Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Fragmentation Optimisation – Adopting Mine to Mill for Reducing Costs and Increasing ProductivityBy V M. Silva, P A. A Martins, V O. Matthew, A L. S Fonseca, E B. Cunha, A J. D Ferrari, E M. S Silva, A C. Silva, D R. T Vilela
The Anglo American phosphate mine is located in the Brazilian state of Goiás and possesses one of Brazil’s most important phosphate rock deposits, with the site being the country’s second largest
Aug 24, 2015
-
The Role of Equipment Suppliers and Mining Consultants in the Mining CycleBy A C. Robertson
Over the past decade there has been continual change in the way that mines have been managed and the component roles of those people who make up the total mine management system. Major issues have inc
Jan 1, 1998
-
Towards the Implementation of Discrete Fracture Network Modelling as a Geotechnical Design Tool – Case Study of Callie Underground MineBy S F. Rogers, K Doumis, J H. Graaf, B J. Barsanti
Advances in technology now allow geotechnical practitioners to better describe the properties and variability of a rock mass through advances in surface and underground mapping, borehole technology an
Nov 5, 2014
-
Life Cycle Assessment and Tailings Management Trade-Off Studies - An Approach to ImplementationTailings management trade-off studies are done for all mining projects. There is wide variability in these studies as their approach, details and outcomes are determined by the experience and focus of
Jan 1, 2009
-
Flotation of Hematite Using C6-C18 Saturated Fatty AcidsThe homologous series of saturated fatty acids investigated in this study generally show a steady gradation of properties with chain length. The solution pKa values were assumed constant at 4.9, howev
Jan 1, 2005
-
Simulation as a Tool for Mine PlanningBy J Greberg
This paper discusses the use of simulation in the mine planning process. A case study on the Newcrest Cadia East project is presented, and the challenges and possibilities for using simulation as a to
Nov 22, 2011
-
Non-Ideal Shock Energy Factor versus Powder Factor for Open Pit Blast Design – ANFO and Chemically-Sensitised EmulsionsBy K G. Fleetwood
This paper proposes an approach to determine the influence of non-ideal detonation characteristics related to the charge diameter, explosive type and confinement conditions on the available shock ener
Nov 8, 2011
-
Application of Ground Magnetic Surveys over Heavy Mineral Sand Strands to Increase Confidence in the Interpreted Continuity of the Modelled ResourcesBy V O’Brien
The suitability of magnetic surveys flown at low altitudes to identify buried heavy mineral (HM) strands has long been accepted. This is despite the low intensity magnetic response often obtained from
Oct 5, 2011
-
Open Cut Mining Adjacent to Ephemeral Creek and Spring Systems ù Pilbara, Western AustraliaThe Pilbara region, located in the north-west of Western Australia, is significant as the second-largest source of iron ore on the planet. Iron ore mines owned and operated by Pilbara Iron are located
Jan 1, 2006
-
Critical state soil mechanics in filtered TSF designBy J Rola
This paper outlines a laboratory-based design method, founded in critical state soil mechanics, for identification of an appropriate compaction specification to ensure dilative conditions prevail acro
Jul 1, 2021
-
REFLUX versus hydraulic classifier – a comparative analysis for hematite concentrate cleaningBy E Bouchard March, F Lavoie, B Legare, K Bourassa
Quebec Iron Ore (QIO), a subsidiary of Champion Iron Limited (Champion), completed the restart of the Bloom Lake iron ore mine located in the heart of the Labrador Trough region of Northern Quebec, Ca
Nov 8, 2021
-
Measured and Modelled Response of a Multistory, Urban Structure to High-frequency Blasting ExcitationBy C Dowding, C Aimone-Martin, P Abeel
This paper presents measurement and analysis of the dynamic response of a five-storey building to very high frequency excitation (>100 Hz) from blasting vibrations originating from a contiguous exc
Aug 24, 2015
-
Incorporating Sustainability into Mining Plant and Infrastructure DesignBy A Murphy
Mining plants and infrastructure, and the decisions made by their designers, can have large impacts on their environmental and social context, commonly referred to as the site or plant footprint. They
Jul 16, 2014
-
The Need for Quality Control in Sampling Due to Evaluation Advances at Anglo PlatinumAnglo Platinum recognised with its expanded operations the need to change its evaluation strategy due to increased sample volumes and the pressure it created at laboratories. The sender/receiver analy
Jan 1, 2008
-
Iron ore transfer chutes – directions after 30 years of scale modellingBy P Donecker
Like all chains, iron ore values chains are only as strong as their weakest link, which in ore processing is often the humble chute. While mechanically the simplest element in the iron ore flow sheet,
Sep 18, 2023
-
Slag-steel reactions in the refining of advanced high-strength steelBy B A. Webler, P Su, P C. Pistorius
Advanced high-strength steels (AHSS) typically have much higher aluminium concentrations (by an order of magnitude or more) than conventional low-carbon aluminium-killed steels. The resulting lower ox
Aug 21, 2024
-
The Status of Mine Water Pollution in South AfricaThis paper presents an overview of the current status of mine water management in South Africa. The regulatory framework within which mine water management operates is set out, based on the principles
Jan 1, 2003
-
Algebraic optimisation of excavation alignment using the stress tensorBy P B. Hills
A simple algebraic method of aligning large scale underground excavations such as a crusher station or workshop or indeed any large cavern or mine layout to the optimal stress condition is outlined. T
Nov 29, 2022
-
Project Evaluation – A Non-Executive Director’s PerspectiveBy R Knight
"In project evaluation there are two matters of keen interest to non-executive directors: the process by which an investment recommendation is reached, as well as the investment itself, as presented.
Mar 8, 2016
-
The Domains Concept – 20 Years on Retrospective, Obstacles and Opportunities for Effective Life-of-Mine ImplementationBy B E. McCarthy
Red Dome Mine was a highly complex gold copper operation developed over a number of phases between mid-1986 to October 1997. With only three years of production ahead at any time, a proactive practica
Jul 16, 2014