Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Grade Estimation from Radial Basis Functions – How Does it Compare with Conventional Geostatistical Estimation?By P F. Hodkiewicz, J de Lacey, M Stewart, R Lane
"Implicit modelling is an approach to spatial modelling in which the distribution of a target variable is described by a unique mathematical function that is derived directly from the underlying data
Aug 18, 2014
-
Coarse Liberation and Recovery of Free Gold and Gold Sulfide Carriers for Energy Reduction in Process PlantsBy M Davies, G Theletsane, A H. Gray
Recovery of gold from gold ores has been driven by the available technology and its configuration in the process plant flow sheet.Conventional practice in test work programs has the ore being ground f
Sep 1, 2014
-
Status Quo and Future Evaluations of Global Rare Earth Mining (with Respect to Special Rare Earth Element-industry Criteria)By H Mischo, G Barakos, J Gutzmer
The continuously growing demand for rare earth elements (REEs), in combination with the crisis of 2009 and the price spike of 2011, has initiated a treasure hunt for rare earth deposits all over the w
Nov 4, 2015
-
Geologists and the Value Chain – How Material Characterisation by Modern Mineralogy can Optimise Design and Operation of Processing FacilitiesBy K Ehrig, C Lower, V Liebezeit, M Smith, E Macmillan
"Minerals, minerals, minerals. Elements occur in the earth as minerals. If local physical, chemical and structural conditions are conducive to concentrating these minerals to sufficiently high abundan
Aug 18, 2014
-
Reversing the Trend in Open Pit Mining Equipment OutputBy T Trott, M Lewis, G Lumley
The analysis of equipment trends in The AusIMMÆs revision of Monograph 19 - Australasian Mining and Metallurgical Operating Practices (AMMOP) (in prep) in the paper by Graham Lumley raised some intere
Sep 18, 2012
-
Live Track Railroad Tunnel Repair and Clearance Improvement in the United StatesBy J Schrank
Double-stack trains in the United States date back to the early 1980s, starting about the time deregulation of the rail industry occurred. Freight rail became increasingly more competitive to trucking
Sep 17, 2014
-
Determination of the Sampling Liberation Diameter in a High-Grade Coarse Gold Ore by High-Resolution X-ray Computed TomographyBy I M. Platten, Y Xie, R-M F. Bell, S C. Dominy, L E. Howard, R C. A Minnitt
For any resource evaluation program, the collection and processing of representative samples for assaying is critical. Sampling, sample preparation and assay protocols must be designed to suit the sty
Aug 21, 2012
-
On the Joint Multipoint Simulation of Discrete and Continuous Geometallurgical ParametersBy K G. van den Boogaart, M Lehmann, U Mueller
Geometallurgical parameters are descriptions of the mineralogy and microstructure of the ore determining its mineralogical and microstructural characteristics. From a conditional geostatistical simula
Nov 24, 2014
-
Post Closure Management of the Mt Leyshon Gold Mine - Water the IntegratorBy T Baumgartl, D Mulligan, R Haymont
Mining at the Mt Leyshon Gold Mine in semi-arid north Queensland stopped in 2002. Newmont Australia has recently initiated a thorough post-closure water management study of the site by revisiting the
Jan 1, 2006
-
Beyond NPV - A Review of Valuation Methodologies and Their Applicability to Water in MiningBy D Brereton, C J. Moran
In this era of rising focus on the social and environmental costs and benefits of mining operations, the valuation methodologies used to assess such impacts become increasingly important. Within an in
Jan 1, 2006
-
Prognostic models for electroslag remelting process and slag engineeringBy D Stepanenko, G Stovpchenko, L Lisova, D Togobitskaya, L Medovar
Classical electroslag remelting of consumable electrodes is a drop-by-drop melt feeding through a slag layer into a renewing molten metal bath, slowly solidifying into a homogeneous, dense, defectfree
Aug 21, 2024
-
Distribution of Pb, Zn, Fe, As, Sn, Sb, Bi and Ni between oxide liquid and metal in the ‘CuO0.5’-CaO-AlO1.5 system in equilibrium with Cu metal at 1400°CBy E Jak, G Khartcyzov, M Shevchenko
The increasing complexity of ore resources and recycled materials in the feed of pyrometallurgical processes present a technical challenge to the metallurgical engineers working on maximising the reco
Jun 19, 2024
-
Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fillBy D Pateman, F de Fredrick
The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)
Mar 15, 2021
-
Characterisation and assessment of B2O3 added LF slagBy S Kakara, A Kamaraj, S S. Varanasi, B V. R Mandalika, M B. Shaik
The properties of top slags play a very important role in secondary steelmaking. Fluxes should be chosen based on the ladle furnace (LF) slag requirements like viscosity, melting temperature, sulfide
Aug 21, 2024
-
Sustainability in New Projects - Achieving Outcomes Which are Beyond 'Business as Usual'Many mining companies aim to integrate sustainability principles into their new projects. There is an intention for improvement, but frequently this results in little more than 'business as usual
Jun 1, 2010
-
Wet grinding, settling and filtering characteristics of Australian and Brazilian iron oresBy Q Zhou, J Pan, D Q. Zhu, C C. Yang
Oxidised pellets have become an indispensable high-quality charge for blast furnaces (BF) due to their uniform particle size, high iron grade, high mechanical strength, good metallurgical performance,
Sep 18, 2023
-
Development of mine operation value chain flowsheets fine-tuned and constraint based on the process information (PI) data to evaluate proposed operation strategies and ore pre-treatment technologiesBy E Amini, N Beaton
Application of ore pre-treatment technologies such as Grade Engineering and in-pit ore treatment require comprehensive analysis to show proven value is being generated by switching away from the curre
Nov 10, 2020
-
A Collaborative Approach to Iron Ore Beneficiation at Assmang Khumani Processing PlantBy S Döpp
Commencing with early experiences in iron ore beneficiation made at Beeshoek Mine, the paper follows through the process of extensive mineralogical and metallurgical investigations carried out during
Jul 11, 2011
-
Prevention of Blast Induced Damage to Underground Mine Infrastructure from Open Pit Operations – A Case StudyBy A Campbell
Open pit blasting at Ernest Henry Mining has the potential to cause damage to nearby underground workings. This paper is a case study of the blast vibration management project that was conducted to en
Nov 8, 2011
-
Concept Design of the Central Business District Rail Link, AucklandBy J Q. Cooper
The New Zealand rail authority, Kiwi Rail and Auckland Regional Transport Authority (ARTA), are jointly planning a new mainline rail link between Auckland’s downtown Britomart Station and the existing
Mar 8, 2011