Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimisation of Excavator Performance When Mining Complex Polymetallic Ores

    By U Dzharlkaganov, B Bekmurzayevand M

    The principle conception is presented of timely planning of winning operations in complex-structural blocks and faces in week-24-hourly regime. For adequate description of complex interconnections of

    Jan 1, 2003

  • AUSIMM
    Rapid Sealing with Parachute Stoppings

    By Buizen M, Eagleton A. C

    The results of calibration trials conducted on parachute stoppings both overseas and in Australia under a recently completed NERD&DC grant, are presented. Applications of parachute stoppings, for

    Jan 1, 1988

  • AUSIMM
    Mechanised Shields for Trenchless Sewer Construction in Singapore

    By Musa MA

    Tunnel excavation for sewer construction long remained a labour intensive, hazardous and costly operation. Even with the of mechanical and semi-mechanical shields for tunnel excavation, many problems

    Jan 1, 1993

  • AUSIMM
    Stress Field and Cenozoic Tectonics of North Vietnam

    By Tapponnier P

    In North Vietnam, large ductile shear zones are observed along the Red river fault and the Dienbien fault. Left-lateral sense of the Red river shear zone is related to the direction of shortening E-W.

    Jan 1, 1990

  • AUSIMM
    An Evaluation of the Effect of Multiple Grinding and Flotation Stages on Flotation Performance of a Platinum-Bearing Ore

    By M Harris, C Goodall, B Knopjes

    The objective of this work was to investigate the effect of milling and flotation circuit configuration on flotation performance of platinum-bearing ore from the UG2 reef of the Bushveld Igneous Compl

    Jan 1, 2005

  • AUSIMM
    Stratigraphic and Structural Setting of Iron Mineralisation at E Deposit (East), Area C, Hamersley Province, Western Australia

    E Deposit is located at BHP BillitonÆs Area C iron ore operations in the central region of the Hamersley Province, Western Australia. It is hosted by the Marra Mamba Iron Formation, the lowermost unit

    Jan 1, 2007

  • AUSIMM
    The Management of Minewater Salinity in Ballarat

    By Sharmil Markar M

    Ballarat Goldfields Limited is currently re-opening the old workings of the East Ballarat Goldfield which contain an estimated 1800 ML of groundwater. The disposal of this 'minewater' was of

    Jan 1, 1990

  • AUSIMM
    Experimental Galleries

    There is no other effective way for study ing firedamp and coaldust explosions than to produce controlled explosions in a pre-monitor- ed environment - either mine openings kept for the purpose, or

    Jan 1, 1981

  • AUSIMM
    Some Consideration on Tunnel Excavation Methods in Mudstone Strata

    By Yagi Y

    The double track railway tunnel, called the Second Shirasaka Tunnel is being constructed under the supervision of Japanese PTational Rail- ways (JNR) in the tertiary soft rock strata in order to spe

    Jan 1, 1987

  • AUSIMM
    Underground Mine Communication Systems

    By Zenari L, Kent D

    As our mines introduce more sophisticated production technology into their operations, the dependence on communication systems is markedly increased to allow the management of the technology. Howev

    Jan 1, 1997

  • AUSIMM
    History and Present Operation of the Heavy Medium Separation Plant at Renison Limited, Tasmania

    In 1972, metallurgical testwork on Renison ore indicated a significant proportion of low specific gravity, tin-barren material ideally suited to heavy medium separation (HMS). Further technical an

    Jan 1, 1978

  • AUSIMM
    Sumps Aids The Broken Hill Proprietary Company Limited In Saxonvale Feasibility Study (4f6b06bb-7b16-41b9-9052-ce170d293140)

    By Kukla G. T

    A Seam deposit User oriented Mine Planning System (SUMPS) was developed by The Broken Hill Proprietary Company Limited (BHP) at its head office in Melbourne. It is one of the computer mine plannin

    Jan 1, 1980

  • AUSIMM
    Implementation and Feasibility of Remote Controlled Blast Hole Drilling at KCGM Æs Fimiston Open Pits

    By P Jago

    KCGMÆs Fimiston Open Pit, located in the centre of the historic Golden Mile, is situated above some 3000 kilometres of old underground workings. These workings, both level and vertical, present signif

    Jan 1, 2003

  • AUSIMM
    Risk Based Closure Engineering for Sustainability

    By J M. Dwyer, S Williamson

    Acceptable post-closure performance of decommissioned mining operations is a critical factor in persuading todayÆs environmentally conscious public that the mining industry will not continue to burden

    Jan 1, 2003

  • AUSIMM
    Colliery Planning on a Mini Computer

    By Davies L, Jeffreys J

    The Broken Hill Proprietary Company Limited (BHP) has been successfully using mini computers in its open cut strip and pit coal planning for the past six years. A recent development within the compute

    Jan 1, 1982

  • AUSIMM
    Environmental Monitoring in the Doncaster Area of the National Coal Board

    By Dutton D

    In the British coal mining industry, during the last decade, a great deal of environmental monitoring experience was acquired, particularly in the Doncaster Area of the Yorkshire coal- field, which

    Jan 1, 1983

  • AUSIMM
    The Effect of Sulphur on the Rate of Reduction of Zinc Oxide from Slag

    By Ranklin W. J

    The mechanism and rate-limiting step of carbonaceous reduction of zinc from slags was investigated in the laboratory. Disks of graphite were rotated in ZnO-containing slags at various speeds for fix

    Jan 1, 1993

  • AUSIMM
    Research into the Effect of Combined Modifiers in Magnesite Flotation

    By Zhijing Z, Huiling Z

    The influences on flotabilities of dolomite and magnesite with modifiers and influences on the function of collectors and modifiers with Mg+z Ca+2 were studied. The flotation results of artificial m

    Jan 1, 1993

  • AUSIMM
    Principles of the Ventilation, Fire and Climate Safety Management in Polish Copper Mines

    By A Struminski

    The principles of occupational risk evaluation resulting from the improper ventilation of the underground mines were presented. It was shown that the risk level implies the appropriate planning and us

    Jan 1, 2003

  • AUSIMM
    Hydraulic Backfilling At Homestake

    The hydraulic backfilling of mine tailings has proven very successful at the Homestake Mine in Lead, South Dakota. It allows greater versatility, selectivity and safety in mining. It has also mini

    Jan 1, 1973