Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
How to select appropriate instrumentation to safeguard TSFs against credible failure modesBy P J. Chapman
Recent catastrophic failures of tailings storage facilities (TSFs) continue to highlight the need for a detailed understanding of failure modes and the defences that are in place within the design to
Jul 1, 2021
-
Underground Information Technology Infrastructure - A Sound Basis for Efficient Future Mining OperationsBy M Schmid
German hard coal mining operations have decreased for more than 40 years. Current political decisions are leading to a discontinuation of subsidised black coal mining by the year 2018. This decision w
Jan 1, 2008
-
Blasting a Cavern Using Bulk Emulsion ExplosivesThe Elgas Underground Storage Facility at Port Botany, Sydney, is the first purpose-built cavern of its kind in Australia and allows large capacity, safe and environmentally benign storage of Liquefie
Jan 1, 1999
-
Managing the Transition from Low Stress to High Stress ConditionsThe transition from low stress to high stress conditions is a challenge eventually faced by most mines in Australia that extend to depths greater than (generally) about 1000 m. In areas with strongly
Nov 25, 2010
-
An Evolving Understanding of the Controls of the Trident Gold Deposit, Higginsville, Western AustraliaBy C F. Stokes
The Trident Gold Deposit has been successfully developed by Alacer Gold (formerly Avoca Resources Limited) into a 1.3 Mt/a operation in the space of four years from discovery to first gold pour (2008)
Aug 22, 2011
-
Managing the Giant – A Mine Geologist’s Perspective to the Mining of the Olympic Dam DepositBy M K. Kapo, S C. Nzama
The success of a mining operation depends on the quality of data used in decision-making processes and the people involved in making operational decisions. At Olympic Dam, mine geologists form an inte
Aug 18, 2014
-
The Influence of Liner Wear on Milling EfficiencyBy P Toor
Due to the high energy consumption of milling, it is desirable to improve the efficiency of this process. One alternative to reduce energy and material consumption while optimising production yield in
Aug 8, 2011
-
Jameson Cell Test Work on Copper Streams in the Copper Concentrator of Mount Isa Mines LimitedBy Griffin PT, Espinosa-Gomez R, Jameson GJ
Two major issues are to be addressed in the Copper Concentrator of Mount Isa Mines Limited. The first of these is the need to increase concentrator flotation capacity to increase copper recovery, wh
Jan 1, 1993
-
Understanding your work health and safety obligations – risk-based psychosocial safety: a framework for leaders and supervisors to demonstrate that they are working to meet their obligationsBy S Harrison
Work health and safety duties around Australia include duties to manage psychosocial health and safety (mental health) of workers engaged by businesses or undertakings and of other persons impacted by
Apr 16, 2024
-
Surface-to-inseam (SIS) Drilling at Oaky Creek Coal Mine – SIS Design Aspects and Drilling EnvironmentBy E Corpuz, J Weissman, S Winter, R Evans
The surface-to-inseam (SIS) directional drilling technique has been utilised at Oaky Creek Coal for more than a decade to predrain both the Oaky No 1 and Oaky North mining areas. The cumulative drilli
Aug 31, 2015
-
Project-Finance Risks ù Due Diligence MattersProject-finance risk assessment is mature and approached systematically. Mining industry due diligence remains fragmented with specialists addressing different aspects of the project such as reserves/
Jan 1, 2007
-
Effects of Shear on the Behaviour of Polymer-treated SlurriesBy D Reid, A Fourie
The in-pipe treatment of slurries with polymer addition shortly prior to deposition is a noteworthy emerging technology of increasing popularity. Although polymer treatment has been shown to substanti
Jul 27, 2015
-
Concept Design of the Central Business District Rail Link, AucklandBy J Q. Cooper
The New Zealand rail authority, Kiwi Rail and Auckland Regional Transport Authority (ARTA), are jointly planning a new mainline rail link between Auckland’s downtown Britomart Station and the existing
Mar 8, 2011
-
Quantitative X-Ray Mineralogy of Iron Ore and ScalesBy K Knorr
Desktop X-ray powder diffraction using a D2 PHASER equipped with fast linear detector was performed on several iron ore and mill scale samples. Data were analysed using cluster analysis and Rietveld q
Jul 11, 2011
-
Financial Modelling with the Auditor in MindBy S G. Gemell
"The financial model is an integral component of any project evaluation based on mineral resources, ore reserves and (at least internally) exploration targets. Given the unity of purpose for preparing
Mar 8, 2016
-
Preparing Effective Specifications for Occupational Health and Environmental Noise Objectives in Mining Project Design and DeliveryBy C Tickell
Achieving occupational health and environmental noise objectives is a major consideration in the planning or operational phase of resource development and industrial projects to meet the needs of the
May 9, 2016
-
The Application of the Floatability Characterisation Test Rig (FCTR) in Flotation ResearchBy J-P Franzidis
Mill operators have traditionally been forced to rely on grade-recovery curves and overall flotation rate constants when analysing proposed improvements to plants. This has led to loss in money and ti
Jan 1, 2000
-
Challenges for High Pressure Grinding in the New MillenniumBy J Knecht, R Klymowsky, E Burchardt
The wide spread introduction of SAG mills into grinding circuits 20 years ago was the last development which had a major impact on the design and economics of comminution circuits. Single SAG mills we
Jan 1, 2000
-
Forging Ahead - A Collaboration Between the OZ Minerals Prominent Hill Concentrator and Magotteaux to Improve Plant PerformanceBy PáDeáBosscher, A Bruwier, M Weidenbach, C Philippe, T Ly, A Van Den Bosch
In the mining business the cost of grinding media represents up to 40 per cent of the total milling cost and therefore grinding media optimisation has a direct impact on the concentratorsÆ bottom line
Oct 29, 2012
-
Introducing and Sustaining a Continuous Improvement Program in Mines and SmeltersBy M Costa, L Polizzi
Process optimisation and continuous improvement are usually acknowledged when making a process more effective, efficient and transparent. During the last few decades, thousands of companies around the
Sep 1, 2014