Modern Asset Pricing - A Valuable Real Option Complement to Discounted Cash Flow Modelling of Mining ProjectsBy R Garzon
For resources projects with healthy net present value (NPV) and low cash flow volatility, conventional discounted cash flow (DCF) analysis will continue to provide the dominant investment decision-mak
Jan 1, 2007
-
Design of a Carbon-in-Pulp Plant from the Engineering Company ViewpointThe process of establishing the design criteria is the key step in commencing a new project.. The method for establishing design criteria and translating them to a workable plant design is describe
Jan 1, 1982
-
Oxygen Potentials in Molten Metals, Mattes and GasesAccording to our experimental results, the following oxygen probe recommended, that is, the magnesia stabilized zirconia was employed as a solid electrolyte and Fe.FexO solid elect- rode was used as
Jan 1, 1980
-
Optimisation Challenges in Underground Mine Planning and DesignUnderground mine planning is characterised by a series of designs, starting with prefeasibility and culminating in operational. Information on the mineralisation and geotechnical conditions is availab
Dec 6, 2010
-
Outline of Electrical Plant Layout Mount Isa Mines LtdBy Edmonds G. A
The power station went into operation in 1931, when the installed capacity was 12,500 kVA. with a loading of 4,000 kVA. In 1936 the loading increased to 6,750 kVA. which necessitated the addition of a
Jan 1, 1953
-
Mineralisation of the Morobe Goldfield, Morobe Province, Papua New GuineaBy B A. Mowat, T M. Leach
The Morobe Goldfield inPapua New Guinea has produced in excess of 120 tonnes of gold from predominantly alluvial sources. Hardrock gold has been mined historically at Wau (23 t) and Edie Creek (4 t) a
Jan 1, 1995
-
Developing a Copper Mine in a Developing CountryDesigning and constructing OxianaÆs Sepon gold and copper operations in one of the most remote areas in Laos has been a great achievement; one which was recognised by the engineering industryÆs highes
Jan 1, 2006
-
The CENIM_LNETI Process for Zinc Recovery from Complex SulphidesBy Amer S, Novais A. Q, Limpo Gil J
A proprietary hydrometallurgical ammonium chloride process for the recovery of not only zinc, but also copper, lead and silver from sulphidic zinc-rich concentrates has been developed at bench scale
Jan 1, 1993
-
Performance of the IsaMills in the George Fisher FlowsheetBy M Gao
Six new IsaMills were installed for the George Fisher flowsheet in the Lead/Zinc Concentrator of Mount Isa Mines to produce a product P80 as fine as seven microns. The objective was better liberation
Jan 1, 2000
-
South-West Pacific Mineral Royality RegimesAlmost all the countries of the south-west Pacific and the Australian states have recently completed or have commissioned mineral royalty reviews. The prime reasons for this widespread and consisten
Jan 1, 1988
-
Metallurgical Characterisation of George Fisher Ore Textures and Implications for Ore ProcessingBy Vink L, Johnson N. W, Mackenzie J, Young M. F, Johnston M, Landmark V
The influence of ore textures on metallurgical behaviour is poorly understood for most ores. An alternative method for characterising ore textures and for determining the resulting implications on o
Jan 1, 1998
-
Techno-economic implications of implementing novel reagents to improve fines recovery in mineral flotationBy S Lowjun, I Verster, C A. Thomas, E Forbes, K Runge, G V. Franks
Fine (<20 µm) valuable mineral particles are difficult to recover in conventional flotation circuits. (Trahar and Warren, 1976; Jameson, Nguyen and Ata, 2007; Kohmuench et al, 2018). This leads to a l
Aug 24, 2022
-
Profit Drivers in the Open Cut Coal IndustryThe æProfit Driver ModelÆ is a tool which builds costs from first principles and integrates revenue, costs and physical mining parameters and, hence, can quantify the impact and leverage on profit. In
Jan 1, 2000
-
Rational Longwall Layout Design Based on Numerical Stress AnalysisBy Klenowski
Rational design of layouts for longwall operations is greatly facilitated by use of an accurate and economical method for predicting stresses and displacements. The displacement discontinuity meth
Jan 1, 1988
-
The Use of Spill Data to Go Beyond Compliance Promotion for Mining Operations in Ontario, CanadaBy C Skublak
The Government of Canada recently passed a new regulation to control the liquid discharges from metal mines in Canada. The Metal Mining Effluent Regulation of the Federal Fisheries Act will come into
Jan 1, 2002
-
Modelling metal recovery by co-kriging the feed and concentrate masses of metalBy P Dowd, A Adeli, C Xu, X Emery
Geometallurgical modelling is increasingly being incorporated into mineral resource modelling and estimation as a means of increasing efficiency, decreasing operating costs and reducing risk in mining
May 24, 2023
-
Integrated Hydro-Chemistry and Biological Studies Towards Understanding the Nature of Acid Rock Drainage Impacts for a Coal Mine on the West Coast of New ZealandBy M Pizey, P Lindsay
Coal mining has been occurring on the Stockton Plateau for over 100 years. As a result of both natural conditions and mining activities, surface water on the plateau is known to have low pH and elevat
Jan 1, 2003
-
Risk Management Practices at Solid Energy New Zealand LimitedSolid Energy New Zealand Limited (æSolid EnergyÆ) is a state-owned coal mining company, producing 4.0 Mtpa from a number of opencast and underground mines in the Huntly, West Coast and Southland regio
Jan 1, 2003
-
Longwall Face Outputs Present æState of the ArtÆ -- Alternative Future TrendsBy Duncan GR
Having passed through a number of previous phases the best longwall results in Australia have shown a significant increase in the last two years. The results expected from a longwall face can be es
Jan 1, 1988
-
Large Open Pit Mining in Papua New GuineaLarge scale open pit mining at Ok Tedi and Misima are described in this paper. The paper also presents the socio-political problems encountered in the construction, operation and waste disposal of hig
Jan 1, 1992