Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Modern Asset Pricing - A Valuable Real Option Complement to Discounted Cash Flow Modelling of Mining Projects

    By R Garzon

    For resources projects with healthy net present value (NPV) and low cash flow volatility, conventional discounted cash flow (DCF) analysis will continue to provide the dominant investment decision-mak

    Jan 1, 2007

  • AUSIMM
    Design of a Carbon-in-Pulp Plant from the Engineering Company Viewpoint

    The process of establishing the design criteria is the key step in commencing a new project.. The method for establishing design criteria and translating them to a workable plant design is describe

    Jan 1, 1982

  • AUSIMM
    Oxygen Potentials in Molten Metals, Mattes and Gases

    According to our experimental results, the following oxygen probe recommended, that is, the magnesia stabilized zirconia was employed as a solid electrolyte and Fe.FexO solid elect- rode was used as

    Jan 1, 1980

  • AUSIMM
    Optimisation Challenges in Underground Mine Planning and Design

    Underground mine planning is characterised by a series of designs, starting with prefeasibility and culminating in operational. Information on the mineralisation and geotechnical conditions is availab

    Dec 6, 2010

  • AUSIMM
    Outline of Electrical Plant Layout Mount Isa Mines Ltd

    By Edmonds G. A

    The power station went into operation in 1931, when the installed capacity was 12,500 kVA. with a loading of 4,000 kVA. In 1936 the loading increased to 6,750 kVA. which necessitated the addition of a

    Jan 1, 1953

  • AUSIMM
    Mineralisation of the Morobe Goldfield, Morobe Province, Papua New Guinea

    By B A. Mowat, T M. Leach

    The Morobe Goldfield inPapua New Guinea has produced in excess of 120 tonnes of gold from predominantly alluvial sources. Hardrock gold has been mined historically at Wau (23 t) and Edie Creek (4 t) a

    Jan 1, 1995

  • AUSIMM
    Developing a Copper Mine in a Developing Country

    Designing and constructing OxianaÆs Sepon gold and copper operations in one of the most remote areas in Laos has been a great achievement; one which was recognised by the engineering industryÆs highes

    Jan 1, 2006

  • AUSIMM
    The CENIM_LNETI Process for Zinc Recovery from Complex Sulphides

    By Amer S, Novais A. Q, Limpo Gil J

    A proprietary hydrometallurgical ammonium chloride process for the recovery of not only zinc, but also copper, lead and silver from sulphidic zinc-rich concentrates has been developed at bench scale

    Jan 1, 1993

  • AUSIMM
    Performance of the IsaMills in the George Fisher Flowsheet

    By M Gao

    Six new IsaMills were installed for the George Fisher flowsheet in the Lead/Zinc Concentrator of Mount Isa Mines to produce a product P80 as fine as seven microns. The objective was better liberation

    Jan 1, 2000

  • AUSIMM
    South-West Pacific Mineral Royality Regimes

    Almost all the countries of the south-west Pacific and the Australian states have recently completed or have commissioned mineral royalty reviews. The prime reasons for this widespread and consisten

    Jan 1, 1988

  • AUSIMM
    Metallurgical Characterisation of George Fisher Ore Textures and Implications for Ore Processing

    By Vink L, Johnson N. W, Mackenzie J, Young M. F, Johnston M, Landmark V

    The influence of ore textures on metallurgical behaviour is poorly understood for most ores. An alternative method for characterising ore textures and for determining the resulting implications on o

    Jan 1, 1998

  • AUSIMM
    Techno-economic implications of implementing novel reagents to improve fines recovery in mineral flotation

    By S Lowjun, I Verster, C A. Thomas, E Forbes, K Runge, G V. Franks

    Fine (<20 µm) valuable mineral particles are difficult to recover in conventional flotation circuits. (Trahar and Warren, 1976; Jameson, Nguyen and Ata, 2007; Kohmuench et al, 2018). This leads to a l

    Aug 24, 2022

  • AUSIMM
    Profit Drivers in the Open Cut Coal Industry

    The æProfit Driver ModelÆ is a tool which builds costs from first principles and integrates revenue, costs and physical mining parameters and, hence, can quantify the impact and leverage on profit. In

    Jan 1, 2000

  • AUSIMM
    Rational Longwall Layout Design Based on Numerical Stress Analysis

    By Klenowski

    Rational design of layouts for longwall operations is greatly facilitated by use of an accurate and economical method for predicting stresses and displacements. The displacement discontinuity meth

    Jan 1, 1988

  • AUSIMM
    The Use of Spill Data to Go Beyond Compliance Promotion for Mining Operations in Ontario, Canada

    By C Skublak

    The Government of Canada recently passed a new regulation to control the liquid discharges from metal mines in Canada. The Metal Mining Effluent Regulation of the Federal Fisheries Act will come into

    Jan 1, 2002

  • AUSIMM
    Modelling metal recovery by co-kriging the feed and concentrate masses of metal

    By P Dowd, A Adeli, C Xu, X Emery

    Geometallurgical modelling is increasingly being incorporated into mineral resource modelling and estimation as a means of increasing efficiency, decreasing operating costs and reducing risk in mining

    May 24, 2023

  • AUSIMM
    Integrated Hydro-Chemistry and Biological Studies Towards Understanding the Nature of Acid Rock Drainage Impacts for a Coal Mine on the West Coast of New Zealand

    By M Pizey, P Lindsay

    Coal mining has been occurring on the Stockton Plateau for over 100 years. As a result of both natural conditions and mining activities, surface water on the plateau is known to have low pH and elevat

    Jan 1, 2003

  • AUSIMM
    Risk Management Practices at Solid Energy New Zealand Limited

    Solid Energy New Zealand Limited (æSolid EnergyÆ) is a state-owned coal mining company, producing 4.0 Mtpa from a number of opencast and underground mines in the Huntly, West Coast and Southland regio

    Jan 1, 2003

  • AUSIMM
    Longwall Face Outputs Present æState of the ArtÆ -- Alternative Future Trends

    By Duncan GR

    Having passed through a number of previous phases the best longwall results in Australia have shown a significant increase in the last two years. The results expected from a longwall face can be es

    Jan 1, 1988

  • AUSIMM
    Large Open Pit Mining in Papua New Guinea

    Large scale open pit mining at Ok Tedi and Misima are described in this paper. The paper also presents the socio-political problems encountered in the construction, operation and waste disposal of hig

    Jan 1, 1992