Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Regular Measurement Defines Upgrades on Scrubber ScreensBy R Wilson, S Luke, R Williams, B Freeburn
"In 2010, two McLanahan RSS14×50 scrubber screens were installed at Fortescue Metals Group’s (Fortescue) Christmas Creek site. By 2015, the trommel (screen) section had effectively reached the e
Oct 10, 2016
-
Telepresence – the application of remote control and automation technologies for increased safety and productivityBy J Cronin
For the last decade, we have read about the great technical innovation that is coming to the mining industry that will increase safety and productivity. There is consensus that it will be a technical
Oct 16, 2017
-
From Sublevel Stoping to Sublevel Caving at Rana Gruber, Norway – Rock Mechanical AspectsBy A M. Myrvang, B Nøst, N Q. Trinh, I S. B Bergh
The iron ore producer Rana Gruber AS is situated in northern Norway just below the Arctic Circle, and has been producing hematite and magnetite concentrates for more than 60 years. Since the late 1990
Nov 5, 2014
-
Ventilation considerations and modelling of lithium battery fires inunderground miningBy C M. Stewart
Lithium battery electric powered vehicles and machines (BEVs) continue to gain traction inunderground mining use, with predictions they will dominate the underground light and heavy vehicle fleets for
Oct 12, 2022
-
Environmental Impact Modelling for In Situ Leaching of UraniumBy A Roshal
It is anticipated that many future uranium mines in Australia will be using the in situ leaching mining process. It is fair to say that close to one third of uranium production will be generated by th
Jan 1, 2008
-
Pairing Magnetic and E-field through-the-Earth Communication Systems Based on Mine Site ConditionsBy S J. Schafrik, E S. Gilliland, E C. Jong, J Waynert, C W. Weiss
Two commercially available through-the-Earth (TTE) communications systems were evaluated at an active underground longwall mine in West Virginia. One system utilises magnetic field (H-field) antennae
Nov 4, 2015
-
From Face to Surface – a Fragmentation StudyBy A Gustafson, D Johansson, K Jonsson
The underground mining process, from in situ characteristics of the unmined rock mass to the final mill product with fully liberated minerals, consists of a chain of unit operations. Some of them infl
May 9, 2016
-
Latest fifth generation (Mk V) gyratory crushers with focus on safety and maintenance featuresBy W Malone, J Garrett
FLSmidth (FLS) has spent the last 15 years, working with customers and engineering houses to deliver innovative improvements in crusher safety, coupled with the latest, maintenance friendly, crusher d
Sep 18, 2023
-
Pre-Competitive Exploration Research in Australia û A 30 Year AssessmentBy May J. R
Exploration, including research, has fuelled the enormous expansion of the Australian mineral industry in the last three decades. Analysis of success and failure in exploration and research has the
Jan 1, 1992
-
Benchmarking Energy Efficiency ù A Case Study at Macraes Gold MineBy K Osten, N Scagliotta, G Lane
Oceana Gold (New Zealand) Limited operates the Macraes Gold Mine near Dunedin on the South Island of New Zealand. The orebody is mineralogically complex and comparatively low grade requiring a series
Jan 1, 2004
-
Applying Modular Transporters to Relocate Large Hydraulic ExcavatorsBy B Flynn, P Knights
Low-loaders or 'floats' for relocating equipment in surface mines are limited to a capacity of approximately 350 t. In the iron ore industry it is desirable to be able to rapidly relocate ex
Jan 1, 2009
-
Adding Copper Recovery and Acid Consumption Variables to the Geological Model of Quebrada BlancaBy R Schiller, E Chait
"Quebrada Blanca is a porphyry copper deposit located in the Eocene-Oligocene belt of Chilean Andes. Operation started in 1994 and original reserves for supergene mineralisation gave a life-of-mine (L
Jun 15, 2016
-
Evaluation of Exploration ProjectsIt is difficult to evaluate exploration properties in a manner that is transparent, repeatable and easily re-calculated to cater for different geological interpretations, but the risk-based assessment
Jan 1, 2007
-
A Study on the Impact of Utilising Sea Water for Wet Concentration of Beach Minerals Deposits on the Recovery and Quality of Ilmenite Produced by High Tension SeparationBy C Swamydas
VV Mineral (VVM) group of companies is the largest and the first private producer and exporter of beach sand mineral products in India. During 2010, the company produced and marketed around 750 000 to
Oct 5, 2011
-
Petroleum's Contribution to the Economic Progress of AustraliaAny Australian who knows of the poverty of the early settlers in the first few years following the arrival of Captain Arthur Phillip with his "first fleet" at Botany Bay must feel proud of the progres
Jan 1, 1962
-
Morro do Ouro Geological Model with a Metallurgical ViewBy Y Akiti, J Moller, E Esper, R Rugolo, A Pains
"Morro do Ouro Mine is a high tonnage/low-grade mine located in Paracatu, Minas Gerais State, Brazil. The mines move around 55 Mt of ore per year at an average grade of 0.4 g/t. The auriferous mineral
Sep 29, 2013
-
Parametric assessment of tailings liquefaction and earthquake induced embankment deformations using FLACBy B Ghahreman‐Nejad, M Munro
Design of embankment dams often requires seismic analyses, or an assessment of earthquakeinduced ground and dam movements. There are a large number of cases where earthquakes have triggered sliding an
Jul 1, 2021
-
Information Technology Applied to Real Time Mining Process: Information to ManageThe information age has definitely arrived and in fact has only begun to affect our business processes. Traditionally mining companies have been innovators and leaders with technology, but applying in
Jan 1, 2000
-
Research and Application of Total Tailings Backfill at Zhangmatun Iron Mine (163a2830-6e6a-4b23-b34c-e44378a86b18)By Aiming Z, Shenyi S, Xialei W
Zhangmatun Iron Mine is situated in the suburbs of Jinan city. Shandong, China. Because of surface environmental constraints, no suitable site can he selected to dispose of mill waste. The full mill
Jan 1, 1998
-
The Development of a Fan Range to Meet Increasingly Demanding Safety Criteria Inside TunnelsBy A G. Sheard
Fire safety requirements inside tunnels have become more demanding as tunnel designers consider the impact of potentially larger fires. Tunnel ventilation equipment is required to clear hot gases in t
Mar 8, 2011