Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Minister's Address

    The Honourable Neil Pickard has been in Parliament for something like sixteen years. He was Minister for Education in 1976, served as Shadow Minister in a number of portfolio areas while his party w

    Jan 1, 1989

  • AUSIMM
    Optimisation of Rotary Drilling

    Optimising drill performance has always been a primary goal of drilling and blasting managers. Improving drilling rates and utilisation will ultimately drive the cost per foot or metre downward. Ad

    Jan 1, 1995

  • AUSIMM
    Making the Most of Blast Measurements

    By D P. Blair

    The theme of this conference is blasting productivity. This article only considers the technology aspect of this theme, and in particular, the collection and analysis of experimental data. In many cas

    Nov 8, 2011

  • AUSIMM
    Sedimentary Structures in the Metamorphic Rocks and Orebodies of Broken Hill

    Undisturbed minor sedimentary structures-cross-bedding, ripplemarking, scour-and-fill, slumping-are present in most of the rock types in the Willyama Series of the Broken Hill district and in the oreb

    Jan 1, 1959

  • AUSIMM
    Mineral Sands - An Overview of the Industry

    Mineral sands are different to almost any other commodity; however, it shares similarities with other commodity types, such as the importance of quality constraints of iron ore and coal or the importa

    Jan 1, 2009

  • AUSIMM
    An Approach to the Evaluation and Control of Blast Induced Damage

    By Scott A

    The object of most blasting operations is to destroy the insitu structure of the rock mass so that mechanical equipment can efficiently excavate the rock fragments. In achieving this objective the b

    Jan 1, 1990

  • AUSIMM
    New online/atline splitter designs for laboratory automation – feasibility results

    By A Hollweg, K H. Esbensen, M Lischka

    Two new splitter designs for intercepting moving streams of matter are presented, the variable cross-stream splitter (vCSS) and the rotary stream splitter (RSS), which are intended for implementation

    May 9, 2017

  • AUSIMM
    What Causes Cracks in Rock Blasting?

    By S Nie, I Bergqvist, F Ouchterlony

    In blasting, a few or many cracks are driven from the borehole into the rock. But what causes the cracks? The most common theory of breakage consists of two stages; first the shock wave causes radial

    Jan 1, 2001

  • AUSIMM
    Contribution to the Study of the Mount Isa Copper Orebodies

    An investigation was made into the mineralogical characteristics of the upper portions of the 650 and 750 copper lodes. The investigation was based on a comprehensive suite of geological specimens rep

    Jan 1, 1961

  • AUSIMM
    Borehole Ropeways at No 2 Ore Shaft, Mount Isa Mines Limited

    The No. 2 Ore-shaft, at Mount Isa Mines Limited, involving the use of boreholes as ropeways for the upper portion thereof, constitutes, we believe, a unique feature in hoisting installations. The bore

    Jan 1, 1939

  • AUSIMM
    Mine Process Simulation ù A Strategic Tool as Well as a Process Optimisation Tool

    Mining is a high risk, high capital and potentially high reward undertaking. A large proportion of the risk comes from a lack of definition of the orebody (which also provides some of the potential) a

    Jan 1, 2003

  • AUSIMM
    Economical and Environmental Operation of Open Cut Mines

    Mining is a high risk, high capital and potentially high reward undertaking. A large proportion of the risk comes from a lack of definition of the orebody (which also provides some of the potential) a

    Jan 1, 2003

  • AUSIMM
    Effect of Ore Type and Size Distribution on the Granulating Characteristics of Iron Ore

    By J Manuel, R Muddle

    The demand for iron ore has increased significantly in recent years, with new iron ore sources being mined to meet this demand. As the composition of sinter blends changes with the availability and co

    Jan 1, 2005

  • AUSIMM
    Sampling for the Boom - An Iron Ore Perspective

    The Pilbara iron ore industry has seen rapid growth over the last five years and is now bracing itself for another expansion which will take its seaborne trade to beyond 500 Mt/a. To effectively utili

    Jan 1, 2008

  • AUSIMM
    Mineral Exploration Management in Australia

    Mineral exploration management has undergone major changes particularly in the last decade. Parallel to these changes in management, and partially responsible for them, have been the changes in gov

    Jan 1, 1974

  • AUSIMM
    DynoMiner<sup>TM</sup> APS Underground Explosive Loading System

    This paper introduces a new, safer bulk emulsion loading system for underground mining operations. The features and benefits of the equipment, along with the use of Dyno Nobel Inc patented gassed emul

    Jan 1, 2004

  • AUSIMM
    Some Aspects of the Genesis of the Iron Duke Iron Orebody and Associated Rocks

    There is an alternative theory of the high grade orebodies of the Middleback Group, based on the primary nature of the high grade ores in an area of carbonate deposition, with lesser amounts of silice

    Jan 1, 1963

  • AUSIMM
    Ranger - The 5 Star Mine

    By Resta S. A

    Energy Resources of Australia Ltd - Ranger Mine is located about 255 kilometres east of Darwin in the Alligator Rivers Region of the Northern Territory. The Ranger project is surrounded by Kakadu Na

    Jan 1, 1994

  • AUSIMM
    Miwah Prospect High Sulphidation Au-Cu Mineralisation, Northern Sumatra, Indonesia (4b0407ac-b0c0-4d41-9954-f2633d517077)

    By Fleming GJ

    The Miwah prospect lies on the dilational 070¦ trending Miwah Lineament near its intersection with northerly oriented fractures within Pliocene volcanic rocks exposed between a NW trending segment of

    Jan 1, 1995

  • AUSIMM
    Operation of a Rapped Sieve Bend

    By Firth B. A

    The classification performance of a Dutch State Mines (DSM) Rapped Sieve Bend has been investigated in a series of experiments. Coal slurries of a nominal 0.5 mm size were classified in the separation

    Jan 1, 1983