Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Geomet Curve – A Model for Implementation of Geometallurgy

    By J Vann

    Geometallurgy is inherently multidisciplinary and it gains its power to deliver improved outcomes for the minerals industry by bridging silos between disciplines. This cross-disciplinary approach unlo

    Sep 5, 2011

  • AUSIMM
    Machine learning in resource geology – why data quality is critical

    By P M. Hetherington, F A. Pym, M P. Murphy, K E. Crook

    Consultants in the mining industry have the opportunity to visit interesting deposits all over the world. Each deposit has its own set of challenges to face when it comes to defining and understanding

    Mar 22, 2022

  • AUSIMM
    It’s all about People - Abstract

    By K D. Tuckwell

    The Treasurer, the Hon Wayne Swan, has nominated ‘maximising our advantages’ from ‘Mining Boom Mark II’ as the focus of the 2011/2012 Australian Budget. Australia therefore requires a bolder and bette

    Nov 22, 2011

  • AUSIMM
    E26 Lift 1 North block cave development and construction

    By R Cunningham

    The E26 Lift 1 North Project took 37 months from the approval on 1st January 2019 to the commencement of production on 1st March 2022. This was five months ahead of the feasibility plan. When compared

    Mar 29, 2023

  • AUSIMM
    Risk assessment tool for mines using diesel-powered mobile equipment

    By A Reid, A W. Musk, O Jones

    In this paper, the authors attempt to bridge the gap that currently exists between the duty-of-care responsibilities of underground mining industry personnel, and the multifaceted health challenges fa

    Oct 16, 2017

  • AUSIMM
    Prefeasibility Testing of Gold Ore Samples Prior to CIP Plant Design

    By K B. Quast

    During the prefeasibility stage of the mining cycle for a gold deposit, an evaluation of the ore leaching characteristics from various defined areas is essential prior to plant design. There are a num

    Jan 1, 1998

  • AUSIMM
    Influence of Vertical Pile Loading on Existing Tunnel Lining in Soft Clay

    By R Ayothiraman

    Tunnel excavation may induce adverse effects on nearby existing structures/foundations in urban areas. Accurate prediction of tunnelling effects on pile foundations of nearby structures in the urban e

    Mar 8, 2011

  • AUSIMM
    Simulation Modelling of Mining Systems

    This paper discusses the requirements for a successful simulation modelling study, and the steps involved in the modelling process. Advantages and disadvantages of simulation are described, and a case

    Jan 1, 2000

  • AUSIMM
    How to Manage Machine Duty to Sustain High Production Rates

    By P Meehan, R McAree, Z Guan

    Equipment maintenance is 30 - 50 per cent of the operating costs for a typical mining company. While this is substantial, its importance is beyond its significance as a cost heading. Modern mining req

    Jan 1, 2002

  • AUSIMM
    The Application of Ausmelt's AM28 Alkyl Hydroxamate Flotation Reagent to Fox ResourcesÆ West Whundo Copper Ore at Radio Hill, Western Australia

    By K Lee, L Mann, J Bygrave, G Sheldon

    Ausmelt is supplying commercial quantities of an alkyl hydroxamate flotation collector AM28 for flotation of oxide and supergene base metal ores and tailings. AM28 is a non-hazardous product used as a

    Jan 1, 2007

  • AUSIMM
    The Influence of Surface Geometry on the Load Transfer Mechanisms of Grouted Bolts - A Laboratory Study

    By B Indraratna, A Dey

    The surface geometry of a rock bolt plays a very important role in the rock/resin/bolt load transfer mechanism. Very little work has so far been reported on the influence of the bolt surface geometry

    Jan 1, 2000

  • AUSIMM
    Ventilation Design for Xstrata Copper's Ernest Henry Underground Project Prefeasibility Study

    The Ernest Henry Mine is an open pit copper-gold mining operation located in north-west Queensland, Australia. It is owned and operated by Xstrata Copper with a current concentrator throughput of appr

    Jan 1, 2008

  • AUSIMM
    Technological Solution to Improvement in PGM Recovery, Upgrade Ratio and Cr<sub>2</sub>O<sub>3</sub> Reduction of UG 2 Ore

    By A N. Terblanche, D S. Smit

    The paper discusses the improvements achieved after an external sparger flotation column, 1.42 m diameter by 9.5 m high, was installed as a re-recleaner unit at the Northam Platinum LtdÆs UG 2 plant i

    Jan 1, 2005

  • AUSIMM
    Measuring the Effectiveness of Change through Best Practice Reconciliation

    By G Pattenden, R Hargreaves, P Pettit

    "Even with the cyclic nature of mining, when it comes down to it, the bottom line is that whatever direction the commodity market is going there is always a desire to improve the economics of an opera

    Nov 15, 2016

  • AUSIMM
    Wireframe-Free Geological Modelling – An Oxymoron or a Value Proposition?

    By E J. Cowan

    Efficiency demands that mine geologists devote the most time to tasks where they can have the biggest effect on production. One of the most time-consuming tasks is geological interpretation of the ore

    Aug 22, 2011

  • AUSIMM
    Sampling and blending in geoenvironmental campaigns – current practice and future opportunities

    By A Parbhakar-Fox, S C. Dominy

    The prediction of acid and metalliferous drainage (AMD) from mine waste materials is critically important during all stages of the mine value chain. However, to determine such geoenvironmental charact

    May 9, 2017

  • AUSIMM
    Modelling of Froth Transportation in an Outokumpu 3 m<sup>3</sup> Tank Cell

    By J-P Franzidis, E V. Manlap

    Froth transportation characteristics have a significant impact on the flotation recovery especially in large flotation cells. The probability of an attached particle being recovered into the concentra

    Jan 1, 2005

  • AUSIMM
    Assessing the volume change behaviour of red mud through laboratory and field testing

    By D J. Williams, A Shokouhi, A Naderian

    Extracting alumina from bauxite involves the production of fine-grained waste known as red mud. The highly alkaline red mud is usually neutralised by applying sea water, thickened to between 25% and 3

    Jul 23, 2018

  • AUSIMM
    Multi-Disciplinary Engineering Research and Development Skills for Mining û A Case Study

    By S Van Duin, I Porter

    This paper discusses how advanced manufacturing technology (AMT), which is fundamentally reliant on and developed via multi-disciplinary skills, has benefitted non-mining industries, and what lessons

    Sep 26, 2011

  • AUSIMM
    The Use of Psychometric, Thermodynamic and Transport Property Software in Mine Ventilation and Gas Drainage Calculations

    By T J. M Harvey

    This paper gives an overview of the ASHRAE LibHuAirProp, CoolProp and REFPROP software packages. These packages were predominantly developed for heating, refrigerating and air conditioning engineers a

    Aug 31, 2015