Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Sustainability in New Projects - Achieving Outcomes Which are Beyond 'Business as Usual'Many mining companies aim to integrate sustainability principles into their new projects. There is an intention for improvement, but frequently this results in little more than 'business as usual
Jun 1, 2010
-
Liquefaction behaviour of tailings under cyclic simple shear testingBy A Li, H Jinto, M Laxman
The behaviour of tailings under cyclic loading has an impact on the stability and deformation of tailings dams and a good understanding of the cyclic behaviour of the tailings under earthquakes is imp
Jul 23, 2018
-
BHP Billiton West Australian Iron Ore Geometallurgy - Past, Present and FutureBy M Flanagan, T Sua, B Wright, T Carroll, B Van Dijken
"BHP Billiton (BHPB) West Australian Iron Ore (WAIO) conducts an extensive geometallurgy (geomet) program for its iron ore deposits in the Pilbara. The geomet program provides accurate information to
Sep 29, 2013
-
Metso SmartTag - The Next Generation and BeyondBy K J. Riihioja, E Nozawa
SmartTag is a radio frequency identification (RFID) based technology designed to allow tracking of ore from its source through blasting, run-of-mine (ROM) pads, crushers, intermediate stockpiles and f
Sep 26, 2011
-
Tailings Dewatering, Dry Screening and Water Clarification for Reduced Water UsageBy R Norris, M Dunne
Substantial efforts by the industry, as well as by process and equipment designers, have resulted in many innovative developments that provide cost effective reductions in water usage. This paper show
Jan 1, 2006
-
Field Trial of CSIRO VirtuoBlast Technology at the KCGM Super Pit - Part 1: Application to Pre- and Post-Blast MeasurementBy Y Wei, P Soole
This paper gives a brief description of VirtuoBlast technology ù a new, automated and highly interactive stereo vision technology which has been developed in CSIRO Exploration and Mining. VirtuoBlast
Jan 1, 1999
-
Use of Anchored Gaskets in Segmented Bored TunnelsBy A Roseman, T Gruber
Traditional methods for installing gaskets for segmented bored tunnels have relied upon different bonding procedures with adhesives that carry a series of disadvantages to segment producers. Fixation
Sep 17, 2014
-
Development of solid waste-based flux and its application in out-offurnace dephosphorisation of low-silicon hot metalBy Y Zhang, Z Zhao
The green production of the steelmaking process has urgent requirements for fluorine-free fluxes. In this article, a new solid waste-based slagging flux was applied in the external dephosphorisation t
Aug 21, 2024
-
Use of Mineralogy to Interpret Laboratory-Scale Acid Rock Drainage Prediction Tests - A Gold Case StudyBy S T. L Harrison, J-P Franzidis, M Becker, N Dyantyi, J L. Broadhurst
Gold mining is a major contributor to the South African economy, but is associated with several environmental issues such as acid rock drainage (ARD). ARD is due to the oxidation of sulfides in gold t
Sep 26, 2013
-
Implementing and Improving the Mine Plan at the Mt Wright ProjectBy D MacKay
The Mt Wright Project is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. Underground Development of
Mar 21, 2011
-
The Sustainability of Biologically Treated Nickel/Copper Mine Effluent Suitable for IrrigationBy A Geldenhuis, M Hagger, J Maree
Disposal of mine water is a worldwide problem occurring in the coal and gold as well in the metal ore mining areas. Since southern Africa is a (semi) arid region, mining effluents should be treated to
Jan 1, 2003
-
Progress in the Knowledge of Granite Cutting with Diamond WireBy Manca PP, Lassandro R, Caranassios A, Massacci G, Ciccu R
The paper discusses the state of the progress reached in the development of the diamond wire tool for cutting hard rocks. To the advances of this relatively new technology a substantial contributio
Jan 1, 1992
-
Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?ProcessBy T Ireland, S Eratne, W Newns, P Spies
The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest
Sep 17, 2014
-
Martha Hill Mine - The Mining Contractor's ViewpointBy R Butler
Contract m1n1ng in New Zealand developed in the coal industry and has become an element in the success of recently opened hard rock gold mines. At Martha Hill, the mining contractor is undertaking a w
Jan 1, 1991
-
Continuous Carbon Concentration Measurement at Newmont Boddington GoldBy C McCamley
"The requisite for maintaining optimal carbon concentration levels in a carbon-in-leach (CIL) circuit is of paramount importance in the prevention of gold losses. The process’s ability to recover gold
Oct 10, 2016
-
Blast Fragmentation Measurement Based on Three-dimensional Imaging in Sublevel Caving Drawpoints and Underground Excavator Buckets at LKAB KirunaBy M J. Thurley, M Wimmer
To assess the present-day functionality of large-scale sublevel caving at LKAB Kiruna a comprehensive measurement program was undertaken involving blast function, fragmentation and gravity flow. As pa
Aug 24, 2015
-
Development of a Segmental Lining Specification for Steel Fibre Reinforced Concrete Flexural Strength Testing Using Round Panel TestsBy S Kost, R Nievergelt, F Cortes
In recent years, the use of steel fibre-reinforced concrete (SFRC) for segmental tunnel linings has become increasingly popular due to numerous advantages including durability, resistance to spalling,
Sep 17, 2014
-
The Weipa Kaolin ProjectComalco Limited has recently completed construction of a $50 million kaolin plant at the site of its bauxite mining and industrial minerals operation at Weipa. The plant will produce 100,000 tonne
Jan 1, 1986
-
Reflections on Empirical Methods in Geomechanics – The Unmentionables and Hidden RisksBy F T. Suorineni
Empirical methods are deeply rooted in geomechanics. This is a consequence of the recognised complexity of the nature of the rock mass. The usual assumptions of material continuity, homogeneity, isotr
Nov 5, 2014
-
Modelling the Impact of Flash Flotation from Batch Cell Flotation Tests Using LimnBy P Holtham, R Dunne, D Stoll
Flash flotation is a process designed to remove coarse, liberated, fast floating minerals from hydrocyclone underflow. Irrespective of liberation, coarse particles would normally remain in a grinding
Oct 29, 2012