Comparison of Excavation Methods in Different Ground Conditions with the Decision Aids for TunnellingBy F Sandrone, J-P Dudt, J Zhao, E Paltrinieri
Tunnel boring machines (TBMs) excavation is nowadays more and more considered a valuable alternative to conventional tunnelling. As a matter of fact, thanks to its advantages such as greater rate of a
Sep 17, 2014
-
Size by Size Analysis of Operating Characteristics of Jameson Cell Cleaners at the Bajo De Alumbrera Copper/Gold ConcentratorBy A Murphy, D Lauder, J Miranda
Minera Alumbrera Limited operates the Alumbrera concentrator, treating a nominal 80 000 tpd of porphyry gold/copper ore. It is located in Argentina, 1200 km north-west of Buenos Aires in Catamarca Pro
Jan 1, 2000
-
An Integrated Technology Solution for Optimised and Environmentally-controlled BlastsBy C Parihar, R Garg, A Bhandari, S Bhandari
Blasting can impact the efficiency of entire downstream mining operation. Individual technology solutions for blasting have been available in the industry for many years but all of them only cater for
Aug 24, 2015
-
Rehabilitation of Pasminco Broken Hill Mine North OperationBy J Burgess, G Scanlan
In 1993 after over 110 years of mining operations, production ceased at the Broken Hill North Mine. Following the cessation of operations a rehabilitation program was developed to satisfy the requirem
Jan 1, 1998
-
The Sullivan Concentrator ù The Last (and Best) Thirty YearsThe optimal production of the metals needed by society is best achieved by a close synergy between concentrate production and smelting. For over 75 years commencing in 1923, such a close relationship
Jan 1, 2005
-
Discrete Fracture Network Modelling for Tunnel Design in the Sydney BasinBy A L. de Ambrosis, F M. Weir, M Fowler
Traditional kinematic and statistical analyses of geological structure for geotechnical engineering applications, while considered industry standard practice, have some limitations and unrealistic ass
Sep 17, 2014
-
Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning SchedulerBy D R. Seaman, R P. Tooher, B A. Seaman
"Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove
Oct 10, 2016
-
Measurement of Residual Shear Strength Using a Modified Direct Shear ApparatusBy L Tatnell, R Mackay, A Tolooiyan
The multi-reversal direct shear test (MRDS) method is commonly used to measure the residual shear strength of soils. However, when the standard direct shear (DS) apparatus is used, the MRDS method is
Nov 5, 2014
-
The Application of Safescape Ladders at the Cracow and Golden Grove OperationsBy B Hawkins, S Durkin, V Lawrence
The requirement for secondary egress from underground workings has long been regulated in Australia. Escape way systems have evolved from simple airleg rising ladders and timber ladders to steel galva
Mar 24, 2014
-
Theory of Sampling – from missing link to key enabler for process analytical technologyBy R J. Romañach
The theory of sampling (TOS) is now followed in the development of near infrared (NIR) spectroscopic methods for the pharmaceutical industry. TOS has been the guiding light for a two-step approach for
May 9, 2017
-
Reducing Bench Turnover Time and Improving Shovel DigabilityBy D Kavanagh, C Michaud
"A continuous improvement initiative was identified at Kalgoorlie Consolidated Gold Mine’s (KCGM) Fimiston open pit with the goal of reducing bench turnover time and increasing shovel digability by im
Nov 15, 2016
-
Ventilation Officers or Mine Managers? Who should Ultimately be Responsible for Mine Ventilation? A Comparison between Western Australia and QueenslandBy A Halim
"There is still debate about who should ultimately be responsible for the ventilation system in anunderground mine. The Queensland Coal Mining Safety and Health Regulation 2001, states that adedicated
Jun 1, 2012
-
An Overview of Surface Rock Support for Deformable Ground ConditionsBy M P. Sandy, V Louchnikov, V Eremenko, M Orunesu, O Watson
"Surface support is a key component of most ground support systems which are applied as a means of reducing the risk of rockfall occurrence and maintaining serviceability of mine development. Surface
Mar 24, 2014
-
Cadia Expansion – The Impact of Installing High Pressure Grinding Rolls Prior to a Semi-autogenous Grinding MillBy D Engelhardt, G Lane
The Cadia mine has shifted from an open pit operation to the Cadia East underground panel cave. The resulting increase in milled tonnes, more competent ore and the decrease in fines production through
Sep 1, 2014
-
Testing new estimation techniques – rank and replace: a stockwork case studyBy D Finn, D Kentwell
Experience has shown that the E-Type multiple indicator kriging (MIK) estimation technique often works well for resource estimation in stockwork mineralisation that contains a mixture of high and low-
Sep 20, 2017
-
Achieving Sustainable Community Development - Helping Build Appropriate and Resilient Community Governance StructuresThis paper talks about the experiences of groups we have worked with over the last few years in the Asia-Pacific region (Australia, Canada, New Zealand and Papua New Guinea) and the ways that they hav
Jan 1, 2009
-
Designing Flotation Cells For Optimised Flow DynamicsBy T Niitti, J Turunen, P B, A Rinne
In todayÆs marketplace, with high metals prices, many operations are faced with the challenge of improving recovery in the particle size ranges which are normally difficult to recover. This presentati
Jan 1, 2006
-
Field Characterisation of Two Full-Scale Waste Rock PilesBy D J. Williams, G W. Wilson, S, A B. Tran
A comprehensive field program was implemented to evaluate the internal structure and hydrology of two full-scale waste rock piles. The excavation of waste rock dumps for in-pit disposal at the two min
Jan 1, 2003
-
Mapping and Prioritising Rehabilitation of Abandoned Mines in AustraliaBy A M. Lechner, V Glenn, M Edraki, D R. Mulligan, C Unger
With more than 50 000 recorded abandoned mines in Australia, effective management strategies are needed to prioritise and manage health, safety, environmental and socio-economic risks and opportunitie
Jul 10, 2012
-
The Floatability Characterisation Test Rig as a Pilot Plant for Flotation Testing ù An OperatorÆs ViewpointBy J-P Franzidis, M Esvelt, E V. Manla
The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant that is able to treat up to 2 tph solids. It consists of a bank of six 130 L WEMCO« Smart