Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Underground Construction Challenges Associated with the Albany Conglomerate in AucklandBy L J. Strachan, O J. Hawes, S W. Crossen, R C. Roberts
The Albany Conglomerate is a widespread geological unit found in northern areas of Auckland, New Zealand. It has previously been described as part of the early Miocene Waitemata Group which underlies
Sep 17, 2014
-
The Application of Rock Engineering Systems to Block Caving to Identify the Effective ParametersBy M Mohammad Khani
An economic block cave is dependent to the characteristics of the rock mass at stages of caving. These are cave initiation, propagation and ore flow. In this research, the rock engineering system (RES
May 9, 2016
-
A Novel Blasting Technique to Create Drawbells and Eliminate the Undercut Level in Block Cave MiningBy A Tawadrous, D S. Preece
Cave mining is of interest to the mining community as it offers a chance to extract large, deep orebodies with low operating costs and high production rates. It allows for extracting large low-grade o
Aug 24, 2015
-
Development and Implementation of the Garford Dynamic Bolt at the Kanowna Belle MineBy R Lachenicht, J Player, A Thompson, E Villaescusa
Kanowna Belle Gold Mine is a deep, high-stress, sublevel open stoping mine located near Kalgoorlie. Seismic activity during the development cycle presented problems, including concerns regarding the e
Jan 1, 2008
-
Managing floor heave in an underground longwall coal mineBy P Corbett, P Sheffield
Springvale Mine is an underground coal mine in the western coalfield of New South Wales which utilises retreat longwall mining technique. The mine encountered significant gateroad floor heave issues d
Nov 30, 2018
-
A Fine Looking Sample – the Importance of Fines in Grade Control Sampling to Mine to Mill ReconciliationBy B Reid
"Since the commencement of mining operations at the Cowal Gold Operations (CGO) in 2005, reverse circulation (RC) drilling has been the preferred method for grade control (GC) sample collection. This
Nov 15, 2016
-
Risk-Based Ore Selection from Conditionally Simulated Block ModelsBy J E. Everett, F Grobler
This study considers realistic data for a planned open pit iron ore mine, but is applicable to any open pit situation. By interpolating drill hole data, grades are generated for a rectangular block mo
Aug 12, 2013
-
Pillar Extraction at the Doe Run Company, 1991-1998 (82799d0e-2b30-4c7e-911c-ac1c973112a1)By Yanske TR, Lane WL
The Doc Run Company and its predecessors have been mining for over 130 years utilising the room and pillar mining method. This method has left approximately 20 per cent of the orebody in the remaini
Jan 1, 1998
-
The Use of Sprayable Waterproofing Membranes in Underground Structures – Concept, Design Options, Benefits and LimitationsBy W Mahoney, F Clement, E Saraiva
Prefabricated waterproofing sheet membranes are extremely complicated to install in underground sections with complex geometries and, despite being already subjected to quality tests in the factory, t
Sep 17, 2014
-
Ventilation Surveys and Model Building - A ConsultantÆs OpinionBy J Rowland
"This paper was primarily put together in order to demonstrate what are believed to be acceptablestandards, in relation to ventilation surveys and the subsequent model assembly process. Thiswas brough
Jun 1, 2012
-
Measuring the Effectiveness of Change through Best Practice ReconciliationBy G Pattenden, R Hargreaves, P Pettit
"Even with the cyclic nature of mining, when it comes down to it, the bottom line is that whatever direction the commodity market is going there is always a desire to improve the economics of an opera
Nov 15, 2016
-
Glencore Mount Isa lead zinc flotation circuit – experiences from the implementation of model predictive controlBy A Price, D Okle, K Brooks
The operation of flotation plants has been improved over the years by use of fundamentally based design techniques, a better understanding of reagent chemistry, online metal analysis and the use of di
Aug 29, 2018
-
Translating the Challenges of Sustainability and Eco-Efficiency into Improved Business Performance at Newmont OperationsBy A J. Minns
This paper addresses the question: how can the minerals industry remain viable; viable in the sense that we are able to access land for exploration and discovery, we are able to develop and operate mi
Jan 1, 2004
-
Characterisation of Ore Types and Beneficiation Behaviour Using Normative MineralsBy A E. Waltho, W J. Shaw
Predicting the physical characteristics of various ore types has for long been a difficult problem during mining. Grade control practices tend to concentrate on the chemical grade of the ore. Estimati
Jan 1, 1999
-
Two-Dimensional, Evaporative Flux Cover/Cap Analysis for Prevention of Acid Mine DrainageBy J Krahn
In designing climate exposed soil structures such as caps and covers over mine waste it is necessary to include the wetting and drying influences of the local climate in order to accurately predict th
Jan 1, 2003
-
Metallurgical Performance Models to Improve Cut-Off Grade Determination at Mount Isa MinesBy J Simpson, M Johnston
Recently Mount Isa Mines undertook a study to review the lead-zinc orebodies to extent of resource and reserves and determine the new life-of-mine schedule, as the Mount Isa and Hilton orebodies had n
Jan 1, 2003
-
Design Developments of the Jameson CellBy S Bourke, R Stone, B Hill
Since Jameson Cell flotation technology was first installed in a coal flotation application in 1988/89 at Newlands Coal Handling and Preparation Plant (CHPP) there have been fundamental improvements t
Jan 1, 2005
-
Community Health Considerations from Mining Executives and Managers in Western CanadaBy M Scoble, A Ostry, J Shandro
Mining companies are not ill-informed on the topic of community health. There have been a number of research studies that have illuminated community health issues associated with mining, especially in
Nov 20, 2012
-
The Contribution of BHP BillitonÆs Ekati Diamond MineTM to Sustainable Development in CanadaÆs NorthBy R Beaulieu, D Burlingame, C Hanks
The Ekati Diamond MineÖ is CanadaÆs first diamond mine and is located 300 kilometres northeast of Yellowknife in the Northwest Territories. The development of the mine supports sustainable development
Jan 1, 2002
-
Ventilation contaminant characterisation for a greenfield projectBy A Hatt
This paper presents a case study of characterisation work undertaken at a greenfield exploration project to provide engineering and OH&S inputs for the design of a ventilation system. The paper discus
Oct 12, 2022