Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Reserve Data for Project Planning

    Efficient project planning during the detailed feasibility to final engineering stages of a project requires not only the accurate prediction of the grade, tonnes and recovery, but their degree of v

    Jan 1, 1987

  • AUSIMM
    The Application Of Hedging In Mine Finance (44d6138b-53d1-46ee-a445-2514cd4ee02b)

    Future metal prices play a direct role in both the economic evaluation and short to medium planning of a mine scheduling sequence. It is difficult to predict with accuracy the future price of vola

    Jan 1, 1980

  • AUSIMM
    Recent Developments in Australian Shaft Excavation Practice ù Raise Bored Shafts in Highly Stressed Rock

    By D Sidea

    There has been increased focus in Australia on large diameter raise boring for ventilation shafts and orepass excavation in good quality, brittle, highly stressed rock. As mining in many parts of Aust

    Jan 1, 2005

  • AUSIMM
    Practical Applications of a Blast Furnace Stack Permeability Model

    By Peak DJ, Kearton CJ

    Following a summary of the development of a BF model using aerodynamic relationship and bulk fines index a blast furnace policy model is presented complete with the development of nomograms and featu

    Jan 1, 1975

  • AUSIMM
    The New Central Crushing Plant at Lake View and star Limited

    To follow the development of the central crushing plant it is necessary briefly to outline the history of the Lake View and Star Limited. This Company, when first constituted, took over the properties

    Jan 1, 1948

  • AUSIMM
    Design of Yield Pillars in the Southern Coal Field of New South Wales

    By Bhattacharyya AK

    With increasing demand for more efficient production from the underground coal mines in the Southern Coalfields- of New South Wales, their design and operational aspects are constantly being review

    Jan 1, 1992

  • AUSIMM
    Critical risk management, good, but not good enough

    By D L. Head

    Critical risk management (CRM) has become one of the latest safety buzz terms in mining. Everyone seems to be doing it, everyone seems to know about it, yet we are still having fatalities in our indus

    May 5, 2022

  • AUSIMM
    The Use of Satellite (Landsat) Imagery in Mineral Exploration

    Remote sensing, in general, is the recording of light and heat from a planet's surface within a certain range of the electromagnetic spectrum. For the Earth, systems capable of this recording are

    Jan 1, 1977

  • AUSIMM
    The Geology of the Mesel Sediment-Hosted Gold Deposit, North Sulawesi, Indonesia (29cafc7f-df45-41c9-a3e9-70dac885efa7)

    By Lauricella P. F, Hendri D

    In the Mesel sediment-hosted disseminated gold deposit, the spatial distribution of hydrothermal alteration is controlled by steeply dipping faults and shallowly dipping lithologies. Hydrothermal alt

    Jan 1, 1995

  • AUSIMM
    Refining of Hot Metal with Na2CO3

    By Kajioka H, Nakamura Y

    Na2CO3 is a powerful flux for both dephosphorization and desulphurization in oxidizing atmospheres. In order to study refining with Na2CO3 and the nature of the Na2CO3 slag itself, hot metal (4Kg)

    Jan 1, 1980

  • AUSIMM
    Timing and Geodynamic Setting of the Late Palaeozoic Polymetallic Mineralisation in Chinese North-western Tianshan – Insights from Geochronology and Petrogenesis of Granitoids

    By L-B Fu and J Tan, J H. Wei, N Tian

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Kendenggaoer-Kuokuqueke region lies in the western part of Chinese North-western Tiansh

    Mar 18, 2015

  • AUSIMM
    Mining Automation

    Mining Automation By Professor Hugh Durrant-Whyte, Australian Centre for Field Robotics and Centre for Mining Technology and Equipment, Department of Mechanical and Mechatronic Engineering, The Unive

    Jan 1, 1997

  • AUSIMM
    Coal Production Scheduling Optimisation of Single Seam Open-Cast Mining

    By E Kozan

    The paper presents new developments of the methodology of open pit coal production scheduling optimisation. They deal with the specific features of the exploitation of single coal seam and utilisation

    Jan 1, 2003

  • AUSIMM
    Paragenesis of Hydrothermal Minerals in the Rise and Shine Shear Zone, Otago Schist

    By D Craw

    The Rise and Shine Shear Zone is a mineralised low angle deformation zone traceable for at least 7 km through biotite zone schist of the Dunstan Range, central Otago. Rocks from the shear zone obtaine

    Jan 1, 2006

  • AUSIMM
    An On-Line Conveyor Burden Measurement System Using Computer Imaging Techniques

    By Tyson G. R

    A novel system has been developed using computer imaging techniques to make on-line measurements of material on a moving conveyor. Meas- urements of the mass or volume of conveyor materials are impor

    Jan 1, 1989

  • AUSIMM
    The Challenges of Determining Intermine Flow in the Witbank Coalfield of South Africa

    By A Havenga, F, J Hough, R Grobbelaar

    After the closure of mines they naturally start to fill up with water. As a result, hydraulic gradients develop between adjacent mines and different hydraulic water pressures are exerted onto peripher

    Jan 1, 2003

  • AUSIMM
    Metal Allocation and Grade Control at Kambalda NIckel Mines

    The nickel operations at Kambalda consist of mining thin massive to disseminated Ni sulphide orebodies from 10 individual mines of variable grade.Daily sampling involves visual estimation of the grade

    Jan 1, 1990

  • AUSIMM
    Blast Engineering ù An Explosive Career

    This presentation is a 20 minute snippet of my professional career, and my progression in the mining industry, from a lazy uni student to an up-and-coming blast engineer in the middle of a mining boom

    Jan 1, 2006

  • AUSIMM
    Three-Chamber Pipe Feeder in Underground Gold Mine Applications

    By Geisler P, Sutherland P

    The technical limits for high-pressure transport of large particle solids by means of sludge pumps, piston pumps or the like lead to the development of the pipe-feeder system. The pipe-feeder is a t

    Jan 1, 1991

  • AUSIMM
    Geology of the Enterprise Mine, Pine Creek, Northern Territory

    Gold mineralisation at the Enterprise Mine, 230 km south of Darwin, occurs within folded and metamorphosed sediments of the Lower Proterozoic Burrell Creek Formation adjacent to the Cullen Granite

    Jan 1, 1984