Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Foundation of the Institute, and its First Ten Years

    When Matthew Flinders entered in his log `This land forms the South side of the large bight; and besides projecting beyond the coast line, and being a little higher than usual is remarkable for having

    Jan 1, 1993

  • AUSIMM
    Roll Production at the Steel Foundry B.H.P., Newcastle

    The facilities used and techniques employed in the manufacture of steel and iron rolls at the Steel Foundry, B.H.P., Iron & Steel Works, Newcastle are described.

    Jan 1, 1972

  • AUSIMM
    Mining the LG6 Chromitite Layer - A Comparison of Two Approaches

    Underlain by and intruded into the sedimentary rocks of the Transvaal Supergroup the Bushveld Complex is the largest known layered intrusion in the world and contains one of the richest ore deposits o

    Dec 6, 2010

  • AUSIMM
    Selection of Ore from Multiple Pits

    By J E. Everett

    When ore is being selected from a regularised block model, a common procedure is to accept as ore any block whose iron content exceeds a cut-off value, and whose content in each contaminant analyte is

    Aug 12, 2013

  • AUSIMM
    Modelling of the Ventilation System of a Deep Uranium Mine

    By S C. Bhowmik, R Gupta

    This paper presents the ventilation problem faced by Jaduguda uranium mine, operated up to a depth of 905 m. The first two stages of the mine workings are up to 555 m, which are nearly exhausted. The

    Jan 1, 2005

  • AUSIMM
    Design and Construction of the New Car Dumper Facility for the Dampier Port Upgrade Project

    By A Radici, M Attwill

    The Dampier Port Upgrade Project (DPU) involves an upgrade to Hamersley IronÆs Parker Point iron ore port facility at Dampier, Western Australia. The $US700 million DPU Project will increase Hamersley

    Jan 1, 2005

  • AUSIMM
    Strata Movement Associated WIH Longwall Mining

    By Hughson B

    A multi-wire borehole instrumentation system was used to monitor strata movement caused by a retreating longwall face at the Ellalong Colliery, situated in the Lower Hunter Valley in New South Wal

    Jan 1, 1987

  • AUSIMM
    The Computer Simulation of Climatic Conditions in Mines

    Increases in mechanisation and mining at greater depths are leading to additional problems of heat and humidity in many mines. As a result there is now an escalating demand for temperature predicti

    Jan 1, 1977

  • AUSIMM
    The Conditioning of Mine Air

    In recent years, wide consideration has had to be given to methods of improving the condition of the mine environment in many coal mines, and significant developments and changes have evolved. Thus

    Jan 1, 1983

  • AUSIMM
    A Model Study of the BHP New Zealand Steel Iron-Making Melter

    By Gregory O, Winters BI, Garlick C, Rogers H, Ye ZC

    BHP New Zealand Steel produces iron from titaniferous ironsand by a direct reduction process comprising multi- hearth furnaces/rotary kilns/electric iron melters. The electric iron melter is a six-in-

    Jan 1, 1995

  • AUSIMM
    Reopening the Golden Mile

    By Cleghorn JH

    Underground mining operations on Kalgoorlie's Golden Mile were suspended in 1976, suffering the combined effects of low gold prices and grades. A subsequent substantial increase in the gold price

    Jan 1, 1984

  • AUSIMM
    Sequential Mining Planning in Coal Mines Assisted by Microcomputers

    By Koppe J. C

    This paper describes the methodology developed to establish a sequentia mining plan applied to a coal mine, using computers. Firstly, isocontou. maps were generated from the drill holes and outcrop de

    Jan 1, 1993

  • AUSIMM
    Predicting the Performance of Continuous Leaching of Gold Bearing Ores

    By Corrans I. J, Yan D. S

    The CIP process for gold recovery has enjoyed widespread application in most gold-producing countries. The development of a mathematical model of the CIP process has value for use in process design,

    Jan 1, 1991

  • AUSIMM
    Ventilating Deep Mines - Time for a Rethink of Ventilation Design

    Underground mines in Australia and worldwide are extending to greater depths. The effect of depth brings a number of challenges to mining engineers including geotechnical, ventilation, haulage and sel

    Jan 1, 2008

  • AUSIMM
    Orebody Definition and Optimisation (Coal)

    Exploration of a coal deposit provides the data on which a range of mine plans can be developed during project feasibility. The stages of exploration use methods and procedures which initially outl

    Jan 1, 1997

  • AUSIMM
    Ultrastand - An Innovative Cable Bolt

    Cable bolts are being used more extensively by the mining industry for many different rock reinforcement applications. The configuration of these bolts has evolved over the last 20 years to meet the i

    Jan 1, 1992

  • AUSIMM
    Critical Comparison of Julius Kruttschnitt Mineral Research Centre (JKMRC) Blast Fragmentation Models

    By I Brunton

    Blast fragmentation can have a significant impact on the profitability of a mine. An optimum run of mine (ROM) size distribution is required to maximise the performance of downstream processes. If thi

    Jan 1, 2001

  • AUSIMM
    The Removal of Chloride from the Ammonium Sulphate Liquor of the Sherritt Gordon Process

    To reduce the corrosion of a stainless steel crystallizer, caused by accumulation of chloride impurity in the liquor during the crystallization of ammonium sulphate, a strongly basic anion exchange re

    Jan 1, 1976

  • AUSIMM
    Cemented Rockfill OptimisationùThe Rock Attrition Model and Fill Raise Orientation Effect

    By J Szymanski, S Planeta

    In pursuit of optimising the cemented rockfill system fragmentation of the aggregate, while travelling through the surface-to-underground aggregate transport raise, was investigated and a æfines estim

    Jan 1, 1998

  • AUSIMM
    Banking Needs for Project Development Financing (591555b9-102c-4033-a3e1-dcf0b636a120)

    Some only types of bank finance are appropriate for mining development, with conventional fixed rate finance having significant limitations of flexibility. New, innovative and flexible instruments

    Jan 1, 1983