Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Reconnaissance Map of the Bulolo Gold-Fields, Territory of New Guinea

    THE absence of any locality maps of the district of Morobe has been seriously felt by mining engineers engaged on the goldfields, and as it was evident at the beginning of operations that the administ

    Jan 1, 1928

  • AUSIMM
    Hydrology of Final Void and Spoil Catchments

    Reliable predictions of the long-term water quality and water level fluctuations in a final void are vital if mine operators propose to decommission final voids in open cut mining operations. The catc

    Jan 1, 2003

  • AUSIMM
    On-Line Cyanide Analysis and Control

    Cyanide is a significant contributor to the cost of producing gold. Any reduction in cyanide consumption that is achieved through more reliable measurement, and/or more efficient management of cyanide

    Jan 1, 1997

  • AUSIMM
    Risk and Accepted Practice in Open Pit Mining Geomechanics

    The paper examines the current status of risk and accepted practice in mining geomechanics. It explores some deficiencies in human capital, risk analysis and our future technical needs, and suggests w

    Jan 1, 2003

  • AUSIMM
    Blast Manipulation or Crusher Modification?

    By Siddall B

    A brief review of the capabilities and practical limitations of blast simulation packages has been carried out. It is concluded that the simulators accurately reflect size distributions in the mid-r

    Jan 1, 1998

  • AUSIMM
    Reducing Risks at Syncrude Canada Ltd's Mining Operations Through the Application of Technology

    By Fair A, Oxenford J

    Syncrude Canada Ltd operates one of the largest open pit mines in the world at Fort McMurray in northern Alberta, Canada. In 1993, Syncrude mined and processed 131.2 Mt of oil sands to produce 67.0

    Jan 1, 1994

  • AUSIMM
    Particle Size Analysis – Optimising Returns in Iron Ore

    By B Stump

    Reliable particle size analysis in minerals processing plants is a critical factor to the economic return of a plant. As recovery of valuable minerals is compromised for particles outside the optimal

    Jul 11, 2011

  • AUSIMM
    Mine Haul Roads Quantification and Structural Reliability of Haul Trucks

    By Marshall GA, Dickerson AW

    The efficient operation of large haul trucks in large open pit mines requires an economic trade off between the haul route quality, the haul truck payloads and the level of haul truck reliability.

    Jan 1, 1982

  • AUSIMM
    Planning of Air Cooling Systems in Mines and Tunnels

    By J Walasiak

    In the climate planning of mines and tunnelling with anticipated poor climatic conditions, and especially in case of longer working shifts, the main question is whether it can be reliably prevented th

    Jan 1, 2005

  • AUSIMM
    Minimising Mineral Project Risk - New Zealand in a Global Context

    Mining ventures are essentially risky businesses. Explorers and project developers (plus their investors and financiers) attempt to minimise the risks involved or at least manage them. Core considerat

    Jan 1, 2005

  • AUSIMM
    The Benefits of Automated Sampling and Analysis of Iron Ore

    By R Shaw, R Williamson

    Global iron ore demand, sparked by ChinaÆs rapid industrialisation and emergence as the worldÆs newest steel market, has seen iron ore groups investing heavily in production capacity as well as infras

    Jan 1, 2007

  • AUSIMM
    Ni Laterite Mineralogy and Chemistry – A New Approach to Quantification

    By M A. Wells

    A new approach to more reliably predict the Ni (and Fe, Mg) composition of Ni laterites was tested for RC samples from the (siliceous) oxide–style, Siberia North deposit, Kalgoorlie Nickel Project (KN

    Sep 5, 2011

  • AUSIMM
    Predicting Finished Product Properties in the Mining Industry from Pre-Extraction Data

    By J E. Everett

    An essential requirement of product quality control in the mining industry is to be able to reliably predict key quality properties of finished product from the data available before the extraction of

    Sep 5, 2011

  • AUSIMM
    Off-Grid Solar in the Mining Sector - Can Renewable Energy Reduce your Operating Costs?

    By C Chambers

    "AustraliaÆs mining sector faces challenges to its competitiveness; operating costs are being adversely affected as a result of volatile commodity prices and growing international market pressures.Die

    Jul 15, 2013

  • AUSIMM
    Risk Assessment of Consumables Supplies Management in Mines

    By M J. Pejovic, S BoÜevski, I Miljanovic, M Hudej, A Milutinovic, A Petrovski

    The paper deals with the problem of managing the supplies of consumables (energy resources, lubricants, explosives, explosive supplies, tires, spare parts, etc) in mines. After the introductory remark

    Sep 26, 2011

  • AUSIMM
    Reliability of Pillar Design in Coal Mines Based Upon Existing State of the Art

    The far reaching consequences of designing pillars for coal mines, while retaining concern for safety and economics, are cause for the search for refinement of the existing engineering methods to cont

    Jan 1, 1991

  • AUSIMM
    Mining Equipment Maintenance Management

    By M Kuruppu

    Large mining operations require a high percentage of the capital invested in mobile and fixed mining machinery. From an investment point of view this expenditure must be met by an equally high rate of

    Jan 1, 2006

  • AUSIMM
    Maintenance Aspects of Off Highway Trucks - A Case Study

    Engineering availability of the 120/200 tonne Wabco haulpak fleet at Mt. Whaleback was in the mid fifties and unstable. The project to achieve a reliable 66% during 1980 highlighted "plannable" mai

    Jan 1, 1982

  • AUSIMM
    Artificial Neural Network Approach for Evaluation of Weight of Fallen Objects

    By D F. Akhmetov, M Yasuike, M Komazaki, Y Kawa

    Remote monitoring of geological situation at distant regions with complicated relief, including reliable detection of the rock falls and estimation of the scale of accidents, is of great importance fo

    Jan 1, 2003

  • AUSIMM
    Test Method To Assess Engineering Geology Of Coal Mines From Bore-Hole Data

    The task of designing stable high walls and spoil piles in strip coal mines, and stable openings with controlled roofs and floors in underground collieries - within the constraints normally imposed

    Jan 1, 1977