Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Classification and Development in Grade Control Blasting for Surface Mines

    By T N. Little

    The grade control process undertaken at mines aims to maximise the value of the ore (valuable product) mined and fed downstream for processing or sale. The full range of grade control activities inclu

    Aug 24, 2015

  • AUSIMM
    Clean Energy and Mining – Future Synergies

    By R Memary

    The environmental and economic impacts of a significant dependence on fossil fuels are affecting the future of sectors such as of mining. These impacts are prompting the Australian Government to seek

    Nov 22, 2011

  • AUSIMM
    Staying in the Game – the Importance of Engineering-based Decisions

    By P J. Fairfield

    This paper reflects on the author’s experience working in site-based technical and management roles over a 29 year period, and the past 12 years in internal and external consulting roles. It discusses

    Jun 22, 2016

  • AUSIMM
    Commissioning - From a Project Manager's Viewpoint

    Commissioning is one of the many phases of a project, it has inter-dependencies with the other phases, as they have amongst themselves, and has its own terminology and distinctive features. Commis

    Jan 1, 1986

  • AUSIMM
    Centrifugal and Positive Displacement Pumping of Titanomagnetite Ironsand

    By I Hustwick

    New Zealand Steel Mining Limited operates two independent sand mining operations on the West Coast of the North Island of New Zealand. Waikato North Head 30 km south of Auckland supplies ironsand con

    Jan 1, 1990

  • AUSIMM
    Proneness of competent over-stressed intact rock to violent fracturing

    By B L. Sainsbury, M F. Lee, A Penney

    For most practical rock engineering purposes, stress versus strength conditions around underground openings for which rock masses fail and their various modes of failure, are reasonably well-understoo

    Nov 30, 2018

  • AUSIMM
    Ballarat East-From Eureka to the 80's

    This paper puts the view that, for one gold deposit in Victoria at least, the Australasian Code for the Reporting of Identified Mineral Resources is severely deficient. The author questions whether

    Jan 1, 1990

  • AUSIMM
    Justifying Slope Design Risks and Costs

    By N M. Player, R P. Varden, E Jones

    "An effective geotechnical design provides an accurate and appropriate assessment, balanced with a mining company’s risk profile. Justifying the cost of slope assessment requires an understanding of t

    Nov 15, 2016

  • AUSIMM
    Microbial Aspects of Environmentally Benign Iron Ore

    Many types of micro-organisms inhabit iron ore deposits contributing to biogenic formation and conversion of iron oxides and associated minerals. Bacteria such as Paenibacillus polymyxa are capable of

    Jan 1, 2009

  • AUSIMM
    Preliminary Design for the Rockwater Power Project, South Island, New Zealand

    By H Asche

    The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak

    Mar 8, 2011

  • AUSIMM
    Characterising the Blasting Properties of Iron Ore

    By A Scott, I Onederra

    Most iron ores occur in mine benches as complex mixtures of lithologies and ore types. This significantly complicates their characterisation for both blast design and fragmentation modelling. A great

    Jul 13, 2015

  • AUSIMM
    Ultra-High-Intensity Blasting - A New Paradigm in Mining

    By G F. Brent, S Hawke, M Rothery, P Dare-Bryan

    Mine-to-mill studies have previously demonstrated downstream productivity benefits from relatively modest increases in blast energy, or powder factor. These increases have up to now been limited by sa

    Sep 26, 2013

  • AUSIMM
    Scenic Railway Tunnel Upgrade in the Blue Mountains, New South Wales – An Approach to Design and Construction

    By A Hughes, S G. Rosin

    This paper presents the design and construction approach adopted for the widening and stabilisation of the existing decline tunnel forming part of the Scenic Railway Upgrade project at Katoomba in the

    Sep 17, 2014

  • AUSIMM
    Re-Invigorating Unloved Projects

    By D Price

    Mining at the Tuckabianna Mining Centre in the Murchison district of Western Australia ceased in 1997, after the production of 550 000 ounces of gold at an average grade of 2.5 g/t from 22 separate op

    Aug 22, 2011

  • AUSIMM
    Preconcentration in the pit – size matters

    By T BoBo, D La Rosa, P Cameron

    Efficient pre-concentration using natural and induced deportment starts with effective blast design. Leveraging these characteristics using Size-Based Grade Engineering® techniques requires detailed u

    Nov 10, 2020

  • AUSIMM
    A Sustainable Future in Management of Dust Emission during Transport of Coal and Iron Ore

    By J Planner

    As Australia’s coal and iron ore export volumes increase to meet international market growth, port terminals, mining operations and rail transport systems can be the source of increased dust emission.

    Nov 22, 2011

  • AUSIMM
    Reclaimed Lignite Mining Areas A73 in Lusatia - Development of Soil Physical Parameters of an Agricultural Site within the First Years after Site Reconstruction

    By J Krnmmelbein, T Raab

    In Lusatia, lignite mining causes major disturbances on the landscape scale. Reclamation procedures are applied to recover the reconstructed landscape for different land use options. In this study we

    Jul 10, 2012

  • AUSIMM
    Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted Annulus

    By M Norbert, P Mok

    The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double

    Sep 17, 2014

  • AUSIMM
    Development and Application of a Piezoelectric Sensor for Turbulence Measurement in Industrial Flotation Cells

    By P Holtham, J Meng, E Tabosa, W Xie

    Turbulence and its distribution are of great importance in flotation, and have received considerable attention recently. However, there is no mature technique to measure turbulence in three-phase (liq

    Sep 1, 2014

  • AUSIMM
    Description of Effective Technology for Silver Recovery from Zinc Cakes Obtained as by-Product in Metallurgical Zinc Plants

    By Sataev IS, Malinovskaja ND, Otrozdenova LA, Knodov NV, Maximov II, Kuznetzou OK

    The technology of flotation recovery of silver from the residue of a zinc plant is described. The peculiarity of this technology is a preliminary pulp conditioning in sodium chloride solution in the

    Jan 1, 1993