This paper provides a simple guiding framework for grinding circuit optimisation, focussing on common themes in past optimisation success stories, the conditions for success and techniques that can be