Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Paste Backfill for Enterprise MineBy D Morrison, P Goodman
The cycle time between adjacent stopes is critical to achieving the required production rate from 3500 Orebody; one of the Enterprise Mine orebodies. Current Mt Isa cemented fills require a 90-day cur
Jan 1, 1998
-
The use of the Main Ramp as a Mine Exhaust at the Kencana Mine, IndonesiaBy D J. Brake
Faced with the need to improve workplace conditions in both its development and production headings in its existing K1 orebody, as well as its new K Link and K2 orebodies, the Kencana mine in Indonesi
Mar 21, 2011
-
Building a Geometallurgical Model in Iron Ores using a Mineralogical Approach with Liberation DataBy F Minz, P Lamberg, A Mwanga, C Lund, C Wanhainen, M Amiri Parian, J Rosenkranz
A geometallurgical model is currently built in two different ways. The first and the most common way relies on geometallurgical testing, where a large number of samples are analysed for metallurgical
Sep 29, 2013
-
Battery Grade Manganese Dioxide From Risdon Anode MudA process was developed to produce electrolytic manganese dioxide, suitable for use in high quality dry cells, from Risdon anode mud. ImpurItIes present In the anode mud were removed prior to the elec
Jan 1, 1968
-
A Water Accounting Framework for the Australian Minerals IndustryBy C J. Moran
Given that the mining industry is committed to sustainable development principles and that Australia is experiencing changes to the regulatory environment that aim to modernise the water sector and en
Jan 1, 2009
-
Control and Monitoring of International Organization for Standardization Compliance for Industrial Sampling SystemsBy R Shaw, T T. Neidel, C Adams
Sampling equipment manufacturers endeavour to ensure that the mechanical equipment installed in sampling systems are designed and manufactured to adhere to the requirements of the International Organi
Jul 29, 2014
-
Characterising the Reasons for the Difference in Performance of Two Ore Blends in Early Processing at OZáMinerals Prominent Hill OperationBy D J. Bradshaw, E M. Wightman, C L. Evans, B Triffett
During the commissioning phase of Prominent Hill, periods of reduced recovery were experienced with higher-grade ore blends. This was unexpected and as part of the process to identify the cause, surve
Oct 29, 2012
-
"Development of a Synthetic Ore Deposit Model for Geometallurgy"By V Lishchuk, C Lund
"Geometallurgy aims to improve resource efficiency by creating a spatial model of an orebody in order to forecast ore processing behaviour. This enables calculation of the economic value of each ore b
Jun 15, 2016
-
Savage River Mines The World's First Long Distance Iron Ore Slurry PipelineBy Davis RA, Wasp EJ, Cowper NT
The transportation of solids by pipeline is not new. In 1891 a United States patent broadly covering a method of pumping coal with water was granted to W. C. Andrews. His pilot plant was constructed
Jan 1, 1969
-
Process development for the Mina Justa projectBy I Ritchie, A Johnston, D Yataco
Marcobre SAC (Marcobre) is developing the Mina Justa copper mine project, located in the Ica region of Peru. The Mina Justa IOCG orebody comprises of a sulfide mass overlain by an oxide cap with a sha
Sep 11, 2017
-
The Impact of Gravity Gold Recovery at Kalgoorlie Consolidated Gold MinesBy D Hillier, A Giblett, K Parker, V Ramsell
Kalgoorlie Consolidation Gold Mines (KCGM) operates the Kalgoorlie Super Pit open cut, Mt Charlotte underground mine, Fimiston process plant and Gidji Roaster facility for joint venture partners Newmo
Oct 29, 2012
-
Soft Computing Approach to Predict Blast-induced FlyrockBy N Gupta, R Trivedi, S Bhandari
Managing blasting operations in four mines surrounded by villages is a challenging task. This study aims to compare the blast-induced flyrock as observed in opencast mines by predicting flyrock distan
Aug 24, 2015
-
Reducing Mine Site Extreme Rainfall Vulnerability Using Climate-related Adaptation from Terrain Evaluation ResultsBy M Grigorescu, J H. Hodgkinson, M Khanal
The mining industry often needs to operate in remote or climatically harsh locations. The industry has recently been forced to deal with extreme conditions including floods, heatwaves and droughts. As
Jun 22, 2016
-
Dreams of Futures Past – Curating Post-mining LandscapesBy P A. Kirsch, A Hine
Mining is a major global industry that requires the moving of considerable volumes of earth and rock (overburden) to win the valuable ore prior to mineral extraction and processing. As a result of thi
Jul 16, 2014
-
High temperature characteristics of different types of blast furnace ferrous materialsBy S Hapugoda, A Edenton, L Lu
The blast furnace cohesive zone has a profound impact on hot metal productivity and quality, fuel consumption, operational stability and the lining life of the blast furnace. The high temperature prop
Nov 8, 2021
-
All-Flotation at North Broken Hill LimitedAuthor's Note: Since the paper on "All-Flotation at North Broken Hill Limited" was read and discussed, the metallurgical results obtained have conclusively justified the adoption of the
Jan 1, 1931
-
Optimising Flow in the Mining Value ChainBy A Dunne, R Kruger, H Coleman, P G. Laurens
External and internal challenges in mining are increasing the difficulty and complexity of operating mines. The external mining environment has a big impact on mining operations and is driving the foc
Jul 13, 2015
-
The Biokinetic Test as a Geometallurgical Indicator for Acid Rock Drainage PotentialsBy A K. B Opitz, M Becker, J L. Broadhurst
"One of the key drivers of geometallurgy is to define the ore characteristics and their variability to build a geometallurgical model. The inclusion of waste rock properties and their variability is j
Jun 15, 2016
-
The Buka Zinc Process - A Major Step Forward in Zinc Processing?By C R. Fountain, R J. Sinclair
The zinc industry is dominated by the electrolytic zinc (EZ) process. The EZ process has a low tolerance for impurities, resulting in tight concentrate specifications. Many mining companies sacrifice
Jan 1, 1998
-
El Teniente New Mine Level ProjectBy R Pozo, F Reyes
Codelco Chile is currently developing the El Teniente û New Mine Level Project (NMLP) in order to increase ore production by seeking to mine the ore deposit located under the current operational orebo
Jan 1, 2008