Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    State-of-the-Art in Tunnel Ventilation Systems Design – Applicable Options to Meet Fire-Life-Safety Code Requirements

    By P C. Miclea

    Transportation networks extend every day around the world, requiring safe and well-maintained structures for efficiency and for users’ safety. Due to specific features of the infrastructure, such as l

    Mar 8, 2011

  • AUSIMM
    Tropicana Gold Mine - Mitigating the Challenges of a Mining Start-up

    By S Lloyd, J Chow, S Fitzpatrick, D Greenup

    The Tropicana deposit was discovered in 2005 after AngloGold Ashanti followed up an unexplained gold-in-soil anomaly. Discovered in a remote, barely-explored area of Western Australia not previously t

    Sep 26, 2013

  • AUSIMM
    Changing the Ground Support in Cemented Hydraulic Backfill at CSA Mine

    CSA mine, which is a deep level copper operation, located 12 km north of Cobar, NSW, currently uses a top down stoping method, utilising cemented hydraulic backfill (CHF) to fill and stabilise the sto

    Nov 25, 2010

  • AUSIMM
    Automated Production Data Collection and Reporting at a Large Open Pit Mine

    By T Mattiske

    The Fimiston Open Pit (commonly referred to as the æSuper PitÆ) is a part of the Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) operation in Kalgoorlie-Boulder. KCGM manages the Fimiston Open Pit,

    Jan 1, 2002

  • AUSIMM
    The Use of High-Water Rapid-Solidifying Material as Backfill Binder and its Application in Metal Mines

    By Liu Wenyong, Huang Yucheng, Yang Ba

    High-water rapid-solidifying material, called æhigh-water materialÆ, is a new material developed by the authors over many years. The material can solidify nine times its volume of water into solid. Th

    Jan 1, 1998

  • AUSIMM
    Management of Health and Safety in Tunnelling – Application of Australian Coal Mining Knowledge

    By G Marling, A Calderon, J Harris, P Kirsch, M Shi, D Sprott, A Kirsch

    Large-scale infrastructure construction needs to comprehensively manage risks that can impact the health and well-being of many people, from workers (temporary, contracted or full time), to families a

    Sep 17, 2014

  • AUSIMM
    The Use of Geotechnical Instrumentation to Optimise an Engineered Mine Design at Beaconsfield Gold Mine, Tasmania

    By P B. Hills, R J. Walton

    Geotechnical instrumentation has been implemented as a key step for monitoring and optimising an engineered mine design for managing seismicity at the Beaconsfield Gold Mine. Measurements of displacem

    Jan 1, 2008

  • AUSIMM
    Regulatory Perspective ù Development of Closure Plan With Adequate Financial Assurance for the Protection of Ground Water Quality at the Chino Copper Mine

    By K Myers

    Since the mid-1990s, the Chino Mine Facility (Chino) located near Silver City, New Mexico has been developing a closure plan with financial assurance to protect water quality, as required by State reg

    Jan 1, 2003

  • AUSIMM
    Spatial distribution of geohazards in Western Australia and Imposed risks to tailings storage facility inventory

    By J Penman, N Turner, H Liu

    This paper aims to present a snapshot of the risk profile for tailings storage facilities within Western Australia by comparing the spatial distribution of known facilities against common geohazards s

    Jul 1, 2021

  • AUSIMM
    The HydroFloat Separator ù A New Technology for Recovering Coarse Phosphate Sands

    By T C. Westerfield, G, M J. Mankosa

    An innovative separator known as the HydroFloat cell has been developed specifically for the upgrading of coarse particles that are difficult to recover using conventional flotation cells. The novel c

    Jan 1, 2005

  • AUSIMM
    Razorback Iron Ore Project – A New Iron District to Meet the Growing Demand of an Iron Hungry World

    By M Flis

    The Razorback Iron Ore Project is a high tonnage, low-grade magnetite deposit that defines a new iron ore district in South Australia. Known since the 1960s, the deposit has come into its own as the i

    Jul 11, 2011

  • AUSIMM
    How the Global Experience and Reach of Tunnelling’s True Multinationals Helped Solve a Road Tunnel Fit-out Challenge

    By S Strong, L I. Sanz Vivanco, T Brown

    One of the most significant technical and practical challenges facing the tunnel construction team on the Legacy Way road tunnel project in Brisbane, Australia was how to erect the prestressed precast

    Sep 17, 2014

  • AUSIMM
    Fast, Safe and Fully Mechanised Installation of High-Tensile Chain-Link Mesh for Underground Support

    By V Louchnikov

    Ever increasing depth of mineral extraction presents a challenging environment for hard rock underground mines. High in situ stresses and associated seismicity with potential rock burst hazards are th

    Mar 21, 2011

  • AUSIMM
    ExEx 2000 SMARTDET Electronic Initiation System - An Effective, Easy to Use, Inititation System

    Electronic Detonators have made significant strides over the last few years, both in quality of product and performance in different blast applications. The precision and flexibility of the SMARTDET u

    Jan 1, 1999

  • AUSIMM
    Improved mining recovery with bulk ore sorting and MR technology

    By C Beal, S Singh

    Sensor-based bulk ore sorting is a form of preconcentration that autonomously measures and physically separates discrete bulk ‘pods’ of run of mine (‘ROM’) or primary crushed material. This case study

    Nov 10, 2020

  • AUSIMM
    Stability of Hydraulic Backfill Barricades

    Hydraulic backfill is generally retained in stopes using permeable barricades. Mitchell et al (1975), Mitchell (1992) and Grice (1989) have shown that under normal drainage conditions, barricades expe

    Jan 1, 1998

  • AUSIMM
    Metallurgical Performance of Outotec’s e500 TankCell® at the Kevitsa Cu-Ni-PGE Concentrator

    By B Murphy, T Mattsson, R Crosbie, T Maksimainen

    "An Outotec e500 TankCell, with 500 m³ of actual flotation volume, was commissioned at the Kevitsa Cu-Ni-PGE concentrator in northern Finland during 2014. This flotation cell was implemented at t

    Oct 10, 2016

  • AUSIMM
    Tailings Disposal Costs ù The Hidden Design Parameter

    The purpose of this paper is to look at the costs of tailings disposal, and in particular the comparative costs of different disposal methods in different situations. Costs are often the hidden design

    Jan 1, 2000

  • AUSIMM
    Use of a Pre-existing Microseismic Monitoring System to Detect Trapped Miners (with Reflections on Beaconsfield 2006)

    By D Cumming-Potvin

    Incidents that trap miners in underground mines have serious consequences for the miners and the mine operators involved. It is of utmost importance that mine operators utilise all available tools whe

    Mar 24, 2014

  • AUSIMM
    The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case Study

    By B Jones, M Chappell

    Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the

    Sep 17, 2014